Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, October 17th 2006, 1:22pm

Nordmark Q3/1932

A) Industry

18 factories (non fixed) producing 18000tons of ship materials. Plus stockpile of 609tons. Plus scrap revenue of 2824tons
5 factories (fixed) producing 0.5IP for Q3/1932

B) Infrastructure Development

Trondheim New type 0 Dock 1IP needed, 0.5 IP added.

C) Ship Construction

Karlskrona
Type 4 Slip #1: idle
Type 3 Dock #1: Gota Lejon Class BC rebuild, 6000 needed, 2000tons added.
Type 3 Dock #2 CL12-5 scrapping (706tons available for Q4/1932)
Type 3 Slip #1: Training carrier Gärdsmyg, 7800t needed, 800t added.
Type 3 Slip #2: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 0 Dock #1: idle
Type 0 Slip #1: F32-15 Laid down 592t needed, 492t added. Launched.
Type 0 Slip #2: F32-16 Laid down 592t needed, 492t added. Launched.

Free Floating:
Orn Class carrier (Orn) 5000t needed, 2000t added.
Orn Class carrier (Falk) 5000t needed, 2000t added.
DD32-1 Laid down 400t needed, 400t added. Completed.
F32-6 100t needed, 100t added. Completed.
F32-7 100t needed, 100t added. Completed.

Helsingfors Örlovsvarv
Type 3 Slip #1: idle
Type 1 Slip #1: F32-17 Laid down 592t needed, 492t added. Launched.
Type 1 Slip #2: F32-18 Laid down 592t needed, 492t added. Launched.

Free Floating:
DD32-2 Laid down 400t needed, 400t added. Completed.
DD32-3 Laid down 400t needed, 400t added. Completed.
DD32-4 Laid down 400t needed, 400t added. Completed.
F32-8 100t needed, 100t added. Completed.
F32-9 100t needed, 100t added. Completed.

Gustavsvern Naval Base, Trondheim
Type 4 Dock #1: idle
Type 4 Slip #1: idle
Type 3 Dock #1: idle
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 0 Dock #1: idle
Type 0 Slip #1: F32-19 Laid down 592t needed, 492t added. Launched.
Type 0 Slip #2: F32-20 Laid down 592t needed, 492t added. Launched.

Free Floating:
Stockholm Class CA-1 4000t needed, 2000t added.
Stockholm Class CA-1 4000t needed, 2000t added.
DD32-5 Laid down 400t needed, 400t added. Completed.
F32-10 100t needed, 100t added. Completed.

Karljohansvern Naval Base, Horten outside Oslo
Type 3 Slip #1: idle
Type 1 Slip #1: idle

Freefloating:
DD32-6 Laid down 400t needed, 400t added. Completed

Oscarsvern Naval Base, Leivsborg
Type 4 Dock #1: idle
Type 4 Slip #1: idle
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 1 Slip #2: F32-21 Laid down 592t needed, 492t added. Launched.
Type 0 Slip #1: F32-22 Laid down 592t needed, 492t added. Launched.
Type 0 Slip #2: F32-23 Laid down 592t needed, 492t added. Launched.

Free Floating:
DD32-7 Laid down 400t needed, 400t added. Completed.
DD32-8 Laid down 400t needed, 400t added. Completed.
F32-11 100t needed, 100t added. Completed.
F32-12 100t needed, 100t added. Completed.
F32-13 100t needed, 100t added. Completed.

Iceland Naval Station
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 0 Slip #1: F32-24 Laid down 592t needed, 492t added. Launched.

Free Floating:
DD32-9 Laid down 400t needed, 400t added. Completed.
F32-14 100t needed, 100t added. Completed.

Faeroes Naval Station
Type 0 Dock #1: idle

Åland Naval Base
Type 3 Dock #1: idle
Type 1 Dock #1: idle
Type 0 Dock #1: idle

South Georgia Naval Base
Type 0 Dock #1: idle

D) Transactions

E) Other Notes

16 twin 110mm DP gun’s in mounts with hoists for coastal fortifications 663tons needed, 600tons added.

F32 6 to 14 on trials

F) Updated Order of Battle, 1/7/32

Note: X(Y) +Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 2(0)0
BC: 6(1)0
CV: 1(0)2
CA: 2(0)2
CL: 39(0)0
DD: 64(0)9
Torpedo boats: 34(0)0
Subs type (a): 10(0)0
Sloops/Frigates: 23(0)19
CDBB: 5(0)0
Auxiliaries 7(0)1


New stockpile of 613tons

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

2

Tuesday, October 17th 2006, 2:22pm

Is it really necessary to use 110mm mounts for coastal installations? Aren´t there other, more cost effective ways? A DP mounts is a bit more complex than a normal gun installation with a concrete casemate or something...

3

Tuesday, October 17th 2006, 3:34pm

He's probably wanting to be able to use it for both AS and AA purposes, so a concrete casemate won't work very well.

4

Tuesday, October 17th 2006, 3:44pm

I'd assume that the DP guns are only being used in conjunction with larger coastal guns, as AA protection and AS backup. I wouldn't imagine they'd have the range to be useful on their own except in very constricted waters.

5

Tuesday, October 17th 2006, 4:45pm

correct, these are DP's for AA protection, and for blasting small assault craft out of the water