You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Thursday, January 20th 2011, 9:55pm

Quarterly Report #78 for the SAE

[SIZE=3]SAE Quarterly Reports[/SIZE]

No. 78 – April to June 1940


Transfers/Notes:


Second payment from China (750ts) for purchase of licence for destroyer class


Factories:

26 factories total can be used.

Fixed factories

3 factories will be fixed to produce infrastructure points for 1940.

Flexible factories

729ts material transferred from Q1 (incl. material recovered from scrap yard).

22,337ts of material need to be produced in this quarter (23 factories).

0 factory producing 0,0pts of infrastructure.

Infrastructure points used this quarter:

0,3pts put into factory #27 for a total of 7,4pts at the end of Q2/40.


Ships:

Minor vessels

Completed Units

34x UJ26-class ASW launch
31x UJ30-class ASW launch
24x UJ35-class ASW launch

36x R28-class motor launch
23x R31-class motor launch
8x R37-class motor launch

26x S34-class motor torpedo boat
12x S36-class motor torpedo boat

8x Tree-class minesweeper (Type 16)
8x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
12x Coastal-class minesweeper (Type 37)
6x Seychelles-class minesweeper (Type 38)

4x Circe-class sloops
4x Polar II-class sloops

12x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)

8x Planet-class light destroyer (Type 29)
8x Bird-class light destroyer (Type 35)

5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter

4x GB35-class river gun boat
2x General-class river gun boat
2x RM36A-class river monitors

On Trials

2x MS38-class mine sweeper
- MS38- 8 Aride running trials until August 40
- MS38-4 Cerf running trials until August 40

3x Bush-class minesweeper
- Buckthorn running trials until May 40
- Firethorn running trials until July 40
- Blackthorn running trials until September 40

Ordered Units

1x Mountain-class frigate (11 month á 69ts material necessary per unit)
- F40-1 Cathedral Peak laid down in Durban on a Type 1 slip in June 40, completed in April 41

Rebuilds/Refits/Repairs

2x Bush-class minesweeper (2 month á 40ts material necessary per unit)
- Cornel entering a Type 0 dock in Douala in April. Leaving the dock in April 40, the minesweeper will stay in the yard until June 40
- Cranberry entering a Type 0 dock in Douala in June. Leaving the dock in June 40, the minesweeper will stay in the yard until July 40

Scrapping

None


Destroyers

Completed Units

10x Hound-class torpedoboat (Type 26)
8x Reptile-class torpedoboat (Type 35)

6x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
5x Fish-class destroyer (Type 38)

8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
3x Weapon-class large destroyer (Type 36)

On Trials

2x Fish-class destroyer
- DD38B-6 Barracuda running trials until May 40
- DD38B-7 Trout running trials until May 40

1x DD21-class destroyer
- Doto running trials until September 40

1x Weapon-class large destroyer
- DL36-3 Ballista running trials until April 40

Ordered Units

1x Fish-class destroyer (11 month á 143ts material necessary per unit)
- DD38B-8 Mackerel laid down in Daressalam on a Type 2 slip in October 39, completed in July 40

Rebuilds/Refits/Repairs

1x DD21-class destroyer (5 month á 68ts material necessary per unit)
- Euarne entering a Type 1 dock in Libreville in December. Leaving the dock in January 40, the destroyer will stay in the yard until April 40

Scrapping

None


Class B Cruisers

Completed Units

5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
2x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
2x Nampula II-class light cruiser (Type 36)
2x Charybdis-class light cruiser (Type 38)

2x Daphne-class anti aircraft cruiser (Type 34)
2x Danae-class anti aircraft cruiser (Type 36)

4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)

1x Lightning-class mine cruiser
1x Hedgehog-class mine cruiser

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Class A Cruisers

Completed Units

2x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
2x Hero-class (Type 33)

2x Radiance-class
1x Vengeance-class

On Trials

None

Ordered Units

1x CA36E-class heavy cruiser (24 month á 624ts material necessary per unit)
- CA36E-2 Revenge laid down in Montevideo on a Type 4 slip in December 38, completed in November 40

1x CA23-class heavy cruiser
- Good Hope running trials until May 40

Repair/Refits

1x CA23-class heavy cruiser (6 month and 526ts of material necessary)
- Good Lopez entering a Type 3 dock in Durban in January. Leaving the dock in March 40, the cruiser will stay in the yard until June 40

Scrapping

None


Capital Units

Completed Units

1x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
2x Monarch-class

On Trials

None

Ordered Units

2x BB37A-III-class battleship (57 month á 838ts material necessary per unit)
- Thunderer laid down in Durban on a Type 4 slip in June 37, completed in February 42
- Superb laid down in Montevideo on a Type 4 slip in September 37, completed in May 42

2x BB37A-IV-class battleship (57 month á 835ts material necessary per unit)
- Implacable laid down in Durban on a Type 4 slip in April 38, completed in December 42
- Indomitable laid down in Port Elizabeth on a Type 4 slip in November 38, completed in July 43

Rebuilds/Refits

1x Mauritius-class battleship (19 month and 762ts of material necessary)
- Reunion entering a Type 3 dock in Buenos Aires in August 39. Leaving the dock in February 40, the battleship will stay in the yard until February 41

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
1x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship

1x LCDS-class
2x LCDS-2-class

On Trials

None

Ordered Units

None

Rebuilds/Refits

None


Carriers

Completed Units

1x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)

2x Anvil-class light fleet carrier (Type 30)
1x Endress-class light fleet carrier (Type 36)

1x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
3x Unicorn-class floatplane carrier

On Trials

None

Ordered Units

1x CV37C-class fleet carrier (36 month á 750ts material necessary per unit)
- Asgard laid down in Buenos Aires on a Type 4 slip in August 37, completed in July 40

1x CV40B-class fleet carrier (33 month á 726ts material necessary per unit)
- Helspanth laid down in Durban on a Type 3 slip in May 40, completed in January 43

2x AV39-class floatplane carrier (1 month á 432ts material necessary per unit)
- Wyvern laid down in Daressalam on a Type 2 slip in December 39, completed in March 41
- Chimera laid down in Montevideo on a Type 2 slip in October 39, completed in January 41

Rebuilds/Refits

None


Class A Submarines

Completed Units

7x F-class submarine
3x J-class submarine
2x L-class submarine
8x M-class submarine

On Trials

1x O-class fleet submarine
- O5 running trials until May 40

Ordered Units

7x O-class fleet submarine (11 month á 107ts material necessary per unit)
- O7 laid down on Prince Eduard Islands on a Type 0 slip in July 39, completed in May 40
- O3 laid down in Majunga on a Type 1 slip in July 39, completed in May 40
- O1 laid down in Port Louis on a Type 0 slip in July 39, completed in May 40
- O6 laid down in Douala on a Type 0 slip in December 39, completed in October 40
- O8 laid down on Prince Eduard Islands on a Type 0 slip in June 40, completed in April 41
- O4 laid down in Majunga on a Type 1 slip in June 40, completed in April 41
- O2 laid down in Port Louis on a Type 1 slip in June 40, completed in April 41

1x Q-class fleet submarine (11 month á 122ts material necessary per unit)
- Q1 laid down on Montevideo on a Type 0 slip in April 40, completed in February 41

Repairs/Rebuilds/Refits

None

Scrapping

3x F-class submarine (4 month total, 1 month in Type 1 dock)
- F3 scrapping in Durban starting in September, finished in December 39 – 120ts received from hull for Q2/1940
- F7 scrapping in Durban starting in Januar, finished in April 40 – 120ts received from hull for Q4/1940
- F8 scrapping in Durban starting in May, finished in August 40 – 120ts received from hull for Q1/1941


Class B Submarines

Completed Units

2x H-class submarine
13x K-class submarine
8x N-class submarine

On Trials

None

Ordered Units

1x P-class coastal mine submarine (5 month á 100ts material necessary per unit)
- P1 laid down in Cape Town on a Type 0 slip in February 40, completed in June 40

Repairs/Rebuilds/Refits

None

Scrapping

1x I-class coastal submarine (4 month total, 1 month in Type 0 dock)
- I9 scrapping in Libreville starting in September, finished in December 39 – 60ts received from hull for Q2/1940

3x H-class coastal submarine (4 month total, 1 month in Type 0 dock)
- H5 scrapping in Mar del Plata starting in September, finished in December 39 – 60ts received from hull for Q2/1940
- H8 scrapping in Mar del Plata starting in January, finished in April 40 – 60ts received from hull for Q4/1940
- H10 scrapping in Mar del Plata starting in May, finished in August 40 – 60ts received from hull for Q1/1941


Landing Vehicles

Completed Units

1x LSC38-class landing ship (ex-AV22)
1x LSC39-class landing ship (ex-TD19)
2x LSA38-class landing ship
2x LST38-class landing ship
6x LSI38-class landing ship

On Trials

2x LSI38-class landing ship
- LSI38-7 running trials until April 40
- LSI38-8 running trials until June 40

2x LST38-class landing ship
- LST38-3 running trials until April 40
- LST38-4 running trials until June 40

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)

1x FV32-class fleet support ship
2x FV36-class fleet support ship

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

1x TD19-class tender (5 month and 52ts of material necessary, refit into landing ship)
- Mossel Bay entering a Type 1 dock in Port Elizabeth in January. Leaving the dock in February 40, the tender will stay in the yard until May 40


--------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

89 ASW launches
67 motor launches
38 motor torpedo boats
52 minesweepers
46 small patrol crafts
6 river gunboat
2 river monitors
95 TB/DD/DLs of less than 2,000ts
45 cruisers category b
10 cruisers category a
13 capital units
7 costal defence ships
6 aircraft carrier
6 floatplane carrier
20 submarines category a
23 submarines category b
12 landing vehicles
18 armed tenders
3 fleet support ship

plus numerous auxiliary vessels of all kind.

2

Thursday, January 20th 2011, 10:16pm

missing 1400t from India for the license of the Hyderabad. Remember I told I was going to pay at the end of construction and ships are almost completed. Remaining 400t will be paid in Q3 1940.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

3

Friday, January 21st 2011, 12:46pm

Okay, thanks. I will correct my report and re-post.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

4

Friday, January 21st 2011, 12:50pm

Corrected report

Please note corrections include not only the addition of some transferred material from India what allos me to produce an additional o,1pts of infrastructure, but also moving the lay down date of the Helspanth carrier forward one month. The latter became necessary to keep a constant 3 factories dedicated for infrastructure.

[SIZE=3]SAE Quarterly Reports[/SIZE]

No. 78 – April to June 1940


Transfers/Notes:


Second payment from China (750ts) for purchase of licence for destroyer class
First payment from India (1400ts) for purchase of licence for heavy cruiser class

Factories:

26 factories total can be used.

Fixed factories

3 factories will be fixed to produce infrastructure points for 1940.

Flexible factories

729ts material transferred from Q1 (incl. material recovered from scrap yard).

21,663ts of material need to be produced in this quarter (22 factories).

1 factory producing 0,1pts of infrastructure.

Infrastructure points used this quarter:

0,4pts put into factory #27 for a total of 7,5pts at the end of Q2/40.


Ships:

Minor vessels

Completed Units

34x UJ26-class ASW launch
31x UJ30-class ASW launch
24x UJ35-class ASW launch

36x R28-class motor launch
23x R31-class motor launch
8x R37-class motor launch

26x S34-class motor torpedo boat
12x S36-class motor torpedo boat

8x Tree-class minesweeper (Type 16)
8x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
12x Coastal-class minesweeper (Type 37)
6x Seychelles-class minesweeper (Type 38)

4x Circe-class sloops
4x Polar II-class sloops

12x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)

8x Planet-class light destroyer (Type 29)
8x Bird-class light destroyer (Type 35)

5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter

4x GB35-class river gun boat
2x General-class river gun boat
2x RM36A-class river monitors

On Trials

2x MS38-class mine sweeper
- MS38- 8 Aride running trials until August 40
- MS38-4 Cerf running trials until August 40

3x Bush-class minesweeper
- Buckthorn running trials until May 40
- Firethorn running trials until July 40
- Blackthorn running trials until September 40

Ordered Units

1x Mountain-class frigate (11 month á 69ts material necessary per unit)
- F40-1 Cathedral Peak laid down in Durban on a Type 1 slip in June 40, completed in April 41

Rebuilds/Refits/Repairs

2x Bush-class minesweeper (2 month á 40ts material necessary per unit)
- Cornel entering a Type 0 dock in Douala in April. Leaving the dock in April 40, the minesweeper will stay in the yard until June 40
- Cranberry entering a Type 0 dock in Douala in June. Leaving the dock in June 40, the minesweeper will stay in the yard until July 40

Scrapping

None


Destroyers

Completed Units

10x Hound-class torpedoboat (Type 26)
8x Reptile-class torpedoboat (Type 35)

6x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
5x Fish-class destroyer (Type 38)

8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
3x Weapon-class large destroyer (Type 36)

On Trials

2x Fish-class destroyer
- DD38B-6 Barracuda running trials until May 40
- DD38B-7 Trout running trials until May 40

1x DD21-class destroyer
- Doto running trials until September 40

1x Weapon-class large destroyer
- DL36-3 Ballista running trials until April 40

Ordered Units

1x Fish-class destroyer (11 month á 143ts material necessary per unit)
- DD38B-8 Mackerel laid down in Daressalam on a Type 2 slip in October 39, completed in July 40

Rebuilds/Refits/Repairs

1x DD21-class destroyer (5 month á 68ts material necessary per unit)
- Euarne entering a Type 1 dock in Libreville in December. Leaving the dock in January 40, the destroyer will stay in the yard until April 40

Scrapping

None


Class B Cruisers

Completed Units

5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
2x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
2x Nampula II-class light cruiser (Type 36)
2x Charybdis-class light cruiser (Type 38)

2x Daphne-class anti aircraft cruiser (Type 34)
2x Danae-class anti aircraft cruiser (Type 36)

4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)

1x Lightning-class mine cruiser
1x Hedgehog-class mine cruiser

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Class A Cruisers

Completed Units

2x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
2x Hero-class (Type 33)

2x Radiance-class
1x Vengeance-class

On Trials

None

Ordered Units

1x CA36E-class heavy cruiser (24 month á 624ts material necessary per unit)
- CA36E-2 Revenge laid down in Montevideo on a Type 4 slip in December 38, completed in November 40

1x CA23-class heavy cruiser
- Good Hope running trials until May 40

Repair/Refits

1x CA23-class heavy cruiser (6 month and 526ts of material necessary)
- Good Lopez entering a Type 3 dock in Durban in January. Leaving the dock in March 40, the cruiser will stay in the yard until June 40

Scrapping

None


Capital Units

Completed Units

1x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
2x Monarch-class

On Trials

None

Ordered Units

2x BB37A-III-class battleship (57 month á 838ts material necessary per unit)
- Thunderer laid down in Durban on a Type 4 slip in June 37, completed in February 42
- Superb laid down in Montevideo on a Type 4 slip in September 37, completed in May 42

2x BB37A-IV-class battleship (57 month á 835ts material necessary per unit)
- Implacable laid down in Durban on a Type 4 slip in April 38, completed in December 42
- Indomitable laid down in Port Elizabeth on a Type 4 slip in November 38, completed in July 43

Rebuilds/Refits

1x Mauritius-class battleship (19 month and 762ts of material necessary)
- Reunion entering a Type 3 dock in Buenos Aires in August 39. Leaving the dock in February 40, the battleship will stay in the yard until February 41

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
1x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship

1x LCDS-class
2x LCDS-2-class

On Trials

None

Ordered Units

None

Rebuilds/Refits

None


Carriers

Completed Units

1x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)

2x Anvil-class light fleet carrier (Type 30)
1x Endress-class light fleet carrier (Type 36)

1x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
3x Unicorn-class floatplane carrier

On Trials

None

Ordered Units

1x CV37C-class fleet carrier (36 month á 750ts material necessary per unit)
- Asgard laid down in Buenos Aires on a Type 4 slip in August 37, completed in July 40

1x CV40B-class fleet carrier (33 month á 726ts material necessary per unit)
- Helspanth laid down in Durban on a Type 3 slip in April 40, completed in December 42

2x AV39-class floatplane carrier (1 month á 432ts material necessary per unit)
- Wyvern laid down in Daressalam on a Type 2 slip in December 39, completed in March 41
- Chimera laid down in Montevideo on a Type 2 slip in October 39, completed in January 41

Rebuilds/Refits

None


Class A Submarines

Completed Units

7x F-class submarine
3x J-class submarine
2x L-class submarine
8x M-class submarine

On Trials

1x O-class fleet submarine
- O5 running trials until May 40

Ordered Units

7x O-class fleet submarine (11 month á 107ts material necessary per unit)
- O7 laid down on Prince Eduard Islands on a Type 0 slip in July 39, completed in May 40
- O3 laid down in Majunga on a Type 1 slip in July 39, completed in May 40
- O1 laid down in Port Louis on a Type 0 slip in July 39, completed in May 40
- O6 laid down in Douala on a Type 0 slip in December 39, completed in October 40
- O8 laid down on Prince Eduard Islands on a Type 0 slip in June 40, completed in April 41
- O4 laid down in Majunga on a Type 1 slip in June 40, completed in April 41
- O2 laid down in Port Louis on a Type 1 slip in June 40, completed in April 41

1x Q-class fleet submarine (11 month á 122ts material necessary per unit)
- Q1 laid down on Montevideo on a Type 0 slip in April 40, completed in February 41

Repairs/Rebuilds/Refits

None

Scrapping

3x F-class submarine (4 month total, 1 month in Type 1 dock)
- F3 scrapping in Durban starting in September, finished in December 39 – 120ts received from hull for Q2/1940
- F7 scrapping in Durban starting in Januar, finished in April 40 – 120ts received from hull for Q4/1940
- F8 scrapping in Durban starting in May, finished in August 40 – 120ts received from hull for Q1/1941


Class B Submarines

Completed Units

2x H-class submarine
13x K-class submarine
8x N-class submarine

On Trials

None

Ordered Units

1x P-class coastal mine submarine (5 month á 100ts material necessary per unit)
- P1 laid down in Cape Town on a Type 0 slip in February 40, completed in June 40

Repairs/Rebuilds/Refits

None

Scrapping

1x I-class coastal submarine (4 month total, 1 month in Type 0 dock)
- I9 scrapping in Libreville starting in September, finished in December 39 – 60ts received from hull for Q2/1940

3x H-class coastal submarine (4 month total, 1 month in Type 0 dock)
- H5 scrapping in Mar del Plata starting in September, finished in December 39 – 60ts received from hull for Q2/1940
- H8 scrapping in Mar del Plata starting in January, finished in April 40 – 60ts received from hull for Q4/1940
- H10 scrapping in Mar del Plata starting in May, finished in August 40 – 60ts received from hull for Q1/1941


Landing Vehicles

Completed Units

1x LSC38-class landing ship (ex-AV22)
1x LSC39-class landing ship (ex-TD19)
2x LSA38-class landing ship
2x LST38-class landing ship
6x LSI38-class landing ship

On Trials

2x LSI38-class landing ship
- LSI38-7 running trials until April 40
- LSI38-8 running trials until June 40

2x LST38-class landing ship
- LST38-3 running trials until April 40
- LST38-4 running trials until June 40

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)

1x FV32-class fleet support ship
2x FV36-class fleet support ship

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

1x TD19-class tender (5 month and 52ts of material necessary, refit into landing ship)
- Mossel Bay entering a Type 1 dock in Port Elizabeth in January. Leaving the dock in February 40, the tender will stay in the yard until May 40


--------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

89 ASW launches
67 motor launches
38 motor torpedo boats
52 minesweepers
46 small patrol crafts
6 river gunboat
2 river monitors
95 TB/DD/DLs of less than 2,000ts
45 cruisers category b
10 cruisers category a
13 capital units
7 costal defence ships
6 aircraft carrier
6 floatplane carrier
20 submarines category a
23 submarines category b
12 landing vehicles
18 armed tenders
3 fleet support ship

plus numerous auxiliary vessels of all kind.