You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, November 3rd 2005, 2:32pm

Germany Q1/1927

German Naval Developments – Q1/27

A. Industrial Allocation

Factory Allocation:

Warship Material: 3
Infrastructure (Committed): 21 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 0

Warship Material Produced: 3,000 t
Stockpile: 1,410 t
Recycled Scrap: 120 t
Material Used on Construction: 3320 t
New Stockpile: 1,090 t

B. Infrastructure Development

The Type 3 drydock at Kiel receives .1 pts, for 2.2 total.
Factory 25 receives 1 point, for 1 total.
Factory 26 receives 1 point, for 1 total.


C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: Scrapping Medusa
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-213 receives 426 t.

At Bremerhaven

1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Scrapping G-142
1 Type 0 slip: Idle
Free-floating: DD Z-212 receives 214 t, completed 15/2/27

At Cuxhaven

1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: CL Ersatz Nymphe receives 1400 t

At Kiel

1 Type 3 slipway: CL Ersatz Thetis receives 1400 t, launched 8/2/27
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle

D. Transactions

DD G-142 scrapped at Bremerhaven, 120 t to be available for Q4/27

E. Other Notes

DD Z-210 complete shake-down cruise

CL Breslau, DD Z-211 continue shake-down cruise

Z-212 commences shake-down cruise

New Orders: None

F. Updated Order of Battle, 31/3/27

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
PD: 3(0)+0
CL: 10(0)+2, with Medusa deleted, to be scrapped Q2/27.
DD: 24(0)+3, with G-142 deleted, to be scrapped Q2/27.
SL: 6(0)+0
AM: 10(0)+0

Note: PD = pre-dreadnought

2

Thursday, November 3rd 2005, 2:41pm

Hmm, looks like a wire crossed somewhere...

Quoted

At Wilhelmshaven

1 Type 2 drydock: Scrapping Niobe


*climbs into VW time machine - jumps back to Q1/27*

Niobe was one of the ships transferred to the Philippines...Niobe and Thetis in Q1/27 and *jumps forwards two quarters* Nymphe and Hamburg in Q3/27.

*attempts to return to present - winds up in 2525 instead.*
^_^

3

Thursday, November 3rd 2005, 2:54pm

Bah, you are correct, for some reason I got the wrong ship! I'll correct.....