You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, July 17th 2004, 10:05pm

Report of the Republic of France 1 October 1923

A. Industrial Allocation

5/23 factories to naval materials: 5,080 metric tons (8,000 tons) created for Q4/1923. 3,590 tons saved from Q3/23, making 8,670 metric tons total

18/23 factories (committed) to infrastructure development: 1.8 points for Q4/1923 plus 1.8 bonus points for a total of 3.6.

0/23 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced

B. Infrastructure Development

1 new factory with 5.1 points completed by Q3/1923
1.0 points added to second new factory in Q4/1923, ending with 5.1 points completed.

1 new class 0 slip at Saigon with 0.3 pts completed by Q3/23 - 0.2 pts added in Q4/23 to complete.

1 new Class 0 slip at Noumea with 0.3 pts completed by Q3/23 - 0.2 pts added in Q4/23 to complete

2 new Class 0 slips at Marseilles - with 0.3 pts each completed by Q3/23 - 0.2 pts added to each in Q4/23 to complete

1 new Class 3 slip at Marseilles - with 1.8 pts completed by Q3/23 - 1.2 pts added in Q4/23 to complete.

C. Naval Construction

At La Rochelle
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

At Brest
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Ceyenne
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Abidjan
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Marseilles
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Oran
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Beiruit
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Crozet Island
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

At Saigon
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle

At New Caledonia
Class 2 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle

Launched ships being completed:

Clemenceau class Aircraft Carrier laid down 1/1/23. 8,250 tons completed by Q3/23. 3,000 tons added in Q4/23. Launched 8 October 1923

Noumea class minesweeper #6 laid down 4/9/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.

Noumea class minesweeper #7 laid down 4/9/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.

Noumea class minesweeper #8 laid down 4/10/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.

Noumea class minesweeper #9 laid down 4/10/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.

Noumea class minesweeper #10 laid down 4/9/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.

D. Transactions

None. 5,080 metric tons warship materials saved.

E. Other Notes

10 Seine class Corvettes and 10 Noumea class minesweeper completed in Q4/23

F. Updated Order of Battle, 1 January 1924

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 5(0)+0
BC: 0(0)+0
CV:2(0)+1
CA: 6(0)+0
CL: 8(0)+0
Monitors: 0(0)+0
DD: 78(0)+0
Sloops: 0(0)+0
Fleet Submarine: 15(0)+0
Coastal Submarine: 60(0)+0