You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, October 25th 2005, 11:05am

Atlantis Q1/29

*edited to reflect missing 8 minewarfare vessels build, originally 8 listed in yards, also edited order of battle*

A. Industrial Allocation

17/30 factories (non fixed) to naval materials: 17,000 tons created for Q1/1929 plus 450 tons stockpiled from Q4/28 plus 3,875 tons transfered from Chile in Q1/1929 for 21,325 total tons.

21,325 tons used for ship building(17,450 for local builds, 3,875 for foriegn builds), 0 tons stockpiled for next quarter.

10/30 factories (fixed) to infrastructure development: 1.0 points for Q1/1929
3/30 factorys (non-fixed) to infrastructure development: 0.3 points for Q1/1929


Total: 1.3 infrastructure points created for Q1/28

B. Infrastructure Development

New factory #3, 10 points needed, 4.2 points used, 0.9 points added
0.4 points added to 2 type 0 slips at Duecalion


C. Naval Construction

At Cleito Type 4 port (7/9)

Class 4 Slip #1 - Battleship Memnon laid down, 38,537 tons needed, 3000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - MS-26 laid down, 647 tons needed, 200 tons added
Class 0 Slip #2 - MS-27 laid down, 647 tons needed, 200 tons added
Class 0 Slip #3 - MS-28 laid down, 647 tons needed, 200 tons added
Class 0 Slip #4 - MS-29 laid down, 647 tons needed, 200 tons added

6x15 ton CPB type 1 class


At Eridanus Type 4 port (8/9)

Class 4 Slip #1 - Battleship Philomedes laid down, 38,537 tons needed, 3000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - Chilean Light Cruiser #3 building, 4,160 tons used, converting to carrier, 2,045 tons added
Class 2 Drydock #1 - Tanker Lamia converting to airship tender, 5,078 tons needed , 4,578 tons used, 500 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle


At Duecalion type 3 port (6/7)

Class 3 Slip #1 - CL Cerasus building, 7,745 tons needed, 4,000 tons used, 1,000 tons added
Class 3 Slip #2 - CA Apollo laid down, 10,839 tons needed, 1,500 tons used, 1,339 added
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - completed
Class 2 Drydock #1 - Tanker Tronagarru converting to airship tender, 5,078 tons needed , 4,578 tons used, 500 tons added
Class 0 slip #1 - under construction, 0.5 points needed , 0.3 points used, 0.2 points added
Class 0 slip #2 - under construction, 0.5 points needed , 0.3 points used, 0.2 points added


AC Cape Verde moved from drydock freefloating


At Illissus type 3 port (7/7)

Class 3 Slip #1 - CL Ithica building, 7,745 tons needed, 4,000 tons used, 1,000 tons added
Class 3 Slip #2 - CA Hector laid down, 10,839 tons needed, 1,500 tons used, 1,339 added
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - MS-30 laid down, 647 tons needed, 200 tons added
Class 0 Slip #2 - MS-31 laid down, 647 tons needed, 200 tons added
Class 0 Slip #3 - MS-32 laid down, 647 tons needed, 200 tons added
Class 0 Slip #4 - MS-33 laid down, 647 tons needed, 200 tons added

6x15 ton CPB type 1 class


At Phelleus type 5 port (9/11)

Class 3 Slip #1 - CL Orestes building, 7,745 tons needed, 4,000 tons used, 1,000 tons added
Class 3 Slip #2 - CL Atreus building, 7,745 tons needed, 4,000 tons used, 1,000 tons added
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - MS-34 laid down, 647 tons needed, 200 tons added
Class 0 Slip #2 - MS-35 laid down, 647 tons needed, 200 tons added
Class 0 Slip #3 - MS-36 laid down, 647 tons needed, 200 tons added
Class 0 Slip #4 - MS-37 laid down, 647 tons needed, 200 tons added


AC Venezuela moved from drydock freefloating

At Lycabettus type 4 port (8/9)

Class 2 Slip #1 - Chilean CA Nevado Ojos del Salado building, 9,859 tons needed, 3,660 tons used. 1,830 tons added
Class 2 Slip #2 - Polar exploration ship Adventure building, 16,393 tons needed, 3,912 tons used, 1,002 tons added
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - Idle

6x15 ton CPB type 1 class



At Maracaibo type 3 port (5/7)

Class 3 Drydock #1 - Idle
Class 1 Slip #1 - MS-38 laid down, 647 tons needed, 200 tons added
Class 1 Slip #2 - MS-39 laid down, 647 tons needed, 200 tons added
Class 1 Slip #3 - MS-40 laid down, 647 tons needed, 200 tons added
Class 1 Slip #4 - MS-41 laid down, 647 tons needed, 200 tons added
Class 0 Slip #1 - 2 MTB's building (batch 1)
Class 0 Slip #2 - 2 MTB's building (batch 1)
Class 0 Slip #3 - 2 MTB's building (batch 1)
Class 0 Slip #4 - Idle

6x15 ton CPB type 1 class


At Safi type 2 port (4/5)

Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 -Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - 2 MTB's building (batch 2)
Class 0 Slip #3 - 2 MTB's building (batch 2)
Class 0 Slip #4 - 2 MTB's building (batch 2)

6x15 ton CPB type 1 class


Launched ships/freefloating ships being completed:

16xH class destroyer leaders completed, begin trials

CV Alioth completed, on trials

AC Venezuela converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted , moored at Phelleus
AC Cape Verde converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted , moored at Duecalion


Ships completed and on trials

CV Alioth on trials
16xH class destroyer leaders begin trials
Blimp Tenders Upsurge and Uprising on trials
Transports Scythia, Nineveh, Gadir and Tanais completed trials



Summary of ship building/repairs/rebuilds and convertions.

2 memnon class battleships laid down
AC's Cape Verde and Venezuela converting to training ships, work suspended.
2xHector class CA building
4x Cerasus class CL's building
CL-6 Atacama building for Chile
CL #3 (CV-1) building for Chile
2 Sea Lark class Tankers converting to Airship Tenders
Polar exploration ship Adventure building
16xMS-26 class Mine warfare vessels laid down
30 type 1 CMB's built
12 MTB-1 class Motor torpedo boats constructed



D. Transactions

Deal with Chile for a trio of "light cruisers" with the potential for a pair of "heavy cruisers" based on the same hull. One payment of 1,830 tons and one payment of 957 tons of material transfered to Atlantis for the building of "light cruisers" CL-6 Atacama and CL-7. Second ship of this class building in Chile.

E. Other Notes

AC's Cape Verde and Venezuela converting to gunnery training ships, conversions suspended



F. Updated Order of Battle, 1/1/28

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 9(0)2
BC: 2(0)0
CV: 4(0)0
CA: 12(0)2
CAE:0(0)0
CL: 51(0)4
DD: 130(0)0
Training ships: 1(0)0
Torpedo boats: N/A
Sloops: N/A
Frigates: N/A
Moniters:2(0)0
Torpedo gunboats: 32(0)0
Gunboats: 12(0)0
Patrol vessels: 50(0)0
Mine sweepers: 24 (0) 0
Mine warfare vessels:0(0)16
Sub chasers: 312(0)0
Coastal Motor Torpedo Boats: 30(0)30
Motor Torpedo Boats: 0(0)12
Fleet Submarine: 20(0)0
Coastal Submarine: 72(0)0
Floatplane carrier/tenders: 2(0)0
Airship tenders: 2(0)0
Blimp carrier/tenders: 2(0)0
Destroyer depot ships: 2(0)0
Submarine depot ships: 4(0)0
Repair ships 2(0)0
Transports: 6(4)0
Landing Craft Infantry 80(0)0
Infantry launches 38(0)0