You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, April 16th 2011, 7:34pm

United States Q3&4/40

3rd Quarter 1940
Total # of Factories--Factories for Naval Cons.--Factories for IP--Dedicated IP Factories
30--28 for 28,000 tons--2 for 0.2 IP--2 for 0.2 IP in Q4/40

Surplus Tons--Tons Used--Left Over Tonnage
656+3730+1700--33825--261

Ships under Construction
Ship’s Name--L/D--Shipyard--Q/Y--Tons/Q/Remaining--Status
BB Montana--Q1/37--Norfolk--Q15/22--2613/19168--Fitting Out
BB South Dakota--Q1/37--New York--Q15/22--2613/19168--Fitting Out
BB Utah--Q3/37--New York--Q13/22--2613/27006--Fitting Out
BB Iowa--Q3/37--Norfolk--Q13/22--2613/27006--Fitting Out
BB Chapultepec--Q3/37--Mare Island--Q13/13--2214/0--Completed
CV Hornet--Q3/38--Bremerton--Q9/10--2085/2089--Fitting Out
CA Los Angeles--Q1/40--New York T4 Slip--Q3/10--1825/12776--Building
CA Wichita--Q1/40--Bremerton T4 Slip--Q3/10--1825/12776--Building
CL Olympia--Q1/40--New Orleans T3 DD--Q3/9-- -500/7591--Suspended (-500 damage to ship due to drydock accident)
CL Astoria--Q1/40--Charleston T3 Slip--Q3/7--1417/5674--Launched
DD Bainbridge--Q1/40--New Orleans--Q3/4--488/490--Fitting Out
DD Barry--Q1/40--New Orleans--Q3/4--488/490--Fitting Out
DD Chauncey--Q2/40--Pensacola T1 DD--Q2/4--488/978--Launched
DD Dale--Q2/40--Camden T1 Slip--Q2/4--488/978--Launched
DD Decatur--Q2/40--Camden T1 Slip--Q2/4--488/978--Launched
DD Hopkins--Q2/40--San Francisco T1 Slip--Q2/4--488/978--Launched

Ships Under Repair, Refit, Rebuilding, or Reconstruction
Ship’s Name--Started--Shipyard--Q/Y--Tons/Q/Remaining--Status
BC Lexington L4--Q3/38--Bremerton T4DD--Q9/9--2396/0--Completed
BC Saratoga L4--Q3/38--San Francisco T4DD--Q9/9--2396/0--Completed
CA Pensacola L3--Q1/40--San Francisco T3 DD--Q2/2--1333/0--Completed
CL Milwaukee L3--Q2/40--Norfolk Pier--Q2/2--964/0--Completed
CL Detroit--Q2/40--San Diego Pier--Q2/2--964/0--Completed
CL Trenton--Q2/40--Charleston Pier--Q2/2--964/0--Completed
CL Concord--Q2/40--Boston Pier--Q2/2--964/0--Completed
DD Little--Q3/40--Q1/1--166--Completed
DD Kimberley--Q3/40--Q1/1--166--Completed
DD Sigourney--Q3/40--Q1/1--166--Completed
DD Gregory--Q3/40--Q1/1--166--Completed

Ships Being Scrapped
Ship’s Name--Started--Shipyard--Q/Y--Tons/Rec.--Status

Industrial Production
Project--Total IP Req.--IP Allocated--IP Remaining
Built T5 FDD Pearl Harbor--3--0.2--1.1

4th Quarter 1940
Total # of Factories--Factories for Naval Cons.--Factories for IP--Dedicated IP Factories
30--22 for 22,000 tons--8 for 0.8 IP--2 for 0.2 IP in Q4/40

Surplus Tons--Tons Used--Left Over Tonnage
261+3730+2800--27719--1072

Ships under Construction
Ship’s Name--L/D--Shipyard--Q/Y--Tons/Q/Remaining--Status
BB Montana--Q1/37--Norfolk--Q16/22--2613/16555--Fitting Out
BB South Dakota--Q1/37--New York--Q16/22--2613/16555--Fitting Out
BB Utah--Q3/37--New York--Q14/22--2613/24393--Fitting Out
BB Iowa--Q3/37--Norfolk--Q14/22--2613/24393--Fitting Out
CV Hornet--Q3/38--Bremerton--Q10/10--2089/0--Completed
CA Los Angeles--Q1/40--New York T4 Slip--Q4/10--1825/10951--Launched
CA Wichita--Q1/40--Bremerton T4 Slip--Q4/10--1825/10951--Launched
CL Olympia--Q1/40--New Orleans T3 DD--Q4/9--1417/6174--Building
CL Astoria--Q1/40--Charleston--Q4/7--1417/4257--Fitting Out
DD Bainbridge--Q1/40--New Orleans--Q4/4--591/0--Completed
DD Barry--Q1/40--New Orleans--Q4/4--591/0--Completed
DD Chauncey--Q2/40--Pensacola--Q3/4--488/490--Fitting Out
DD Dale--Q2/40--Camden--Q3/4--488/490--Fitting Out
DD Decatur--Q2/40--Camden--Q3/4--488/490--Fitting Out
DD Hopkins--Q2/40--San Francisco--Q3/4--488/490--Fitting Out
CL Minneapolis--Q4/40--San Francisco T3 Slip--Q1/7--1417/8508--Laid Down
CL Quincy--Q4/40--San Francisco T3 Slip--Q1/7--1417/8508--Laid Down
DD Hull--Q4/40--Boston T1 Slip--Q1/4--488/1466--Laid Down
DD Lawrence--Q4/40--Boston T1 Slip--Q1/4--488/1466--Laid Down
DD Macdonough--Q4/40--Philadelphia T1 Slip--Q1/4--488/1466--Laid Down
DD Paul Jones--Q4/40--Baltimore T1 Slip--Q1/4--488/1466--Laid Down
DD Perry--Q4/40--Norfolk T1 Slip--Q1/4--488/1466--Laid Down
DD Preble--Q4/40--Norfolk T1 Slip--Q1/4--488/1466--Laid Down

Ships Under Repair, Refit, Rebuilding, or Reconstruction
Ship’s Name--Started--Shipyard--Q/Y--Tons/Q/Remaining--Status


Ships Being Scrapped
Ship’s Name--Started--Shipyard--Q/Y--Tons/Rec.--Status


Industrial Production
Project--Total IP Req.--IP Allocated--IP Remaining
Built T5 FDD Pearl Harbor--3--0.6--0.5
Repair T3 DD New Orleans--0.4--0.4--Completed

I'll try and update my news but I'm in a serious funk/writer's block. Suffice to say there was a serious accident in Q3 in New Orleans and the Olympia suffered 500 tons of damage and the drydock suffered 0.4 IP worth of damage.

This post has been edited 1 times, last edit by "CanisD" (Apr 17th 2011, 6:09am)


2

Saturday, April 16th 2011, 8:29pm

Are you counting the 2800t from Philippines in Q4?

3

Sunday, April 17th 2011, 5:56am

CRAP!
*grumblegrumbleIHATEMATHgrumblegrumble*

Fixed it.

This post has been edited 1 times, last edit by "CanisD" (Apr 17th 2011, 6:11am)