You are not logged in.

1

Wednesday, February 8th 2012, 10:08pm

Philippine Navy - Submarines

Repository for data pertaining to the subject vessels

2

Wednesday, February 8th 2012, 10:48pm

Aluhaman class Coastal Submarine

(Historical data)

Sim by Brockpaine

Date 1938
Coastal
Armament 4 x 24" torpedoes
ElecHP 2,500
DieselHP 4,800
CREW 55
wt fuel&batts 360t
Light Displacement 768t
Loaded Displacement 948t
Full Displacement 1238t
res buoyancy 23%
Max Surf Spd 17.4 knots
Max Sub Spd 10.3 knots

Length: 60.0m
Beam: 7.0m
Draft: 5.5m
Crush depth: 200m
#TT 4 x 24" (4 reloads)
Tons Oil: 180.0t
Tons Battery: 180.0t

Surface Range 9,818@10 knots
Underwater range 56@6 knots


Aluhaman, laid down 1938
Anemona, laid down 1938
Dalag, laid down 1938
Loro, laid down 1938
Hito, laid down 1938
Tiburon, laid down 1938

3

Wednesday, February 8th 2012, 10:54pm

Mako class Fleet Submarine

(Historical data)

Sim by Brockpaine

Mako-class Submarine

Date 1940
Oceanic
Armament 4x115mm guns
ElecHP 4,000
DieselHP 12,000
CREW 100
wt fuel&batts 1000t
Misc weight 60t
Light Displacement 1935t
Loaded Displacement 2435t
Full Displacement 3016t
res buoyancy 19%
Max Surf Spd 20.4 knots
Max Sub Spd 9.9 knots

Length: 95.0m
Beam: 10.0m
Draft: 6.4m
Crush depth: 250m
#TT 10 x 21" (10 reloads)
Tons Oil: 500.0t
Tons Battery: 500.0t

Surface Range 17,717@10 knots
Underwater range 240@4 knots

Main armament in two dual unarmored turrets, one forward and one aft of conning tower. A circular trunk ran from each mounting to the magazine in the pressure hull which contained 100 rounds per gun. A working chamber 10 feet in diameter encircled the trunk between the pressure hull and the gun mount


Mako, laid down 1 May 1940, completed 24 Mar 1941
Martillo, laid down 1 May 1940, completed 24 Mar 1941



Refit Scheme

Remove 115mm gun turrets and fairwater
Fit single 115mm deck forward and one 25mm AA aft of conning tower
Add Snorkel - restructure pressure hull as necessary
Add/Improve Sonar
Add Radar

** Requires dock time for sonar upgrade - 15% of total

Projected cost to refit = 480 tons
Projected time to refit = 82 days
Projected time in dock = 13 days


Date: 1940
Oceanic
Armament: one 115mm and one 25mm AA
Elec HP: 4,000
Diesel HP: 12,000
Crew: 100
Weight of fuel & batteries 1000t
Misc weight: 42 tons
Light Displacement: 1,917 tons
Loaded Displacement 2,427 tons
Full Displacement: 3,040 tons
Reserve Buoyancy 20%
Max Surface Speed: 20.4 knots
Max Submerged Speed: 9.9 knots

Length: 95.0 m
Beam: 10.0 m
Draft: 6.4 m
Crush depth: 250 m
#TT 10 x 21" (10 reloads)
Tons Oil: 500.0 tons
Tons Battery: 500.0 tons

Surface Range 17,717@10 knots
Underwater range:240@4 knots

Mako - Refit commenced 1 July 1945, Refit completed 21 September 1945
Martillo - Refit commenced 1 July 1945, Refit completed 21 September 1945

4

Monday, October 29th 2012, 5:54pm

Audaz class Patrol Submarine

Cazador-class Patrol Submarine

Successor class of mid-sized patrol submarines projected from 1943.

-----

French Improved Daphne-class Submarine, Export

Date: 1943
Coastal
Armament: 1x75mm, 2x35mm
ElecHP: 1600hp
DieselHP: 2800hp
CREW: 36
wt fuel&batts: 360t
Light Displacement 675t
Loaded Displacement 849t
Full Displacement 1026t
Reserve buoyancy: 17%
Max Surf Speed: 15.3 knots
Max Sub Speed: 9.2 knots

Length: 57.8m
Beam: 6.7m
Draft: 5.3m
Crush depth: 212.5m
Armament: 1x75mm, 2x35mm
#TT: 8 x 24" (6 bow, 2 stern)
14 tons for reload torpedoes or mines
Tons Oil: 160.0t
Tons Battery: 200.0t
Miscellaneous Weight: 43 tons

Surface Range: 7040nm@12 knots
Submerged Range: 73nm@6 knots / 22nm@9 knots

Breakdown of Miscellaneous Weights:
- 2 tons for 2x single 35mm AA guns on deck
- 9 tons for radar and other electronics
- 5 tons for snort
- 25 tons for all other equipment

-----

Thanks to Brock for the Sub-sim

-----

Audaz – Laid down 1 January 1943; Launched 5 May 1943; Completed 16 October 1943
Furor - Laid down 1 July 1943; Launched 29 October 1943; Completed 14 April 1944
Intrepido - Laid down 1 July 1943; Launched 29 October 1943; Completed 14 April 1944
Temerario - Laid down 1 July 1943; Launched 29 October 1943; Completed 14 April 1944
Aventurio - Laid down 1 January 1944; Launched 30 April 1944; Completed 15 October 1944
Dominante - Laid down 1 January 1944; Launched 30 April 1944; Completed 15 October 1944
Bravado - Laid down 1 April 1944; Launched 30 July 1944; Completed 12 January 1945
Guerrero - Laid down 1 April 1944; Launched 30 July 1944; Completed 12 January 1945
Relampago - Laid down 1 July 1944; Launched 29 October 1944; Completed 15 April 1945
Toronado - Laid down 1 July 1944; Launched 29 October 1944; Completed 15 April 1945
Ingenioso - Laid down 1 October 1944; Launched 29 January 1945; Completed 16 July 1945
Furia - Laid down 1 October 1944; Launched 29 January 1945; Completed 16 July 1945

This post has been edited 5 times, last edit by "BruceDuncan" (Nov 1st 2013, 8:20pm)


5

Tuesday, February 24th 2015, 4:04pm

Tirador class Patrol Submarine

Tirador class Patrol Submarine

Date: 1946
Coastal
Armament: 1x75mm, 2x35mm
Elec HP: 1,600 hp
Diesel HP: 4,000 hp
Crew: 42
Weight fuel and batteries: 300 tons
Light Displacement 849 tons
Loaded Displacement 1,039 tons
Full Displacement 1,219 tons
Reserve buoyancy: 15%
Max Surface Speed: 18.2 knots
Max Submerged Speed: 12.5knots

Length: 75.0 meters
Beam: 6.5 meters
Draft: 5.0 meters
Crush depth: 270 meters
Armament: 1x75mm, 2x35mm
#TT: 8 x 24" (6 bow, 2 stern)
40 tons for reload torpedoes or mines
Tons Oil: 150
Tons Battery: 150
Miscellaneous Weight: 40 tons

Surface Range: 11,308 nm at 10 knots
Submerged Range: 74nm@ 8 knots / 39 nm@ 10 knots

Breakdown of Miscellaneous Weights:

3 tons for one twin 35mm AA guns on deck
9 tons for radar and other electronics
6 tons for snort
22 tons for all other equipment


Cormoran – Laid down 1 January 1946; Launched 29 April 1946; Completed 22 October 1946
Carricero - Laid down 1 April 1946; Launched 28 July 1946; Completed 20 January 1947
Codorniz - Laid down 1 July 1946; Launched 27 October 1946; Completed 21 April 1947
Ciquera - Laid down 1 October 1946; Launched 27 January 1947; Completed 22 July 1947
Cochoa - Laid down 1 January 1947; Launched 29 April 1947; Completed 22 October 1947
Cardinales - Laid down 1 January 1947; Launched 29 April 1947; Completed 22 October 1947
Columbina - Laid down 1 April 1947; Launched 28 July 1947; Completed 20 January 1948
Chen - Laid down 1 April 1947; Launched 28 July 1947; Completed 20 January 1948
Cygnus - Laid down 1 July 1947; Launched 27 October 1947; Completed 20 April 1948
Claravis - Laid down 1 July 1947; Launched 27 October 1947; Completed 20 April 1948
Cairina - Laid down 1 October 1947; Launched 28 January 1948; Completed 21 July 1948
Coracina - Laid down 1 October 1947; Launched 28 January 1948; Completed 21 July 1948