[SIZE=5]Report for Q2/1941[/SIZE]
[SIZE=3]Industrial Allocation[/SIZE]
- 27/27 factories producing 27,000t materials.
- 0/27 factories producing infrastructure
- 5,175t from stockpile.
- 2,283t from transactions.
- 3,420t from scrapping.
- 37,878t materials total.
- 32,437t used.
- 5,441t stored for Q3/41.
[SIZE=3]Infrastructure Development [/SIZE]
N/A
[SIZE=3]Naval Construction [/SIZE]
At La Rochelle (Cl 5)
Class 4.5 Slip #1 - Aircraft Carrier Vengeur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q2/1941 for a total of 6000 / 33000 tons. 27000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 4 Slip #1 - Aircraft Carrier Pacificateur laid down January 1st, 1941. 33,000 tons required. 3,000 tons added in Q2/1941 for a total of 6000 / 33000 tons. 27000 / 33000 tons remaining. Launch planned for June 24th, 1942. Completion planned for May 1st, 1944.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Contre-Torpillieur Surcouf (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 3 Slip #4 - Contre-Torpillieur Kersaint (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 2 Slip #1 - Contre-Torpillieur Cassard (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 2 Slip #2 - Contre-Torpillieur Bouvet (Surcouf-class) laid down January 1st, 1941. 2,669 tons required. 700 tons added in Q2/1941 for a total of 1400 / 2669 tons. 1269 / 2669 tons remaining. Launched May 21st, 1941. Completion planned for December 21st, 1941.
Class 1 Slip #1 - Contre-Torpillieur Sabre (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Slip #2 - Contre-Torpillieur Baliste (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Dockside:
- Curaissier Libertie laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q2/1941 for a total of 42000 / 45986. 3986 / 45986 tons remaining. Launched Q2/1940.
- Curaissier Justice laid down January 1 1938. 45,986 tons required. 3,000 tons added in Q2/1941 for a total of 42000 / 45986. 3986 / 45986 tons remaining. Launched Q2/1940.
- Heavy Cruiser Téméraire laid down January 1940. 17,079 tons required. 2100 tons added Q2/1941 for total of 12600 / 17,079 tons. 4479 / 17079 tons remaining until completion.
- Oiler Luceafarul converted into fleet oiler for Romania. 2283 tons required. 2283 tons added in Q2/41 for a total of 2283 / 2283 tons. 0 / 2283 tons remaining; conversion completes.
- Transport Camerone converted from merchantman into troopship. 211 tons required. 211 tons added in Q2/41 for a total of 211 / 211 tons. 0 / 211 tons remaining; conversion completes.
- Salvage Tug Eridan acquired as naval auxiliary. 223 tons required. 223 tons added in Q2/41 for a total of 223 / 223 tons. 0 / 223 tons remaining; conversion completes.
- Minesweeper Capucine laid down July 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q2/1941.
- Minesweeper Petunia laid down July 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completed Q2/1941.
- Minesweeper Pâquerette laid down October 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completes Q3/1941.
- Minesweeper Jasmine laid down October 1, 1940. 578 tons required. 0 tons added in Q2/1941 for a total of 578 / 578. 0 / 578 tons remaining. Completes Q3/1941.
At Brest (Cl 5)
Class 3 Drydock #1 - Cruiser Roland undergoing 50% reconstruction beginning January 1st, 1941. 1,930 tons required. 830 tons added in Q1/1941 for a total of 1930 / 1930. 0 / 1930 tons remaining.
Class 2 Drydock #1 - Cruiser Olifant undergoing 50% reconstruction beginning January 1st, 1941. 1,930 tons required. 830 tons added in Q1/1941 for a total of 1930 / 1930. 0 / 1930 tons remaining.
Class 1 Drydock #1 - Falcon-class submarine Falcon #1 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
At Abidjan (Cl 5)
Class 3 Drydock #1 - Falcon-class submarine Falcon #2 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 1 Drydock #1 - Falcon-class submarine Falcon #3 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
At Marseilles (Cl 5)
Class 4 Drydock #1 - Falcon-class submarine Falcon #4 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #5 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #6 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #7 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining. Falcon-class submarine Falcon #8 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 3 Slip #1 - Idle
Class 3 Slip #2 - TCD-1 Châteaurenault laid down January 1st, 1941. 7,539 tons required. 1,500 tons added in Q2/1941 for a total of 3000 / 7539. 4539 / 7539 tons remaining until completion on May 17th, 1942.
Class 2 Drydock #1 - CL Jean de Vienne continues conversion into minelaying cruiser. 3,804 tons required. 304 tons added Q2/1941 for total of 3804 / 3804. 0 tons remaining until completion. Completed Q2/1941.
Class 1 Slip #1 - Contre-Torpillieur Dehorter (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Slip #2 - Contre-Torpillieur Javeline (Sabre-class) laid down January 1st, 1941. 2,100 tons required. 525 tons added in Q2/1941 for a total of 1050 / 2100 tons. 1025 / 2100 tons remaining. Launched May 14th, 1941. Completion planned for December 4th, 1941.
Class 1 Drydock #1 - Falcon-class submarine Falcon #9 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
Class 0 Drydock #1 - Falcon-class submarine Falcon #10 scrapping from November onward. 1.78 months to scrap. 66 tons recovered Q2/41 for total of 66/66 tons recovered. 0 tons remaining.
Dockside:
- Aircraft Carrier Bucentaure laid down Q1/39. 35,000 tons required. 3000 tons added Q2/1941 for total of 30000 / 35000 tons. 5,000 / 35000 tons remaining until completion.
At Oran (Cl 5)
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Tunis (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Idle
Dockside:
- Aircraft Carrier Conquérant laid down Q2/39. 35,000 tons required. 3000 tons added Q2/1941 for total of 27000 / 35000 tons. 8000 / 35000 tons remaining until completion.
At Beiruit (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Dockside:
- None
At Djibouti (Cl 2)
Class 2 Drydock #1 - Idle
Class 1 Drydock - Idle
Class 1 Drydock #1 - Idle
Dockside:
- None
At Saigon (Cl 5)
Class 4 Drydock #1 - Vehicle Landing Ship Montebello undergoing 25% reconstruction beginning April 30th 1941. 1319 tons required. 900 tons added in Q2/1941 for a total of 900 / 1319. 419 / 1319 tons remaining.
Class 1 Drydock #1 - Two craft laid down end to end. EDA-55 landing craft laid down April 1st; 55 tons added Q2/41. Completed April 30th, 1941, launched. EDA-55 landing craft laid down April 1st; 55 tons added Q2/41. Completed April 30th, 1941, launched.
Class 0 Drydock #1 - Two craft laid down end to end. EDA-13 landing craft laid down April 1st; 13 tons added Q2/41. Completed April 30th, 1941, launched. EDA-13 landing craft laid down April 1st; 13 tons added Q2/41. Completed April 30th, 1941, launched.
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down April 1st; 8 tons added Q2/41. Completed April 30th, 1941, launched. Vedette FOM 11m laid down April 1st; 12 tons added Q2/41. Completed April 30th, 1941, launched.
Class 0 Slip #2 - Idle
Dockside:
- None
Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle
At New Caledonia (Cl 5)
Class 4 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Dockside:
- None
At Papeete (Cl 3)
Class 3.5 Drydock - Idle
Dockside:
- None
On Trials:
- CV Ocean until Q3/41.
- CL Dupleix until Q2/41.
[SIZE=3]Transactions [/SIZE]
- 200 tons to Germany for torpedo boats.
[SIZE=3]Other Notes [/SIZE]
The battleships Libertie and Justice have been launched by the naval yards in La Rochelle and are now under construction at the pierside.
[SIZE=3]Ships being scrapped [/SIZE]
- 10 Falcon-class submarines (66 tons per ship in Q2/41)
- Total tonnage in recycling until Q2/1941: (5x100)+(20x146) = 3,420 tons
- Total tonnage in recycling until Q3/1941: (5x8)+(20x20)+(7x100)+(4x146) = 1,724 tons
- Total tonnage in recycling until Q4/1941: (7x8)+(4x20) = 136 tons
- Total tonnage in recycling until Q1/1942: (10x66) = 660
[SIZE=3]Updated Order of Battle, End of Q2/1941[/SIZE]
Note: X(Y)+Z = completed (under repair/refit) + under construction
Battleships: 7(0)+2
Battlecruisers: 4(0)+0
Aircraft Carriers:6(0)+4
Heavy Cruisers: 13(0)+1
Light Cruisers: 27(3)+0
Coast Defense Ships: 5(0)+0
Destroyers: 76(0)+8
Sloops: 8(0)+0
Fleet Submarines: 39(0)+0
Coastal Submarines: 84(0)+0
Motor Torpedo Boats: 12(0)+0
River Gunboats: 34 (0)+0
Vedettes: 2(0)+0
Minesweepers: 24(0)+4
Fleet Train:
Fast Oilers: 8(0)+0
Fleet Tenders: 0(0)+0
Repair Ships: 1(0)+0
Ammunition Ships: 0(0)+0
Auxiliaries:
Sail Training Ships: 2(0)+0
Transports: 0(0)+0
Fleet Tugs: 1(0)+0
Light Harbour Tugs: 0(0)+0
Netlayers: 0(0)+0
Oceanic Research Ship: 2(0)+0
Amphibious Forces:
Dock Landing Ship: 0(0)+1
Vehicle Landing Ship: 0(1)+0
Heavy Landing Ship: 8(0)+0
Amphibious Transport Ships: 1(0)+0
Tank Landing Craft (EDA): 4(0)+0
Infantry Assault Craft (EA): 4(0)+0