You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, August 29th 2011, 5:38am

France, Q2/1941

[SIZE=5]Report for Q2/1941[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 27/27 factories producing 27,000t materials.
- 0/27 factories producing infrastructure
- 5,175t from stockpile.
- 2,283t from transactions.
- 3,420t from scrapping.
- 37,878t materials total.
- 32,437t used.
- 5,441t stored for Q3/41.

[SIZE=3]Infrastructure Development [/SIZE]
N/A

[SIZE=3]Naval Construction [/SIZE]

At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q2/1941 for a total of 6000 / 33000 tons. 27000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 4 Slip #1 - Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q2/1941 for a total of 6000 / 33000 tons. 27000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Contre-Torpillieur Surcouf (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 3 Slip #4 - Contre-Torpillieur Kersaint (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 2 Slip #1 - Contre-Torpillieur Cassard (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 2 Slip #2 - Contre-Torpillieur Bouvet (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 1 Slip #1 - Contre-Torpillieur Sabre (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Slip #2 - Contre-Torpillieur Baliste (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle

Dockside:
- Curaissier Libertie laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q2/1941 for a total of 42000 / 45986. 3986 / 45986 tons remaining. Launched Q2/1940.
- Curaissier Justice laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q2/1941 for a total of 42000 / 45986. 3986 / 45986 tons remaining. Launched Q2/1940.
- Heavy Cruiser Téméraire laid down January 1940. 17,079 tons required. 2100 tons added Q2/1941 for total of 12600 / 17,079 tons. 4479 / 17079 tons remaining until completion.
- Oiler Luceafarul converted into fleet oiler for Romania. 2283 tons required. 2283 tons added in Q2/41 for a total of 2283 / 2283 tons. 0 / 2283 tons remaining; conversion completes.
- Transport Camerone converted from merchantman into troopship. 211 tons required. 211 tons added in Q2/41 for a total of 211 / 211 tons. 0 / 211 tons remaining; conversion completes.
- Salvage Tug Eridan acquired as naval auxiliary. 223 tons required. 223 tons added in Q2/41 for a total of 223 / 223 tons. 0 / 223 tons remaining; conversion completes.
- Minesweeper Capucine laid down July 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q2/1941.
- Minesweeper Petunia laid down July 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q2/1941.
- Minesweeper Pâquerette laid down October 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completes Q3/1941.
- Minesweeper Jasmine laid down October 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completes Q3/1941.

At Brest (Cl 5)
Class 3 Drydock #1 - Cruiser Roland undergoing 50% reconstruction beginning January 1st, 1941. 1,930 tons required. 830 tons added in Q1/1941 for a total of 1930 / 1930. 0 / 1930 tons remaining.
Class 2 Drydock #1 - Cruiser Olifant undergoing 50% reconstruction beginning January 1st, 1941. 1,930 tons required. 830 tons added in Q1/1941 for a total of 1930 / 1930. 0 / 1930 tons remaining.
Class 1 Drydock #1 - Falcon-class submarine Falcon #1 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.

At Abidjan (Cl 5)
Class 3 Drydock #1 - Falcon-class submarine Falcon #2 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 1 Drydock #1 - Falcon-class submarine Falcon #3 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.

At Marseilles (Cl 5)
Class 4 Drydock #1 - Falcon-class submarine Falcon #4 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #5 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #6 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #7 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #8 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - TCD-1 Châteaurenault laid down January 1st, 1941. 7,539 tons required. 1,500 tons added in Q2/1941 for a total of 3000 / 7539. 4539 / 7539 tons remaining until completion on May 17th, 1942.
Class 2 Drydock #1 - CL Jean de Vienne continues conversion into minelaying cruiser. 3,804 tons required. 304 tons added Q2/1941 for total of 3804 / 3804. 0 tons remaining until completion. Completed Q2/1941.
Class 1 Slip #1 - Contre-Torpillieur Dehorter (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Slip #2 - Contre-Torpillieur Javeline (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Drydock #1 - Falcon-class submarine Falcon #9 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 0 Drydock #1 - Falcon-class submarine Falcon #10 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.

Dockside:
- Aircraft Carrier Bucentaure laid down Q1/39. 35,000 tons required. 3000 tons added Q2/1941 for total of 30000 / 35000 tons. 5,000 / 35000 tons remaining until completion.

At Oran (Cl 5)
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

At Tunis (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Idle

Dockside:
- Aircraft Carrier Conquérant laid down Q2/39. 35,000 tons required. 3000 tons added Q2/1941 for total of 27000 / 35000 tons. 8000 / 35000 tons remaining until completion.

At Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

Dockside:
- None

At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle
Class 1 Drydock - Idle
Class 1 Drydock #1 - Idle

Dockside:
- None

At Saigon (Cl 5)
Class 4 Drydock #1 - Vehicle Landing Ship Montebello undergoing 25% reconstruction beginning April 30th 1941. 1319 tons required. 900 tons added in Q2/1941 for a total of 900 / 1319. 419 / 1319 tons remaining.
Class 1 Drydock #1 - Two craft laid down end to end. EDA-55 landing craft laid down April 1st; 55 tons added Q2/41. Completed April 30th, 1941, launched. EDA-55 landing craft laid down April 1st; 55 tons added Q2/41. Completed April 30th, 1941, launched.
Class 0 Drydock #1 - Two craft laid down end to end. EDA-13 landing craft laid down April 1st; 13 tons added Q2/41. Completed April 30th, 1941, launched. EDA-13 landing craft laid down April 1st; 13 tons added Q2/41. Completed April 30th, 1941, launched.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down April 1st; 8 tons added Q2/41. Completed April 30th, 1941, launched. Vedette FOM 11m laid down April 1st; 12 tons added Q2/41. Completed April 30th, 1941, launched.
Class 0 Slip #2 - Idle

Dockside:
- None

Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle

Dockside:
- None

At Papeete (Cl 3)
Class 3.5 Drydock - Idle

Dockside:
- None

On Trials:
- CV Ocean until Q3/41.
- CL Dupleix until Q2/41.

[SIZE=3]Transactions [/SIZE]
- 200 tons to Germany for torpedo boats.

[SIZE=3]Other Notes [/SIZE]
The battleships Libertie and Justice have been launched by the naval yards in La Rochelle and are now under construction at the pierside.

[SIZE=3]Ships being scrapped [/SIZE]
- 10 Falcon-class submarines (66 tons per ship in Q2/41)

- Total tonnage in recycling until Q2/1941: (5x100)+(20x146) = 3,420 tons
- Total tonnage in recycling until Q3/1941: (5x8)+(20x20)+(7x100)+(4x146) = 1,724 tons
- Total tonnage in recycling until Q4/1941: (7x8)+(4x20) = 136 tons
- Total tonnage in recycling until Q1/1942: (10x66) = 660

[SIZE=3]Updated Order of Battle, End of Q2/1941[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction

Battleships: 7(0)+2
Battlecruisers: 4(0)+0
Aircraft Carriers:6(0)+4
Heavy Cruisers: 13(0)+1
Light Cruisers: 27(3)+0
Coast Defense Ships: 5(0)+0
Destroyers: 76(0)+8
Sloops: 8(0)+0
Fleet Submarines: 39(0)+0
Coastal Submarines: 84(0)+0
Motor Torpedo Boats: 12(0)+0
River Gunboats: 34 (0)+0
Vedettes: 2(0)+0
Minesweepers: 24(0)+4

Fleet Train:
Fast Oilers: 8(0)+0
Fleet Tenders: 0(0)+0
Repair Ships: 1(0)+0
Ammunition Ships: 0(0)+0

Auxiliaries:
Sail Training Ships: 2(0)+0
Transports: 0(0)+0
Fleet Tugs: 1(0)+0
Light Harbour Tugs: 0(0)+0
Netlayers: 0(0)+0
Oceanic Research Ship: 2(0)+0

Amphibious Forces:
Dock Landing Ship: 0(0)+1
Vehicle Landing Ship: 0(1)+0
Heavy Landing Ship: 8(0)+0
Amphibious Transport Ships: 1(0)+0
Tank Landing Craft (EDA): 4(0)+0
Infantry Assault Craft (EA): 4(0)+0