You are not logged in.

1

Sunday, August 27th 2017, 5:16pm

Belgium Q2/1948 Report

Kingdom of Belgium Q2/1948 Report

A. Industrial Output


5.5 Factories:
Fixed IP: 2
Flexible IP: 0
Ship Tonnage: 3.5

B. Transfers and Acquisitions
500 tons from the Netherlands for destroyer purchases

C. Unit Relocations
PC-5 Rochefort and PC-6 Nieuwpoort complete and commissioned with 1st Escort Squadron at Zeebrugge on 29 June
MS-6 Merksem completes and commissions with 2nd Mine Warfare Squadron at Ostend on 20 May
MT-1 and MT-2 complete and commission with 1st Motor Torpedo Squadron at Zeebrugge on 16 June

D. Navy Programme

Resources Allocated: 3,500 tons
Previous Surplus: 7,255 tons
Unused Scrap: 0 tons
Construction Requirements (See Appendix A): 3,587.5 tons
Total surplus: 7,667.5 tons
Scrap Available: 0 tons

E. Infrastructure Programme

Resources Allocated: 0.1 IP
Previous Surplus: 0 IP
Resources Used: 0.1 IP
Carry-over: 0 IP
Infrastructure Development:
0.1 IP to Belgian factory totalling 6.6 IP
0.1 IP to Type 1 Floating Dock under construction at Zeebrugge totalling 1.3 IP

F. Summary Order of Battle at End of Quarter

Note: X (Y) +Z = completed/in service (under repair/refit/rebuild) + under construction.

Heavy Cruisers: 1 + 0
Light Cruisers: 2 + 1
Destroyers: 9 + 0
Sloops: 2 + 0
Escorts: 6 + 0
Minesweepers: 10 + 0
MTB: 48 + 0
Riverine Patrol Boats: 24 + 0
Training Ships: 3 + 0
Tankers: 2 + 0
Destroyer Depot Ships: 2 + 0
Fleet Replenishment Ships: 1 + 0
Tugs: 2 + 0

G. Miscellaneous Works
DT-1 Groenendael, 25% refit in harbour to refurbish internal fittings, cost 2,443.5 tons taking 5 months, 1,222.5 tons this quarter for 2,443.5 tons, completed this quarter

APPENDIX A: DETAILED SHIPBUILDING REPORT

Zeebrugge:
S-1a:

S-1b:
Rochefort Spa Class Escort
Laid Down: 1 October 1947
Launched: 1 January 1948
481 tons this quarter for 1,203 tons
Completed 1 June 1948

D-1a:

1 Type 1 Floating Dock, under construction, see section E

Beiliard, Ostend:
S-0a:

S-0b:

D-0a:

Cockerill, Antwerp:
S-3a:

S-1a:
Nieuwpoort Spa Class Escort
Laid Down: 1 October 1947
Launched: 1 January 1948
481 tons this quarter for 1,203 tons
Completed 1 June 1948

S-0a:

D-3a:
Queen Julianna Training Cruiser
Laid Down: 1 January 1948
Launched: 1 June 1948
1,141 tons this quarter for 2,282 tons
Completion due: 15 March 1949

D-2a:

D-1a:

Small Craft
Merksem, Herstal Class Minesweeper, 150 tons
2x M48 Class MTB, 56 tons each, 112 tons total