German Naval Construction Programme, First Quarter, 1946
A. Factories
Factories: 31
Available: 31
Producing Warship Material: 27
Tonnage Produced: 27,000
Producing Infrastructure (Committed): 4
Producing Infrastructure (Non - Committed):
Infrastructure Points Produced: 0.4
Bonus IP for Committed Factories: 0.0
Total IP Available: 0.4
Tonnage Produced: 27,000
Tonnage Transferred In:
Tonnage Received in Payment: 0
Tonnage Reclaimed From Scrap: 524
Tonnage Previously Stockpiled: 19,669
Total Tonnage Available: 47,193
Tonnage Transferred Out:
Tonnage Paid:
Tonnage Used in Construction: 31,262
Tonnage Remaining for Stockpile: 15,931
B. Infrastructure Development
Infrastructure Project -:- IP Req -:- IP Added -:- IP To Date -:- IP Remain
Expand Wilhelmshaven S1 from Type 1.0 to Type 2.0 -:- 1.0 -:- 0.4 -:- 0.4 -:- 0.6
Expand Hamburg S3 from Type 0.0 to Type 1.0
Expand Hamburg S4 from Type 0.0 to Type 1.0
C. Naval Development and Construction
Bremerhaven
Dock Nr.1 – Type 3.0 – Scrapping of Light Minelayer Heimdal – commences 1 October 1945; enters dock 2 December 1945; Demolition complete 13 January 1946
Slip Nr.1 - Type 3.0 – Air Defence Destroyer Kolberg – Laid down 1 October 1945; requires 3,820 tons; 1,000 tons previously consumed; receives 1,000 tons; 1,820 tons remaining; launched 4 March 1946
Slip Nr.2 – Type 1.0 – Destroyer Waldenburg – Laid down 1 January 1946; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining
Slip Nr.3 – Type 1.0 – Destroyer Glogau – Laid down 1 January 1946; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining
Pierside:
Aircraft carrier Karl der Große – Launched 19 December 1944; requires 18,764 tons; 16,080 tons previously consumed; receives 2,010 tons; 674 tons remaining
Destroyer Burbach – Launched 12 November 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 500 tons remaining
Destroyer Freudenberg – Launched 12 November 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 500 tons remaining
Cuxhaven
Dock Nr.1 - Type 4.0 – Scrapping of Light Minelayers Widder and Thor – commence 1 October 1945; enter dock 2 December 1945; Demolition complete 13 January 1946
Dock Nr.2 - Type 2.0 – Scrapping of Light Minelayer Odin – commences 1 October 1945; enters dock 2 December 1945; Demolition complete 13 January 1946
Slip Nr.1 – Type 4.0 – Air Defence Cruiser Zenta – Laid down 1 January 1946; requires 6,200 tons; 0 tons previously consumed; receives 1,300 tons; 4,900 tons remaining
Slip Nr.2 – Type 2.0 – Air Defence Destroyer Wiesbaden – Laid down 1 October 1945; requires 3,820 tons; 1,000 tons previously consumed; receives 1,000 tons; 1,820 tons remaining; launched 4 March 1946
Slip Nr.3 – Type 1.0 – Destroyer Landeshut – Laid down 1 January 1946; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining
Slip Nr.4 – Type 1.0 – Destroyer Neurode – Laid down 1 January 1946; requires 2,200 tons; 0 tons previously consumed; receives 550 tons; 1,650 tons remaining
Pierside:
Aircraft carrier Friedrich Barbarossa – Launched 19 December 1944; requires 18,764 tons; 16,080 tons previously consumed; receives 2,010 tons; 674 tons remaining
Destroyer Heubach – Launched 12 November 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 500 tons remaining
Destroyer Insterberg – Launched 12 November 1945; requires 2,200 tons; 1,100 tons previously consumed; receives 550 tons; 500 tons remaining
Hamburg
Slip Nr.1 – Type 2.0 – Idle
Slip Nr.2 – Type 2.0 – Idle
Slip Nr.3 – Type 1.0 – Coastal Escort Seelöwe – Laid down 1 January 1946; requires 481 tons, 0 tons previously consumed; receives 241 tons, 240 tons remaining; launched 24 February 1946
Slip Nr.4 – Type 1.0 – Coastal Escort Seeigel – Laid down 1 January 1946; requires 481 tons, 0 tons previously consumed; receives 241 tons, 240 tons remaining; launched 24 February 1946
Pierside
Submarine Walfisch – Launched 8 November 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining
Submarine Neunaugen – Launched 8 November 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining
Kiel
Dock Nr.1 – Type 4.0 – Aircraft Carrier Tegetthoff; Laid down 1 January 1945; requires 28,194 tons, 9,360 tons previously consumed; receives 2,340 tons, 16,464 tons remaining; launched 24 March 1946
Dock Nr.2 – Type 2.5 – Air Defence Cruiser Aspern – Laid down 1 January 1946; requires 6,200 tons; 0 tons previously consumed; receives 1,300 tons; 4,900 tons remaining
Dock Nr.3 – Type 2.0 – Submarine Huchen – Laid down 1 January 1946; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining
Dock Nr.4 – Type 0.0 – Idle
Slip Nr.1 – Type 4.0 – Aircraft Carrier Zeiten; Laid down 1 January 1945; requires 28,194 tons, 9,360 tons previously consumed; receives 2,340 tons, 16,464 tons remaining; launched 24 March 1946
Slip Nr.2 - Type 3.0 – Light Cruiser Regensburg; Laid down 1 July 1945; requires 10,500 tons, 3,020 tons previously consumed; receives 1,510 tons, 6,020 tons remaining; launched 8 March 1946
Slip Nr.3 – Type 2.0 – Idle
Slip Nr.4 – Type 1.0 – Air Defence Frigate Manching – Laid down 1 January 1946; requires 1,970 tons, 0 tons previously consumed; receives 500 tons, 1,470 tons remaining
Slip Nr.5 – Type 1.0 – Air Defence Frigate Birkenfeld – Laid down 1 January 1946; requires 1,970 tons, 0 tons previously consumed; receives 500 tons, 1,470 tons remaining
Pierside
Light Cruiser Stuttgart – Launched 9 March 1945; requires 10,500 tons, 9.060 tons previously consumed; receives 1,490 tons, 0 tons remaining; completed 6 February 1946 and commences trials
Light Cruiser Stettin – Launched 8 September 1945; requires 10,500 tons, 6.040 tons previously consumed; receives 1,510 tons, 3,000 tons remaining
Submarine Lotsenfisch – Launched 8 November 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining
Submarine Makrele – Launched 8 November 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining
Wilhelmshaven
Dock Nr.1 - Type 3.0 – Scrap submarines U-37, U-38 and U-39; commenced 1 January 1946, entered dock 25 January 1946; demolition complete 10 February 1946
Dock Nr.2 – Type 0.0 – Idle
Slip Nr.1 – Type 1.0 – Expanding from Type 1.0 to Type 2.0
Slip Nr.2 – Type 0.5 – Submarine Äsche – Laid down 1 January 1946; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining
Slip Nr.3 – Type 0.5 – Submarine Drachenfisch – Laid down 1 January 1946; requires 1,720 tons, 0 tons previously consumed; receives 440 tons, 1,280 tons remaining
Pierside:
Submarine Brasche – Launched 8 November 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining
Submarine Schellfisch – Launched 8 November 1945; requires 1,720 tons, 880 tons previously consumed; receives 440 tons, 400 tons remaining
Vienna:
Dock Nr.1 – Type 0.0 – Scrapping of River Gunboat Francis I – commences 1 January 1946; enters dock 25 January 1946; Demolition complete 10 February 1946
Dock Nr.1 – Type 0.0 – Scrapping of River Gunboat Maximilian – commences 25 January 1946; enters dock 18 February 1946; Demolition complete 6 March 1946
Dock Nr.1 – Type 0.0 – Scrapping of River Patrol Boat Habordansky – commences 23 February 1946; enters dock 13 March 1946; Demolition complete 25 March 1946
Slip Nr.1 – Type 0.0 – Idle
Memel:
Dock Nr.1 – Type 1.0 – Air Defence Frigate Hollabrun – Laid down 1 January 1946; requires 1,970 tons, 0 tons previously consumed; receives 500 tons, 1,470 tons remaining
Slip Nr.1 – Type 1.0 – Air Defence Frigate Ettenheim – Laid down 1 January 1946; requires 1,970 tons, 0 tons previously consumed; receives 500 tons, 1,470 tons remaining
Slip Nr.2 – Type 0.0 – Harbor Tug Beuchel – Laid down 1 January 1946; requires 325 tons, 0 tons previously consumed; receives 200 tons, 125 tons remaining; launched 24 February 1946
Slip Nr.3 – Type 0.0 – Harbor Tug Poel – Laid down 1 January 1946; requires 325 tons, 0 tons previously consumed; receives 200 tons, 125 tons remaining; launched 24 February 1946
Pierside:
Corvette Drache – Launched 31 October 1945; requires 1,000 tons, 540 tons previously consumed; receives 270 tons, 190 tons remaining
Corvette Kormoran – Launched 31 October 1945; requires 1,000 tons, 540 tons previously consumed; receives 270 tons, 190 tons remaining
Flensburg:
Slip Nr.1 – Type 1.0 – Corvette Kondor – Laid down 1 October 1945; requires 1,000 tons, 270 tons previously consumed; receives 270 tons, 460 tons remaining; launched 31 January 1946
Slip Nr.2 – Type 1.0 – Corvette Falke – Laid down 1 October 1945; requires 1,000 tons, 270 tons previously consumed; receives 270 tons, 460 tons remaining; launched 31 January 1946
Floating Dock Nr.1 – Type 1.0 – Idle
Corvette Bussard – Launched 1 August 1945; requires 1,000 tons, 810 tons previously consumed; receives 190 tons, 0 tons remaining; completed 26 January 1946 and commences trials
Corvette Grief – Launched 1 August 1945; requires 1,000 tons, 810 tons previously consumed; receives 190 tons, 0 tons remaining; completed 26 January 1946 and commences trials
Small Craft Construction Programme
Kieler Bucht class Boom Defence Vessels – three vessels constructed via factories – unit cost 188 tons, total cost 564 tons
Oderhaff class Fire Boats – one vessel constructed via factories – unit cost 186 tons, total cost 186 tons
Refits and Conversion Programme
None
D. Transactions
None
E. Other Notes
Ships Laid Down This Quarter
At Bremerhaven: Destroyer Waldenburg, Destroyer Glogau
At Cuxhaven: Air Defence Cruiser Zenta, Destroyer Landeshut, Destroyer Neurode
At Hamburg: Coastal Escort Seelöwe, Coastal Escort Seeigel
At Kiel: Air Defence Cruiser Aspern, Air Defence Frigate Manching, Air Defence Frigate Birkenfeld, Submarine Huchen
At Wilhelmshaven: Submarine Äsche, Submarine Drachenfisch
At Memel: Air Defence Frigate Hollabrun, Air Defence Frigate Ettenheim, Harbor Tug Beuchel, Harbor Tug Poel
Ships Launched This Quarter
At Bremerhaven: Air Defence Destroyer Kolberg
At Cuxhaven: Air Defence Destroyer Wiesbaden
At Hamburg: Coastal Escort Seelöwe, Coastal Escort Seeigel
At Kiel: Aircraft Carrier Tegetthoff, Aircraft Carrier Zieten, Light Cruiser Regensburg
At Memel: Harbor Tug Beuchel, Harbor Tug Poel
At Flensburg: Corvette Kondor, Corvette Falke
Ships Completed This Quarter
At Kiel: Light Cruiser Stuttgart
At Flensburg: Corvette Bussard, Corvette Grief
Refits/Conversions Completed This Quarter
None
Ships Undergoing Trials This Quarter
Destroyer Allenstein
Destroyer Hirschberg
Destroyer Gumbinnen
Destroyer Schweidnitz
Corvette Albatros
Corvette Mowe
Submarine Haifisch
Submarine Speerfisch
Submarine Store
Submarine Tarpune
Submarine Schwertfisch
Submarine Forellen
Buoy Tender Dänholm
Buoy Tender Mährens
Light Cruiser Stuttgart
Corvette Bussard
Corvette Grief
Ships Completing Trials This Quarter
Light Cruiser Dresden
F. Scrappage Report
Submarine U-37, Submarine U-38, Submarine U-39 – Scrapping commenced 1 January 1946, entered dock 25 January 1946, demolition completed 10 February 1946. 186 tons (3 x 62) recovered in 4Q46
River Gunboat Francis I – Scrapping commenced 1 January 1946; entered dock 25 January 1946, demolition completed 10 February 1946. 60 tons recovered in 4Q46
River Gunboat Maximilian – Scrapping commenced 25 January 1946; entered dock 18 February 1946, demolition completed 6 March 1946. 60 tons recovered in 4Q46
River Patrol Boat Habordansky – Scrapping commenced 23 February 1946; entered dock 13 March 1946, demolition completed 25 March 1946. 28 tons recovered in 4Q46
G. Other Disposals
None
Updated Order of Battle
Type : In Service + Trials + Building + Converting + Refitting = Total
Schlachtschiff : 8 + 0 + 0 + 0 + 0 = 8
Schlachtkreuzer : 4 + 0 + 0 + 0 + 0 = 4
Flugzeugträger : 9 + 0 + 4 + 0 + 0 = 13
Schwere Kreuzer : 4 + 0 + 0 + 0 + 0 = 4
Leichte Kreuzer : 17 + 1 + 2 + 0 + 0 = 20
Flugabwehrkreuzer : 0 + 0 + 2 + 0 + 0 = 2
Flugabwehrzerstörer : 0 + 0 + 2 + 0 + 0 = 2
Zerstörer : 72 + 4 + 8 + 0 + 0 = 84
Flugabwehrfregatten : 0 + 0 + 4 + 0 + 0 = 4
Mehrzweckfregatten : 16 + 0 + 0 + 0 + 0 = 16
Inspektionsschiffen : 2 + 0 + 0 + 0 + 0 = 2
Geleitkorvetten : 24 + 4 + 4 + 0 + 0 = 32
Underseeboote : 31 + 6 + 9 + 0 + 0 = 46
Leichte Minenschiffe : 8 + 0 + 0 + 0 + 0 = 8
Minensuchboote : 32 + 0 + 0 + 0 + 0 = 32
Minenräumboote : 16 + 0 + 0 + 0 + 0 = 16
Patrouillenboot : 0 + 0 + 2 + 0 + 0 = 2
Mehrzweckboot : 4 + 0 + 0 + 0 + 0 = 4
Schnelleboote : 50 + 0 + 0 + 0 + 0 = 50
Fluss-Patrouillenboote : 5 + 0 + 0 + 0 + 0 = 5
Schnellboot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
U-boot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
Flotten-Begleitschiffe : 6 + 0 + 0 + 0 + 0 = 6
Einsatzgruppenversorgungsschiff : 6 + 0 + 0 + 0 + 0 = 6
Flottentanker : 20 + 0 + 0 + 0 + 0 = 20
Flottenversorgungsschiff : 4 + 0 + 0 + 0 + 0 = 4
Werkstattschiffe : 2 + 0 + 0 + 0 + 0 = 2
Vorratsschiffe : 2 + 0 + 0 + 0 + 0 = 2
Munitionstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Versorgnungstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Minentransporter : 1 + 0 + 0 + 0 + 0 = 1
Begleit und Werkstattschiff : 2 + 0 + 0 + 0 + 0 = 2
Reparaturschiff : 2 + 0 + 0 + 0 + 0 = 2
Vermessungsschiff : 2 + 0 + 0 + 0 + 0 = 2
Eisbrecher : 2 + 0 + 0 + 0 + 0 = 2
Tonnenleger : 0 + 2 + 0 + 0 + 0 = 2
Netzleger : 8 + 0 + 0 + 0 + 0 = 8
Leichte Netzleger : 3 + 0 + 0 + 0 + 0 = 3
Hochseeschlepper : 4 + 0 + 0 + 0 + 0 = 4
Bergungsschlepper : 4 + 0 + 0 + 0 + 0 = 4
Hafenschlepper : 4 + 0 + 2 + 0 + 0 = 6
Löschboot : 1 + 0 + 0 + 0 + 0 = 1
Amphibische Transportschiffe : 10 + 0 + 0 + 0 + 0 = 10
Landungstransportschiff : 8 + 0 + 0 + 0 + 0 = 8
Sturm Landungsboot : 148 + 0 + 0 + 0 + 0 = 148
Pionier Landungsboot : 46 + 0 + 0 + 0 + 0 = 46
Marine Fahrprahm Typ 1941 : 8 + 0 + 0 + 0 + 0 = 8
Hafensucheboote Typ 1941 : 24 + 0 + 0 + 0 + 0 = 24
Pionier Motor Launch Typ 1941 : 20 + 0 + 0 + 0 + 0 = 20
Flieger-schuleschiffe : 1 + 0 + 0 + 0 + 0 = 1
Artillerie-schuleschiffe 2 + 0 + 0 + 0 + 0 = 2
Segel-schuleschiffe 2 + 0 + 0 + 0 + 0 = 2
Zielschiffe 1 + 0 + 0 + 0 + 0 = 1
Hafen-schuleschiffe 1 + 0 + 0 + 0 + 0 = 1