*subject to editing for corrections*
A. Industrial Allocation
6/6 factories (non-fixed) to naval materials: 6,000 tons created for Q1/1944 plus 0 tons stockpiled from Q4/43 = 6,000 tons
5,224 tons used, 776 tons stockpiled for next quarter
0/6 factories (non-fixed) to infrastructure development: 0.0 points for Q1/1944
Total 0.0 points created for Q3/43
B. Infrastructure Development
None
C. Naval Construction
Istambul
Type 1 slip #1 - DD Yar Hizar building, 1,997 tons needed, 500 tons used, 0 tons added
Type 1 slip #2 - DD Timur Hizar building, 1,997 tons needed, 500 tons used, 0 tons added
Type 1 slip #3 - DD Demir Hizar building, 1,997 tons needed, 500 tons used, 0 tons added
Type 1 slip #4 - DD Sultan Hizar building, 1,997 tons needed, 500 tons used, 0 tons added
Type 0 slip #1 - Idle
Type 0 slip #2 - Idle
Type 0 drydock #1 - Idle
Izmit
Type 3 drydock #1 - CL Bursa building, 7,576 tons needed, 1,076 tons used, 500 tons added
Type 2 slip #1- CA Aidan Reis launched, 9,547 tons needed, 5,547 tons used, 1,000 tons added
Type 1 drydock #1 - Idle
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 0 slip #1 - Idle
Type 0 slip #2 - Idle
Type 0 slip #3 - Idle
Type 0 slip #4 - Idle
DDL Giaret-I-Vatanic freefloating, 2,848 tons needed, 2,136 tons used, 712 tons added
Samsun
Type 3 drydock #1 - CL Adana building, 7,576 tons needed, 1,076 tons used, 500 tons added
Type 1 drydock #1 - Idle
Type 0 drydock #2 - Idle
DDL Berk-Efsan freefloating, 2,848 tons needed, 2,136 tons used, 712 tons added
Icel
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 3 drydock #1 - Issa Reis building, 13,303 tons needed, 1,800 tons used, 1,800 tons added
Type 0 slip #1 - Idle
Type 0 slip #2 - Idle
Type 0 slip #3 - Idle
Type 0 slip #4 - Idle
Type 0 drydock #1 - Idle
Trabzon
Type 1 drydock #1 - Idle
Launched ships being completed:
None
Ships completed/transfered and on trials
Kemal Ries on trials
Summary of ship building/repairs/rebuilds and convertions.
CA Aidan Reis building (1,000 tons)
CA Issa Reis building, (1,800 tons)
2xVan CL's laid down, (1,000 tons)
2xSeljuk DDL's building (1,424 tons)
4xYar Hizar DD's building (0 tons) work delayed due to lack of materials
D. Transactions
None
E. Other Notes
None
F. Updated Order of Battle, 1/3/44
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB:..................................4(0)0
BC:..................................0(0)0
PD:..................................0(0)0
CV:...................................2(0)0
AC:..................................0(0)0
CA:..................................5(0)1
PC:..................................2(0)0
CL:...................................8(0)2
DDL:................................10(0)2
DD:..................................18(0)4
Torpedo boats:..................28(0)0
Sloops:.............................0(0)0
Frigates:...........................6(0)0
Moniters:..........................0(0)0
Torpedo gunboats:.............0(0)0
Gunboats:.........................0(0)0
Patrol vessels:...................24(0)0
MTB's:.............................40(0)0
Mine sweepers:.................21(0)0
Minelayers:.......................0(0)0
Mine warfare ships:............5(0)0
Sub chasers:.....................36(0)0
Motor Launches:................30(0)0
Motor Launche/minlayers:..10(0)0
Fleet Submarine:...............0(0)0
Coastal Submarine:...........15(0)0
Floatplane carrier/tenders:..0(0)0
destroyer depot ships:........2(0)0
Submarine depot ships:......0(0)0
Auxillary's:.........................N/A
G. Ships in reserve status, 1/3/44
PD:...................................1
AC...................................1
DDL..................................2
Torpedo boats:..................7
Sloops:..............................1
Mine sweepers:..................2
Auxillary's:........................N/A