You are not logged in.

1

Wednesday, November 16th 2005, 2:42pm

Poland Q1,1929

Poland Q1,1929

A. Industrial Allocation

Factory Allocation:

Warship Material:
Infrastructure (Committed): 1
Infrastructure (Non-committed): 0

Warship Material Produced: 3000 t
Stockpile: 0 t
Recycled Scrap: 0 t
Material Used on Construction: 518 t
New Stockpile: 2482 t

B. Infrastructure Development

0.1 pts, for bilding factory 5

C. Naval Construction

at Danzig:
1 Type 2 slip Idle
2 Type 1 slips Idle
2 Type 0 slips each bilding one Minesweepers Czajka class 128t used each
1 Type 1 drydock Idle
at Koszalin
1 Type 1 slip Idle
2 Type 0 slips each bilding one Minesweeper Czajka class128t used each
1 Type 2 drydock idle
2 Type 0 drydocks idle

4 Czajka class Minesweepers in producion

2

Wednesday, November 16th 2005, 2:48pm

You might add how many tons are being used for each ship to the slip lines, and for the Gdansk yards where there are 2 type 1 slips it would be easier to read if those lines were separate for right now while they're working on something.

3

Wednesday, November 16th 2005, 3:11pm

Edited
now I think it easer to read

My 4 czajka class that im bilding are under 200t light.So am i wright that they are operational with in 2 moungts, or am i reading the rules wrong?