German Naval Developments - Q1/24
A. Industrial Allocation
5/11 factories produce 5000 t of warship materials, with a stockpile of 487 t for a total of 5,487 t. Of this, 5,128 t is used for construction programs. A stockpile of 359 t is carried over.
6/11 factories are committed to manufacturing naval infrastructure materials, producing 0.6 pts.
B. Infrastructure Development
Factory 12 receives 0.6 pts, for a total of 5.6 pts.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: AM
R-7 laid down 1/1/24, receives 319 t
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Patrol Boat
VP-6 receives 319 t
At Bremerhaven
1 Type 2 slip: DD
Z-203 laid down 1/1/24, receives 426 t
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: CL
Konigsburg receives 1383 t
At Cuxhaven
1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip:
1 Type 1 slip: AM
R-5 receives 319 t, launched 31/1/24
1 Type 0 slip: Idle
Free-floating: CL
Karlsruhe receives 1383 t.
Free-floating: AM
R-3 receives 105 t, completing 31/1/24.
At Kiel
1 Type 2 slipway:1 Type 2 drydock: Idle
1 Type 1 slips: AM
R-6 receives 319 t, launched 31/1/24
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: AM
R-4 receives 105 t, completes 31/1/24
Commercial shipyard at Kiel builds three 150 t coastal submarine chaser.
D. Transactions
None
E. Other Notes
Patrol boat
VP-5 continues shake-down cruise.
Minesweepers
R-3 and
R-4 commence shake-down cruises.
New Orders: 1 destroyer, 1 minesweeper
F. Updated Order of Battle, 31/1/24
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 10()+2
DD: 24(0)+1
SL: 5(0)+1
AM: 4(0)+3
Note: PD = pre-dreadnought