Please note corrections include not only the addition of some transferred material from India what allos me to produce an additional o,1pts of infrastructure, but also moving the lay down date of the Helspanth carrier forward one month. The latter became necessary to keep a constant 3 factories dedicated for infrastructure.
[SIZE=3]SAE Quarterly Reports[/SIZE]
No. 78 – April to June 1940
Transfers/Notes:
Second payment from China (750ts) for purchase of licence for destroyer class
First payment from India (1400ts) for purchase of licence for heavy cruiser class
Factories:
26 factories total can be used.
Fixed factories
3 factories will be fixed to produce infrastructure points for 1940.
Flexible factories
729ts material transferred from Q1 (incl. material recovered from scrap yard).
21,663ts of material need to be produced in this quarter (22 factories).
1 factory producing 0,1pts of infrastructure.
Infrastructure points used this quarter:
0,4pts put into factory #27 for a total of 7,5pts at the end of Q2/40.
Ships:
Minor vessels
Completed Units
34x UJ26-class ASW launch
31x UJ30-class ASW launch
24x UJ35-class ASW launch
36x R28-class motor launch
23x R31-class motor launch
8x R37-class motor launch
26x S34-class motor torpedo boat
12x S36-class motor torpedo boat
8x Tree-class minesweeper (Type 16)
8x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
12x Coastal-class minesweeper (Type 37)
6x Seychelles-class minesweeper (Type 38)
4x Circe-class sloops
4x Polar II-class sloops
12x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)
8x Planet-class light destroyer (Type 29)
8x Bird-class light destroyer (Type 35)
5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter
4x GB35-class river gun boat
2x General-class river gun boat
2x RM36A-class river monitors
On Trials
2x MS38-class mine sweeper
- MS38- 8 Aride running trials until August 40
- MS38-4 Cerf running trials until August 40
3x Bush-class minesweeper
- Buckthorn running trials until May 40
- Firethorn running trials until July 40
- Blackthorn running trials until September 40
Ordered Units
1x Mountain-class frigate (11 month á 69ts material necessary per unit)
- F40-1 Cathedral Peak laid down in Durban on a Type 1 slip in June 40, completed in April 41
Rebuilds/Refits/Repairs
2x Bush-class minesweeper (2 month á 40ts material necessary per unit)
- Cornel entering a Type 0 dock in Douala in April. Leaving the dock in April 40, the minesweeper will stay in the yard until June 40
- Cranberry entering a Type 0 dock in Douala in June. Leaving the dock in June 40, the minesweeper will stay in the yard until July 40
Scrapping
None
Destroyers
Completed Units
10x Hound-class torpedoboat (Type 26)
8x Reptile-class torpedoboat (Type 35)
6x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
5x Fish-class destroyer (Type 38)
8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
3x Weapon-class large destroyer (Type 36)
On Trials
2x Fish-class destroyer
- DD38B-6 Barracuda running trials until May 40
- DD38B-7 Trout running trials until May 40
1x DD21-class destroyer
- Doto running trials until September 40
1x Weapon-class large destroyer
- DL36-3 Ballista running trials until April 40
Ordered Units
1x Fish-class destroyer (11 month á 143ts material necessary per unit)
- DD38B-8 Mackerel laid down in Daressalam on a Type 2 slip in October 39, completed in July 40
Rebuilds/Refits/Repairs
1x DD21-class destroyer (5 month á 68ts material necessary per unit)
- Euarne entering a Type 1 dock in Libreville in December. Leaving the dock in January 40, the destroyer will stay in the yard until April 40
Scrapping
None
Class B Cruisers
Completed Units
5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
2x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
2x Nampula II-class light cruiser (Type 36)
2x Charybdis-class light cruiser (Type 38)
2x Daphne-class anti aircraft cruiser (Type 34)
2x Danae-class anti aircraft cruiser (Type 36)
4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)
1x Lightning-class mine cruiser
1x Hedgehog-class mine cruiser
On Trials
None
Ordered Units
None
Repairs/Rebuilds/Refits
None
Scrapping
None
Class A Cruisers
Completed Units
2x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
2x Hero-class (Type 33)
2x Radiance-class
1x Vengeance-class
On Trials
None
Ordered Units
1x CA36E-class heavy cruiser (24 month á 624ts material necessary per unit)
- CA36E-2 Revenge laid down in Montevideo on a Type 4 slip in December 38, completed in November 40
1x CA23-class heavy cruiser
- Good Hope running trials until May 40
Repair/Refits
1x CA23-class heavy cruiser (6 month and 526ts of material necessary)
- Good Lopez entering a Type 3 dock in Durban in January. Leaving the dock in March 40, the cruiser will stay in the yard until June 40
Scrapping
None
Capital Units
Completed Units
1x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
2x Monarch-class
On Trials
None
Ordered Units
2x BB37A-III-class battleship (57 month á 838ts material necessary per unit)
- Thunderer laid down in Durban on a Type 4 slip in June 37, completed in February 42
- Superb laid down in Montevideo on a Type 4 slip in September 37, completed in May 42
2x BB37A-IV-class battleship (57 month á 835ts material necessary per unit)
- Implacable laid down in Durban on a Type 4 slip in April 38, completed in December 42
- Indomitable laid down in Port Elizabeth on a Type 4 slip in November 38, completed in July 43
Rebuilds/Refits
1x Mauritius-class battleship (19 month and 762ts of material necessary)
- Reunion entering a Type 3 dock in Buenos Aires in August 39. Leaving the dock in February 40, the battleship will stay in the yard until February 41
Scrapping
None
Coastal Defence Units
Completed Units
1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
1x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship
1x LCDS-class
2x LCDS-2-class
On Trials
None
Ordered Units
None
Rebuilds/Refits
None
Carriers
Completed Units
1x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)
2x Anvil-class light fleet carrier (Type 30)
1x Endress-class light fleet carrier (Type 36)
1x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
3x Unicorn-class floatplane carrier
On Trials
None
Ordered Units
1x CV37C-class fleet carrier (36 month á 750ts material necessary per unit)
- Asgard laid down in Buenos Aires on a Type 4 slip in August 37, completed in July 40
1x CV40B-class fleet carrier (33 month á 726ts material necessary per unit)
- Helspanth laid down in Durban on a Type 3 slip in April 40, completed in December 42
2x AV39-class floatplane carrier (1 month á 432ts material necessary per unit)
- Wyvern laid down in Daressalam on a Type 2 slip in December 39, completed in March 41
- Chimera laid down in Montevideo on a Type 2 slip in October 39, completed in January 41
Rebuilds/Refits
None
Class A Submarines
Completed Units
7x F-class submarine
3x J-class submarine
2x L-class submarine
8x M-class submarine
On Trials
1x O-class fleet submarine
- O5 running trials until May 40
Ordered Units
7x O-class fleet submarine (11 month á 107ts material necessary per unit)
- O7 laid down on Prince Eduard Islands on a Type 0 slip in July 39, completed in May 40
- O3 laid down in Majunga on a Type 1 slip in July 39, completed in May 40
- O1 laid down in Port Louis on a Type 0 slip in July 39, completed in May 40
- O6 laid down in Douala on a Type 0 slip in December 39, completed in October 40
- O8 laid down on Prince Eduard Islands on a Type 0 slip in June 40, completed in April 41
- O4 laid down in Majunga on a Type 1 slip in June 40, completed in April 41
- O2 laid down in Port Louis on a Type 1 slip in June 40, completed in April 41
1x Q-class fleet submarine (11 month á 122ts material necessary per unit)
- Q1 laid down on Montevideo on a Type 0 slip in April 40, completed in February 41
Repairs/Rebuilds/Refits
None
Scrapping
3x F-class submarine (4 month total, 1 month in Type 1 dock)
- F3 scrapping in Durban starting in September, finished in December 39 – 120ts received from hull for Q2/1940
- F7 scrapping in Durban starting in Januar, finished in April 40 – 120ts received from hull for Q4/1940
- F8 scrapping in Durban starting in May, finished in August 40 – 120ts received from hull for Q1/1941
Class B Submarines
Completed Units
2x H-class submarine
13x K-class submarine
8x N-class submarine
On Trials
None
Ordered Units
1x P-class coastal mine submarine (5 month á 100ts material necessary per unit)
- P1 laid down in Cape Town on a Type 0 slip in February 40, completed in June 40
Repairs/Rebuilds/Refits
None
Scrapping
1x I-class coastal submarine (4 month total, 1 month in Type 0 dock)
- I9 scrapping in Libreville starting in September, finished in December 39 – 60ts received from hull for Q2/1940
3x H-class coastal submarine (4 month total, 1 month in Type 0 dock)
- H5 scrapping in Mar del Plata starting in September, finished in December 39 – 60ts received from hull for Q2/1940
- H8 scrapping in Mar del Plata starting in January, finished in April 40 – 60ts received from hull for Q4/1940
- H10 scrapping in Mar del Plata starting in May, finished in August 40 – 60ts received from hull for Q1/1941
Landing Vehicles
Completed Units
1x LSC38-class landing ship (ex-AV22)
1x LSC39-class landing ship (ex-TD19)
2x LSA38-class landing ship
2x LST38-class landing ship
6x LSI38-class landing ship
On Trials
2x LSI38-class landing ship
- LSI38-7 running trials until April 40
- LSI38-8 running trials until June 40
2x LST38-class landing ship
- LST38-3 running trials until April 40
- LST38-4 running trials until June 40
Ordered Units
None
Repairs/Rebuilds/Refits
None
Scrapping
None
Non-combatants
Completed Units
1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)
1x FV32-class fleet support ship
2x FV36-class fleet support ship
On Trials
None
Ordered Units
None
Repairs/Rebuilds/Refits
1x TD19-class tender (5 month and 52ts of material necessary, refit into landing ship)
- Mossel Bay entering a Type 1 dock in Port Elizabeth in January. Leaving the dock in February 40, the tender will stay in the yard until May 40
--------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
89 ASW launches
67 motor launches
38 motor torpedo boats
52 minesweepers
46 small patrol crafts
6 river gunboat
2 river monitors
95 TB/DD/DLs of less than 2,000ts
45 cruisers category b
10 cruisers category a
13 capital units
7 costal defence ships
6 aircraft carrier
6 floatplane carrier
20 submarines category a
23 submarines category b
12 landing vehicles
18 armed tenders
3 fleet support ship
plus numerous auxiliary vessels of all kind.