You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 6th 2012, 3:11am

Nordmark 1940Q3

Crossing my fingers that I haven't messed anything up drastically...




Nordmark 1940 Q3

A) Industry

14 non-fixed factories producing 14,000 tons of ship materials
7 non-fixed factories producing 0.7 IP for Q3/1940
2 fixed factories producing 0.2 IP for Q3/1940
Starting Stockpile of 9,972 tons
Imports of 2,000 tons from Turkey for two Ocean Class CVs

Total available construction tonnage 25,972 tons and 0.9 IP

B) Infrastructure Development
Lievsborg Type 3 Dock #1 building, 0.7IP needed, 0.7IP added, completed
Karlskrona Type 3 Dock #2 extending to Type 4, 0.6IP needed, 0.2IP added


C) Ship Construction
Karlskrona
Type 4 Slip #1: Gota Lejon Class BC, Gota Lejon building, 24,000t of 29,765t needed, 3,000t added.
Type 3 Dock #1: idle
Type 3 Dock #2: Extending
Type 3 Slip #1: Luleå Class CL, Vidar building, 8,000t of 9,500t needed, 1,500t added.
Type 3 Slip #2: Luleå Class CL, Urd building, 8,000t of 9,500t needed, 1,500t added.
Type 1 Dock #1: idle
Type 1 Dock #2: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Slip #1: idle
Type 0 Slip #2: idle

Free Floating:
Luleå Class CL, Luleå building, 2,000t of 9,500t needed, 2,000t added, completed.
Luleå Class CL, Larvik building, 2,000t of 9,500t needed, 2,000t added, completed.

Helsingfors Örlovsvarv
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Slip #1: idle

Free Floating:
Ocean Class CV, ? building, 7,000t of 13,350t needed, 1,000t added.

Gustavsvern Naval Base, Trondheim
Type 4 Dock #1: Gam Class CV, Gam building, 27,088t of 30,000t needed, 3,000t added.
Type 4 Slip #1: idle
Type 3 Dock #1: Ex Chilean BC Santiago scrapping turn 2 of 2, 3,790t available in Q1/1941.
Type 3 Slip #1: Luleå Class CL, Skuld building, 8,000t of 9,500t needed, 1500t added.
Type 1 Dock #1: idle
Type 1 Dock #2: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Dock #1: idle
Type 0 Slip #1: idle
Type 0 Slip #2: idle

Free Floating:
Luleå Class CL, Pori building, 2,000t if 9,500t needed, 2,000t added, completed.
Ocean Class CV, ? building, 7,000t of 13,350t needed, 1,000t added.


Karljohansvern Naval Base, Horten outside Oslo
Type 3 Slip #1: Luleå Class CL, Verdandi building 8,000t of 9,500t needed, 1,500t added.
Type 1 Slip #1: idle

Freefloating:
Luleå Class CL, Reykjavik building, 2,000t of 9,500t needed, 2,000t added, completed.


Oscarsvern Naval Base, Leivsborg
Type 4 Dock #1: idle
Type 4 Slip #1: Gam Class CV, Uggla building, 27,088t of 30,000t needed, 3,000t added.
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Slip #1: idle
Type 0 Slip #2: idle

Free Floating:


Iceland Naval Station
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 0 Slip #1: idle

Free Floating:

Faeroes Naval Station
Type 0 Dock #1: idle

Åland Naval Base
Type 3 Dock #1: Ex Chilean BC Valparaiso scrapping turn 2 of 2, 3,790t available in Q4/1941.
Type 1 Dock #1: idle
Type 0 Dock #1: idle

South Georgia Naval Base
Type 0 Dock #1: idle

D) Transactions

E) Other Notes

4 Lulea-class CL beginning trials
MS 39 1-4 on trials

F) Updated Order of Battle, 1/4/40

Note: X (Y) +Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 5(0)0
BC: 2(0)1
CV: 4(0)2+2 building for Turkey
CA: 5(0)0
CL: 45(0)4
DD: 110(0)0
Motor Torpedo Boats: 140(0)0
Torpedo boats: 32(0)0
Subs type (a): 34(0)0
Subs type (b): 16(0)0
Sloops/Frigates: 144(0)4
CDBB: 4(0)0
Auxiliaries 16(0)0
Landing Craft 418(0)0
Target ships 1(0)0

2,972 tons stockpile
Carnival da yo~!

This post has been edited 1 times, last edit by "Valles" (Mar 6th 2012, 3:55am)


2

Tuesday, March 6th 2012, 3:21am

The only thing I see at first blush is the 7,000t converted to IP for the dock. I think it would be easier, and probably more inline with the rules set, to just have 7 factories non-fixed to produce IP for the quarter. I'm pretty sure you can't just 'convert' tonnage to IP. I could be wrong though.

Also you've overpaid for your 2 Gam class carriers by 88t each.

This post has been edited 2 times, last edit by "Sachmle" (Mar 6th 2012, 3:26am)


3

Tuesday, March 6th 2012, 3:30am

Quoted

Originally posted by Sachmle
The only thing I see at first blush is the 7,000t converted to IP for the dock. I think it would be easier, and probably more inline with the rules set, to just have 7 factories non-fixed to produce IP for the quarter. I'm pretty sure you can't just 'convert' tonnage to IP. I could be wrong though.


Sam is quite correct on that point. A factory either produces IP or it produces tonnage; the proper approach would be to set seven factories to produce IP rather than tonnage that quarter.

4

Tuesday, March 6th 2012, 3:53am

*edits in correction*

Thanks, fixed.
Carnival da yo~!

5

Tuesday, March 6th 2012, 4:02am

Quoted

Originally posted by Valles
*edits in correction*

Thanks, fixed.



You're still overpaying for both Gam class CVs by 88t each. You have them as:

Quoted

Gam Class CV, Gam building, 27,088t of 30,000t needed, 3,000t added.

Quoted

Gam Class CV, Gam building, 27,088t of 30,000t needed, 3,000t added.

Now I'm no math major, but 27,088t + 3,000= 30,088t to me.

6

Tuesday, March 6th 2012, 8:23am

Quoted

Originally posted by Sachmle

Quoted

Originally posted by Valles
*edits in correction*

Thanks, fixed.



You're still overpaying for both Gam class CVs by 88t each. You have them as:

Quoted

Gam Class CV, Gam building, 27,088t of 30,000t needed, 3,000t added.

Quoted

Gam Class CV, Gam building, 27,088t of 30,000t needed, 3,000t added.

Now I'm no math major, but 27,088t + 3,000= 30,088t to me.



No, the total tonnage final is 30,000, and each of them still needed 27,088 tons at the start of the turn.
Carnival da yo~!

7

Tuesday, March 6th 2012, 10:54am

Don't forget that those two Ocean class building without names are building for Turkey! I will provide names ASAP.

8

Wednesday, March 7th 2012, 12:43am

Quoted

Originally posted by Valles

Quoted

Originally posted by Sachmle

Quoted

Originally posted by Valles
*edits in correction*

Thanks, fixed.



You're still overpaying for both Gam class CVs by 88t each. You have them as:

Quoted

Gam Class CV, Gam building, 27,088t of 30,000t needed, 3,000t added.

Quoted

Gam Class CV, Gam building, 27,088t of 30,000t needed, 3,000t added.

Now I'm no math major, but 27,088t + 3,000= 30,088t to me.



No, the total tonnage final is 30,000, and each of them still needed 27,088 tons at the start of the turn.


Ahh, I had started to wonder if that was what you meant.