You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, September 1st 2011, 2:44am

Brazil 1941: Q2

Q2 1941 Activity

Brazil
7/7 factories producing naval materials: 7000 tons created for Q2/41. 7000 total tons + 365 stockpiled from previous quarter + 0 tons from scrapping = 7365 tons

6594 tons used. 771 tons left for Q3/41

0/2 factories committed for Quarter to infrastructure development = 0.0i.p.
0/2 factories committed for Year to infrastructure development

B. Infrastructure Development
0.1 ip to factory + 0.0

C1. Naval Construction

Rio de Janeiro:
Class 3 Slipway: Idle
Class 1 Slipway: Idle
Class 1 Slipway: DD-35 Grande laid down Q1/41, 1137/1586 tons required. 449t added Q2/41. 688t needed. Launched.
Class 1 Slipway: DD-36 Grande laid down Q2/41, 1586/1586 tons required. 449t added Q2/41. 1137t needed.
Class 1 Slipway: Idle: idle
Class 3.5 Drydock: idle
Class 3 Drydock: idle
Dockside: DD-33 Engano laid down Q3/40, 239/1586 tons required. 239t added Q2/41. 0t needed, completes.
Dockside: DD-34 Ferro laid down Q4/40, 688/1586 tons required. 449t added Q2/41. 239t needed.
Dockside: SS B-3 laid down Q4/40, 628/1470 tons required. 421t added Q2/41. 207t needed.

Macapa:
Class 1 Slipway: idle
Class 1 Slipway: idle
Class 1 Slipway: idle
Class 1 Slipway: idle
Class 1 Slipway: idle
Class 1 Slipway: idle
Class 0 Drydock: idle
Dockside: SS B-2 laid down Q4/40, 207/1470 tons required. 207t added Q2/41. 0t needed, completes.

Manaus:
Class 0 Slipway: idle
Class 0 Slipway: idle
Class 0 Drydock: idle
Class 0 Drydock: idle

C2. Ships on shakedown cruises:

1st Three Months

DD-32 Dourado

2nd Three Months

None.

D. Transactions

2190t to Germany for BC Sao Paulo
2190t to Germany for BC Rio de Janeiro

E. Other Notes

Report may be updated for errors.
EDIT: Added DD-36 to the construction order. Tonnaged had been payed, just not assigned a slipway.

F. Updated Order of Battle-
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships 1(0)+0
Coastal Battleships 0(0)+0
Aircraft Carriers 1(0)+0
Battlecruisers 0(0)+2
Light Cruisers 15(0)+0
Destroyers 26(0)+3
Submarines 13(0)+2
Gunboats 5(0)+0
Minelayers 1(0)+0
Minesweepers 20(0)+0
Submarine Tender 1(0)+0
Collier 1(0)+0
Training Ship 1(0)+0
You smug-faced crowds with kindling eye
Who cheer when soldier lads march by,
Sneak home and pray you'll never know
The hell where youth and laughter go.
-Siegfried Sassoon

This post has been edited 1 times, last edit by "snip" (Nov 30th 2011, 10:46pm)