Danish Naval Developments Q1 1941
a/ Industrial Allocation
11/11 factories producing materiel for shipbuilding = 11000 tons
0/11 factories (fixed) producing infrastructure materiel =0.0 points
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
None
c/ Naval Construction
Copenhagen-
No.1 type 3 slip –
No.2 type 2 slip – Ue 55, Ue 56, SUB, laid down 01/03/1941, receives 244 tons each, balance 109 tons each
No.3 type 1 slip – Ue 57, Ue 58, SUB, laid down 01/03/1941, receives 244 tons each, balance 109 tons each
No.4 type 1 slip – Ue 59, Ue 60, SUB, laid down 01/03/1941, receives 244 tons each, balance 109 tons each
No.1 type 3 drydock – Idle
Dock side - Ue 49, Ue 50, SUB, laid down 01/10/1940, receives 109 tons to complete
Dock side - Ue 51, Ue 52, SUB, laid down 01/10/1940, receives 109 tons to complete
Dock side - Ue 53, Ue 54, SUB, laid down 01/10/1940, receives 109 tons to complete
Aarhus-
No.1 type 3.5 slip – Aegir, BB, laid down 21/03/1939, receives 2464 tons, balance 19,152 tons
No.2 type 2 slip – Idle
No.3 type 1 slip – Empetrum, SL, laid down 02/01/1941, receives 496 tons, balance 1,283 tons
No.4 type 1 slip – Fuchsia, SL, laid down 02/06/1941, receives 496 tons, balance 1,283 tons
No.1 type 3.5 drydock – Falster, CL
No.2 type 2 drydock – Bornholm, CL
Dock side – Thor, BB, laid down 01/07/1939, receives 2464 tons, balance 4368 tons
Dock side – Calluna, SL, laid down 02/06/1940, receives 291 tons to complete
Dock side – Dracaena, SL, laid down 02/06/1940, receives 291 tons to complete
Aalborg-
No.1 type 1 slip – Uf 7, SUB, laid down 15/07/1940, receives 250 tons, balance 155 tons
No.2 type 1 slip – Uf 8, SUB, laid down 15/07/1940, receives 250 tons, balance 155 tons
No.3 type 1 slip – Uf 9, SUB, laid down 15/07/1940, receives 250 tons, balance 155 tons
No.4 type 1 slip – Uf 10, SUB, laid down 15/07/1940, receives 250 tons, balance 155 tons
No.5 type 1 slip – Uf 11, SUB, laid down 15/07/1940, receives 250 tons, balance 155 tons
No.6 type 1 slip - Uf 12, SUB, laid down 15/07/1940, receives 250 tons, balance 155 tons
Dock side – Idle
Roskilde-
Wood yard- LTC 17, LTC, laid down 02/01/1941, receives 100 tons to complete
Wood yard- LTC 18, LTC, laid down 02/01/1941, receives 100 tons to complete
Wood yard- LTC 19, LTC, laid down 02/01/1941, receives 100 tons to complete
Wood yard- LTC 20, LTC, laid down 02/01/1941, receives 100 tons to complete
Phuket-
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
Berbera-
No.1 type 1 drydock – Idle
St. Thomas-
No.1 type 1 drydock – Idle
Guinea Bisseau-
No.1 type 1 drydock – Idle
d/ Transactions
None
e/ Other Notes
LTC 17 commissions on 31/03/1941
LTC 18 commissions on 31/03/1941
LTC 19 commissions on 31/03/1941
LTC 20 commissions on 31/03/1941
KDM Artemisia continues sea trials until 19/05/1941
KDM Buxus continues sea trials until 19/05/1941
Ue 49 commences sea trials on 08/02/1941
Ue 50 commences sea trials on 08/02/1941
Ue 51 commences sea trials on 08/02/1941
Ue 52 commences sea trials on 08/02/1941
Ue 53 commences sea trials on 08/02/1941
Ue 54 commences sea trials on 08/02/1941
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 1794 tons
f/ Order of Battle
Note: X (Y) +Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 2/0 (0)
CDS = 04 (0) + 0/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 20 (0) + 0/0 (2)
CV = 02 (0) + 0/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 62 (0) + 0/0 (0)
SL = 16 (0) + 6/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 00 (0) + 0/0 (0)
CGC = 48 (0) + 0/0 (0)
STC = 36 (0) + 0/0 (0)
MTC = 100 (0) + 0/0 (0)
LTC = 20 (0) + 0/0 (0)
SUB = 63 (0) + 18/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
SRV = 03 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat/Escort
CGC = Coast Guard Cutter/Patrol Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
LTC = Large Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
SRV = Submarine Recovery Vessel