You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Monday, July 5th 2004, 5:00pm

Quarterly Report #11 for the SAE

[SIZE=3]SAE Quarterly Reports [/SIZE]
No. 11 – July to September 1923


Transfers:

None


Factories:

25 factories total can be used.

Fixed factories

5 factories will be fixed to produce infrastructure points for 1923.

Flexible factories

4ts material transferred from Q2

19,312s material necessary to be produced in this quarter (20 factories).

0 factory producing 0,0pts for infrastructure.

Infrastructure points used this quarter:

0,1pts put into a new factory (#26) for a total of 10pts at the end of Q3
0,4pts put into a new Type 1 Dock in Daressalam for a total of 0,6pts at the end of Q3


[SIZE=3]Ships: [/SIZE]


Minor vessels

Completed Units

13x Flower-class minesweeper
15x Tree-class minesweeper
7x Bush-class minesweeper

7x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops

4x Guard-class patrol crafts

3x Mimir-class floatplane carriers

On Trials

1x Bush-class minesweeper
- Buckthorn running trials until December 23

1x Mimir-class floatplane carrier
- Farbaute running trials until August 23

Ordered Units

2x Bush-class minesweeper (11 month á 53ts material necessary per unit)
- Blackthorn laid down in St. Helena on a Type 0 slip in July, completed in April 24
- Firethorn laid down in Port Louis on a Type 0 slip in August, completed in April 24

2x Guard-class patrol craft (11 month á 175ts material necessary per unit)
- Keeper laid down in Port Louis on a Type 2 slip in October, completed in August 23
- Watcher laid down in Durban on a Type 1 slip in July, completed in May 24

2x Pleiades-class light destroyer (10 month á 60ts material necessary per unit)
- Maia laid down in Buenos Aires on a Type 0 slip in January, completed October 23
- Merope laid down in Montevideo on a Type 0 slip in February, completed November 23

Refit

None


Destroyers

Completed Units

11x Bird-class torpedoboat
12x Cat-class torpedoboat
9x Hound-class torpedoboat

10x Nymph-class destroyer (Type 21)

On Trials

3x Hound-class torpedoboat
- Spaniel running trials until July 23
- Basset Fauve de Bretagne running trials until July 23
- Basset Hound running trials until August 23

Ordered Units

2x Nymph-class destroyer (Type 21 - 11 month á 129ts material necessary per unit)
- Euarne laid down in Majunga on a Type 1 slip in October, completed in August 23
- Eudora laid down in Port Louis on a Type 1 slip in November, completed in September 23

6x Nymph-class destroyer (Type 23 - 11 month á 127ts material necessary per unit)
- Galateia laid down in Mar del Plata on a Type 1 slip in January, completed in November 23
- Eukrante laid down in Daressalam on a Type 1 slip in February, completed in December 23
- Eulimene laid down in Douala on a Type 1 slip in February, completed in December 23
- Eupompe laid down in Buenos Aires on a Type 1 slip in February, completed in December 23
- Eunike laid down in Montevideo on a Type 1 slip in March, completed in January 24
- Galene laid down in St. Helena on a Type 1 slip in March, completed in January 24


Class B Cruisers

Completed Units

11x Insect-class torpedoboat
4x Nampula-class light cruiser
5x Pietermaritzburg-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser

On Trials

2x Rosario-class light cruiser
- Rosario running trials until December 23
- San Lorenzo running trials until November 23

Ordered Units

2x Rosario-class light cruiser (17 month á 457ts material necessary per unit)
- Koumba laid down in Port Elizabeth on a Type 2 slip in March 22, completed in July 23
- Belinga laid down in Daressalam on a Type 2 slip in October, completed in February 24


Class A Cruisers

Completed Units

1x Colony-class AC
2x General-class AC

Ordered Units

4x Cape-class armored cruiser (22 month á 573ts material necessary per unit)
- Cape Lopez laid down in Durban on a Type 3 slip in January 23, completed in October 24
- Cape Good Hope laid down in Cape Town on a Type 3 slip in February 23, completed in November 24
- Cape Corrientes laid down in Cape Town on a Type 3 slip in February 23, completed in November 24
- Cape Delgado laid down in Buenos Aires on a Type 3 slip in January, completed in October 24


Capital Units

Completed Units

1x Madagascar-class
2x Sao Tome-class
2x Hertog-class
4x King-class
2x Mauritius-class
2x South Africa-class

Ordered Units

2x Mocambique-class (768ts/month material necessary per unit)
- Mocambique building on a Type 4 slip in Durban until October 1923
- Rhodesia building on a Type 4 slip in Durban until July 1924

Refit

1x Hertog-class battlecruiser (18 month á 706ts material necessary per unit)
- Hertog Rijnard entering a Type 3 dock in Douala in August. Leaving the dock in March 24, the battlecruiser will stay in the yard until January 25


Coastal Defence Units

Completed Units

Nonce

Ordered Units

None


Carriers

Completed Units

1x Wim Kraash-class (converted freighter, rated as experimental)

Ordered Units

None


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

None


Class B Submarines

Completed Units

14x G-class submarine
15x I-class submarine
12x H-class submarine

Ordered Units


Non-combatants

Completed Units

14x Bay-class tender (several different designs)

Ordered Units

None


-------------------------------------------------------------------------------------------------------

At the beginning of this quarter the RSAN consists of (completed units only):

36 minesweepers
46 small patrol crafts
45 TB/DDs (does not include 11 TBs with 15cm guns)
42 cruisers category b (does include 11 TBs with 15cm guns)
3 cruisers category a
13 capital units
1 experimental carrier (conversion)
41 submarines category b
32 submarines category a
5 floatplane carriers
13 armed tenders

plus uncounted auxiliary vessels of all kind.

[Edit] Just noticed I used a name twice -> RSAN Sentinel -> fixed