You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, March 14th 2012, 2:46pm

Chile, Q1/1942



[SIZE=3]Industrial Allocation[/SIZE]
- 9/9 factories producing 9,000t materials.
- 1,954t from stockpile.
- 5,686 tons from transactions
- 0 tons from scrapping
- 16,640t materials total.
- 12,254t used.
- 4,386t stored for Q2/42.
- 0/9 factories dedicated to infrastructure.

[SIZE=3]Infrastructure Development[/SIZE]
None at present

[SIZE=3]Naval Construction[/SIZE]
ASMAR - Astillero de Talcahuano (Talcahuano):
D3.5: Floatplane tender Michimalonco scrapping. 4.4 months to scrap. 411 tons recovered Q1/42 for total of 411/603 tons recovered. 192 tons remaining. Floatplane tender Capitan Litton scrapping. 4.4 months to scrap. 411 tons recovered Q1/42 for total of 411/603 tons recovered. 192 tons remaining.
S3.5: BC-11 O'Higgins laid down August 1st, 1941. 2,300 tons added Q1/42 for a total of 6,200/28,385 tons. 22,185/28,385 tons remaining until completion on April 3rd, 1944.
D2.5: CLD-19 Casma (Battle-class destroyer leader) laid down October 1st, 1941. 900 tons added Q1/42 for a total of 1,800/3,575 tons. 1,775/3,575 tons remaining. Ship launched on March 1st 1942. Will complete on November 18th, 1942.
D2: DD-58 Caballeroso undergoing partial reconstruction. 350 tons added Q1/1942 for a total of 350/350 tons. 0/350 tons remaining until completion. Reconstruction completed.
S2: CLD-20 Papudo (Battle-class destroyer leader) laid down January 1st, 1942. 900 tons added Q1/42 for a total of 900/3,575 tons. 2,675/3,575 tons remaining. Ship will launch on June 1st 1942 and complete on January 18th, 1943.
S1: Idle
D0: Idle

Dockside:
- BC-09 Almirante Blanco Encalada laid down January 1st, 1940. 3,000 tons added Q1/42 for a total of 21,500/28,385 tons. 6,885/28,385 tons remaining until completion on April 3rd, 1944. Launched June 19th, 1941.
- CLD-18 Punta Gruesa (Battle-class destroyer leader) laid down July 1st, 1941. 900 tons added Q1/42 for a total of 2,700/3,575 tons. 875/3,575 tons remaining. Ship launched on December 1st 1941. Will complete on July 18th, 1942.

ASMAR - Astillero de Valparaíso (Valparaiso):
S1: Idle.
S1: Idle.
D1: DD-48 Valeroso undergoing partial reconstruction. 344 tons added Q1/1942 for a total of 344/344 tons. 0/344 tons remaining until completion. Reconstruction completed.

Dockside:
- LSI(M)-02 Presidente Errazuriz laid down July 1st, 1941. 550 tons added Q1/42 for total of 1650/2650; 550/2650 tons remaining until completion on May 15th, 1942. Ship will launched on December 21st, 1941.

ASENAV/Astillero de Alberto Daiber y Cia (Valdivia):
S0: Light minesweeper YDM-1 laid down January 1st, 1942. 190 tons added Q1/42 for total of 190/190. Completed and launched on January 31st, 1942.
S0: Landing ship Elicura laid down January 1st, 1942. 150 tons added Q1/42 for total of 150/487; 337/487 tons remaining until completion on September 15th, 1942. Ship will launch on April 24th, 1942.

Dockside:
- YTB-08 Lago Jeinimeni laid down April 1st, 1941. 100 tons added Q1/42 for a total of 1000/1000 tons. Completed on January 18th, 1942.

ASMAR - Astillerode Magallanes (Punta Arenas):
D0: Idle

Dockside:
None

from factories:
- N/A

On Trials
- BC Capitan Prat finishes three months of post-reconstruction trials.
- CL Magellanes finishes six months of builders trials.
- CLD Angamos finishes six months of builders trials.
- CLD Iquique continues six months of builders trials.
- LSI(M) Ministro Zentento continues six months of builders trials.
- LST Chacabuco continues six months of builders trials.
- YTB Valle de la Luna continues six months of builders trials.
- YTB Lago Jeinimeni begins six months of builders trials.

Scrapping
- Total tonnage in recycling until Q4/1942: (2x411) = 822 tons
- Total tonnage in recycling until Q1/1943: (2x192) = 384

[SIZE=3]Transactions[/SIZE]
- 570 tons to Great Britain for three Star class Sea Gunboats.
- 1850 tons to the Philippines for Antarctic ship Pacifica.
- 5686 tons from Colombia for the General O'Higgins.

[SIZE=3]Other Notes[/SIZE]
Technology development and investigatory committees are working on the following projects:
- "Zorro": Target date not set. Project is in study stages at Sisdef.
- "Coati": Target date of mid-1944 set. Project is in initial study stages at Sisdef.
- "Pudu": Project is in production at Sisdef and FAMAE.
- Design N1.

[SIZE=3]Order of Battle (Armada de Chile) March 31st, 1942[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Dreadnought Battleships:............2(0)+0
Dreadnought Battlecruisers:........1(0)+2
Coast Defense Ships:.................0(0)+0
Aircraft Carriers:........................3(0)+0
Heavy Cruiser:...........................1(0)+0
Light Cruisers:...........................8(0)+0
Floatplane Cruisers:...................1(0)+0
Destroyer Leaders:.....................2(0)+3 {3,000 tons std and up}
Destroyers:...............................34(0)+0 {1,200-3,000 tons std}
Destroyer Escorts:.....................16(0)+0
Light Destroyers:.......................8(0)+0 {under 1,200 tons std}
Torpedo Boats:.........................4(0)+0
Submarines:.............................10(0)+0
Floatplane Carriers:...................2(0)+0
Subchasers:.............................24(0)+0
Minesweepers:.........................17(0)+0
Arctic Patrol Vessel:..................3(0)+0

Fleet Train:
Destroyer Tenders:...................4(0)+0
Subchaser Tenders:..................2(0)+0
Submarine Tenders:..................1(0)+0
General Fleet Tenders:..............4(0)+0
Fleet Oilers:.............................12(0)+0
Colliers:...................................1(0)+0

Auxiliaries:
Sail Training Sloop:....................2(0)+0
Attack Transports:......................4(0)+0
Transports:................................2(0)+0
Fleet Tugs:................................4(0)+0
Light Harbour Tugs:....................4(0)+0
Netlayers:.................................2(0)+0
Oceanic Research Ship:...............1(0)+0
Pilot Boats:................................6(0)+0
Training Yawls:..........................6(0)+0

Amphibious Forces:
Landing Ship Vehicle:..................1(0)+0
Beach Discharge Lighter:.............1(0)+0
Attack Transports:......................4(0)+0
Landing Ship Infantry (Med):.......1(0)+1
Landing Ship Tank:.....................2(0)+0
Landing Ship Mechanized:..........0(0)+1
Landing Craft Tank:....................0(0)+0
Landing Craft Mechanized:..........11(0)+0
Landing Craft Assault:.................54(0)+0

Emergency Use:
Patrol Boats:.............................4(0)+0
Naval Trawlers:.........................16(0)+0
Transports:...............................2(0)+0
Museum Ships:.........................1(0)+0

Foreign Orders and Exports (Totals):
Fleet Tugs:...............................6(0)+0 (to China)
Light Harbour Tugs:..................20(0)+0 (to China)

[SIZE=3]Summary[/SIZE]
All construction programs continue according to the prophecy.