You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, October 11th 2004, 2:21am

Denmark, Quarter 4, 1924

Danish Naval Developments Q4 1924

a/ Industrial Allocation
6/10 factories producing materiel for shipbuilding =6000 tons
2/10 factories (fixed) producing infrastructure materiel =0.2+0.2 bonus points
2/10 factories producing infrastructure materiel = 0.2 points

b/ Infrastructure Development
Factory no. 11 continuing construction, receives 0.6 points = Total 1.3 points

c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Freya, CA, laid down 02/01/24, receives 1768 tons, balance 5833 tons
No.2 type 2 slip – Lolland, CL, laid down 02/04/24, receives 1334 tons, balance 3202 tons
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.1 type 2 drydock - Idle
Dock side –
Bog, SL, laid down 03/01/24, receives 82 tons to complete


Aarhus-
No.1 type 3 slip –Idle
No.2 type 2 slip –Idle
No.3 type 1 slip – UD 1, Sub, laid down 02/04/24, receives 302 tons, balance 326 tons
No.4 type 1 slip – UD 2, Sub, laid down 02/04/24, receives 302 tons, balance 326 tons
No.1 type 3 drydock – Copenhagen, PD, finishes breaking 05/10/24
No.2 type 2 drydock – Idle
Dock side –
Hel, CA, laid down 02/01/23, receives 529 tons to complete

Aalborg-
No.1 type 1 slip – Idle
No.2 type 1 slip – Idle
No.3 type 0 slip - Idle
No.4 type 0 slip - Idle
Dock side –
Ask, SL, laid down 03/01/24, receives 82 tons to complete
Asp, SL, laid down 03/01/24, receives 82 tons to complete

Bangkok-
No.1 type 1 slip –Puma, DD, laid down 02/01/24, receives 336 tons to complete
No.2 type 0 slip – idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side –
Moskito, MWS, laid down 01/10/23, receives 234 tons, balance 58 tons
Gronaa, GB, laid down 02/04/24, receives 69 tons to complete
Vidaa, GB, laid down 02/04/24, receives 69 tons to complete

d/ Transactions
None

e/ Other Notes
All new orders CANCELLED, current projects allowed to complete.

Copenhagen completes breaking on 05/10/24

KDM Mon commissions on 11/11/24
KDM Hel commences sea trials 20/10/24
KDM Moskito continues sea trials until 15/01/25
KDM Arnaa commissions on 04/11/24
KDM Sonderaa commissions on 04/11/24
KDM Gronaa commissions on 04/11/24

Repairs to the following ships:-
Vaerge – 544 tons, starts repairs 15/10/24, re-enters service 01/12/1924
Bellona – 36 tons, starts repairs 01/10/24, re-enters service 02/11/1924
STC’s – 9 tons, start repairs 01/10/24, re-enter service 16/10/1924
D10 – 390 tons, starts repairs 01/10/24
D11 – 468 tons, starts repairs 01/10/24

Re-Fits to the following ships:-
D13 – 390 tons, starts re-fit 01/10/24

Tonnage Carried Over From This Quarter = 62

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order (breaking)

PD = 01 (0) + 0/0 (1)
AC = 02 (0) + 0/0 (0)
CDS = 03 (0) + 0/0 (0)
CA = 00 (0) + 2/0 (0)
CL = 11 (1) + 1/0 (0)
DD = 19 (2) + 1/0 (0)
FR = 02 (0) + 0/0 (0)
SL = 00 (0) + 3/0 (0)
GB = 00 (0) + 4/0 (0)
TB = 20 (0) + 0/0 (0)
STC = 48 (12) + 0/0 (0)
SUB = 11 (1) + 2/0 (0)
MWS = 06 (0) + 1/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: PD = Pre-Dreadnought
FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)