Danish Naval Developments Q4 1940
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts + 0.2 bonus pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
None
c/ Naval Construction
Copenhagen-
No.1 type 3 slip –
No.2 type 2 slip – Ue 49, Ue 50, SUB, laid down 01/10/1940, receives 244 tons each, balance 109 tons each
No.3 type 1 slip – Ue 51, Ue 52, SUB, laid down 01/10/1940, receives 244 tons each, balance 109 tons each
No.4 type 1 slip – Ue 53, Ue 54, SUB, laid down 01/10/1940, receives 244 tons each, balance 109 tons each
No.1 type 3 drydock – Idle
Dock side - Idle
Aarhus-
No.1 type 3.5 slip – Aegir, BB, laid down 21/03/1939, receives 2464 tons, balance 21,616 tons
No.2 type 2 slip – Idle
No.3 type 1 slip – Calluna, SL, laid down 02/06/1940, receives 496 tons, balance 291 tons
No.4 type 1 slip – Dracaena, SL, laid down 02/06/1940, receives 496 tons, balance 291 tons
No.1 type 3.5 drydock – Idle
No.2 type 2 drydock – Idle
Dock side – Thor, BB, laid down 01/07/1939, receives 2464 tons, balance 6832 tons
Dock side – Artemisia, SL, laid down 20/01/1940, receives 291 tons to complete
Dock side – Buxus, SL, laid down 20/01/1940, receives 291 tons to complete
Aalborg-
No.1 type 1 slip – Uf 7, SUB, laid down 15/07/1940, receives 250 tons, balance 405 tons
No.2 type 1 slip – Uf 8, SUB, laid down 15/07/1940, receives 250 tons, balance 405 tons
No.3 type 1 slip – Uf 9, SUB, laid down 15/07/1940, receives 250 tons, balance 405 tons
No.4 type 1 slip – Uf 10, SUB, laid down 15/07/1940, receives 250 tons, balance 405 tons
No.5 type 1 slip – Uf 11, SUB, laid down 15/07/1940, receives 250 tons, balance 405 tons
No.6 type 1 slip - Uf 12, SUB, laid down 15/07/1940, receives 250 tons, balance 405 tons
Dock side – Idle
Roskilde-
Wood yard- LTC 13, LTC, laid down 01/10/1940, receives 100 tons to complete
Wood yard- LTC 14, LTC, laid down 01/10/1940, receives 100 tons to complete
Wood yard- LTC 15, LTC, laid down 01/10/1940, receives 100 tons to complete
Wood yard- LTC 16, LTC, laid down 01/10/1940, receives 100 tons to complete
Phuket-
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
Berbera-
No.1 type 1 drydock – Idle
St. Thomas-
No.1 type 1 drydock – Idle
Guinea Bisseau-
No.1 type 1 drydock – Idle
d/ Transactions
0.4 IP points to Siam (edited)
e/ Other Notes
Ue 43 commissions on 07/12/1940
Ue 44 commissions on 07/12/1940
Ue 45 commissions on 07/12/1940
Ue 46 commissions on 07/12/1940
Ue 47 commissions on 07/12/1940
Ue 48 commissions on 07/12/1940
Uf 1 commissions on 18/12/1940
Uf 2 commissions on 18/12/1940
Uf 3 commissions on 18/12/1940
Uf 4 commissions on 18/12/1940
Uf 5 commissions on 18/12/1940
Uf 6 commissions on 18/12/1940
LTC 13 commissions on 31/12/1940
LTC 14 commissions on 31/12/1940
LTC 15 commissions on 31/12/1940
LTC 16 commissions on 31/12/1940
KDM Artemisia commences sea trials on 20/11/1940
KDM Buxus commences sea trials on 20/11/1940
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 1314 tons
f/ Order of Battle
Note: X (Y) +Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 2/0 (0)
CDS = 04 (0) + 0/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 02 (0) + 0/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 62 (0) + 0/0 (0)
SL = 16 (0) + 4/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 00 (0) + 0/0 (0)
CGC = 48 (0) + 0/0 (0)
STC = 36 (0) + 0/0 (0)
MTC = 100 (0) + 0/0 (0)
LTC = 16 (0) + 0/0 (0)
SUB = 63 (0) + 12/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
SRV = 03 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat/Escort
CGC = Coast Guard Cutter/Patrol Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
LTC = Large Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
SRV = Submarine Recovery Vessel
This post has been edited 1 times, last edit by "Commodore Green" (Feb 9th 2011, 11:28pm)