You are not logged in.

1

Monday, February 6th 2012, 6:04pm

Bharat, Q3 1941

BHARAT, Q3/1941

A. Factories

6/11 factories = 6,000 t of material + 1,291 t transferred + 4,274 t stockpile = 11,565 t available.

7,096 t are used, leaving a stockpile of 4,4469 t.

0/11 factories (committed) = 0.0 infrastructure pts available.

5/11 factories (flexible) = 0.5 infrastructure pts available.


B. Infrastructure Development

Expansion of Chennai S3 to S3.5; 0.5 IP utilized, completed.


C. Naval Development and Construction

At Mumbai:
S3: Idle
S2.5: Idle
S1: Idle
S1: Idle
D3: CL Agra begins 50% refit, receives 1,167 t.
Free Floating:
BC Samanjir receives 0 t, balance 13563t, to complete May 1943.
DD Balia receives 0 t, balance 386t, to complete Dec 1941.
DD Malout receives 0 t, balance 386t, to complete Sep 1941.

At Male:
D3: SS I-6 undergoes 25% refit, receives 329 t; completed 9/41
D1: SS I-7 undergoes 25% refit, receives 329 t; completed 9/41
Free Floating:
CA Chapra receives 0 t, balance 7,522 t, to complete Nov 1942.

At Diego Garcia:
S1: Idle
D1: SS I-8 undergoes 25% refit, receives 329 t; completed 9/41
Free Floating:
DD Dabra receives 0 t, balance 386 t, to complete Dec 1941.

At Trincomalee:
S1: Idle
S1: Idle
S0: Idle
D2: CL Dhaka begins 50% refit, receives 1,167 t
Free Floating:
DD Coonoor receives 0 t, balance 386 t, to complete Dec 1941.
DD Dadra receives 0 t, balance 386 t, to complete Feb 1942.
AT Iraani begins 25% refit, receives 502 t, to complete 10/41

At Chennai:
S3: Idle
S2: Idle
S1: Idle
D4: SS I-9 undergoes 25% refit, receives 113 t, completed 8/41
D3: CVL Khanda scrapped during July.
Free-floating:
CA Chiplun receives 0 t, balance 7,522 t, to complete Nov 1942.
DD Gaya receives 0 t, balance 386t, to complete Dec 1941.
Persian CVL Oqab receives 0 t, balance 2,381 t, to complete Mar 1942.
AT Laloo Sen begins 25% refit, receives 502 t, to complete 10/41

At Sittwe:
S1:
S0: idle
D1: Sloop Cuddalore undergoes 15% refit, receives 134 t, completed 8/41
Free Floating:
BM Chandragupta begins 25% refit, receives 954 t, to complete 10/41
DD Datia receives 0 t, balance 386t, to complete Feb 1942.
DD Dewas receives 0 t, balance 386t, to complete Feb 1942.

Miscellaneous Dock-Side Refits (All completed during quarter)
12 x Bhramaputra class coastal minesweepers @ 15%: Total 720 t
4 x Chindwin class oceanic minesweepers @ 15%: Total 556 t
2 x Ganges class oceanic minesweepers @ 15%: Total 202 t
1 x T-19 class torpedo-boat @ 15%: Total 92 t


D. Transactions:

BM Bindusara transferred to Hedjaz

1,191 t transferred from Persia for CVL Oqab

100 t transferred from Hedjaz


E. Other notes:

Buncha civilian ships being built.

Construction dates of warships has been pushed back three months to reflect stoppage of work.


F. Scrap Report:

CVL Khanda scrapped on way. Material to be recovered Q2/42

4 x Penner class AM deleted but not scrapped.

2 x Colombo class CL deleted but not scrapped.

1 x G120 class DD deleted but not scrapped.

1 x Mahanadi class AO deleted but not scrapped.


G. Updated Order of Battle, 31/09/41

Note: X(Y) +Z= completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 3(0) + 1
Aircraft Carriers (CV): 5(0) + 0
Armored Cruisers (AC): 4(0) + 0
Cruisers (CL): 19(2) + 2
Destroyers (DD): 45(0) + 8
Torpedo Boats (TB): 1(0) + 0
Submarines (SS): 28(0) + 0
Monitors (BM): 0(1) + 0

Patrol and Escort Ships

Seaplane Carriers (CVS): 2(0) + 0
Frigates (PF): 4(0) + 0
Paratraatii (PP): 26(0) + 0
Charavaahii (PC): 13(0) + 0
Survey Ships (PS): 1(0) + 0
Daakuui (D): 8(0) + 0

Coastal Forces

Motor Torpedo Boats (MTB/MGB): 76(0) + 0
ASW Launches (ASL): 57(0) + 0
Harbour Patrol Craft (PH): 7(0) + 0

Mine Warfare

Minelayers (CM): 10(0) + 0
Minesweepers (AM): 22(0) + 0

Fleet Train

Oilers (AO): 0(2) + 0
Tenders (AT): 9(2) + 0
Repair Ships (AR): 1(0) + 0
Hospital Ships (AH): 1(0) + 0
Harbour Defense Vessels (AN): 5(0) + 0
Ocean-going Tugs (AU): 2(0) +0
Aviation Maintenance Ships (AV): 1(0) + 0

Amphibious Assault Ships:
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Craft, Vehicle (LCV): 9(0) + 0
Armed Transport (APD): 4(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0
Landing Ship, Tank (LST): 3(0) + 0

2

Monday, February 6th 2012, 6:06pm

KINGDOM OF HEDJAZ: Q3 1941

Industrial Allocation

0.5 factories allocated to building warship material

500Tons + 0 tons Stockpiled = 500 t available
335 t used
165 t stockpiled

0.0 factory allocated to production of infrastructure materials

Construction and Refits

At Jiddah
D1: Customs Inspection Boat C-1 built, 40 t
Free Floating: N/A

At As Salif (shared with Bharat)
S0: ASW Launch GB-7 built, 195 t
Free Floating: N/A


Transactions

100 t to Bharat - completion of contract for S-101 class sloops. Lead unit to deliver beginning of Q4.

ex-BNS monitor Bindusara accepted as RHN Saiph ("Sword") after inspections and trials.


Updated Order of Battle, 31/09/41

Completed (Under Repair or Refit) + Under Construction

Destroyers: 2(0) + 0
Gun Boats: 1(0) + 0
Monitors: 1(0) + 0
MTB: 20(0) + 0
Submarines: 3(0) + 0

Sloop: 0(1) + 2
Submarine chaser: 7(0) + 0
Mine Warfare Vessel: 2(0) + 0
Customs Inspection Boat: 1(0) + 0

3

Monday, February 13th 2012, 6:36pm

Edit: Revised the Chennai slip expansion.

4

Monday, February 13th 2012, 6:50pm

Mexico bought the L-1 minelayers a while back, as such is most grateful for their free refit. ;-)

5

Monday, February 13th 2012, 6:51pm

Eh? When that happen?

6

Monday, February 13th 2012, 7:02pm

Q4/35

7

Monday, February 13th 2012, 7:04pm

Then I'll just slip that 273 t into my pocket, whistle, and back out of this thread.