[SIZE=3]SAE Quarterly Reports [/SIZE]
No. 11 – July to September 1923
Transfers:
None
Factories:
25 factories total can be used.
Fixed factories
5 factories will be fixed to produce infrastructure points for 1923.
Flexible factories
4ts material transferred from Q2
19,312s material necessary to be produced in this quarter (20 factories).
0 factory producing 0,0pts for infrastructure.
Infrastructure points used this quarter:
0,1pts put into a new factory (#26) for a total of 10pts at the end of Q3
0,4pts put into a new Type 1 Dock in Daressalam for a total of 0,6pts at the end of Q3
[SIZE=3]Ships: [/SIZE]
Minor vessels
Completed Units
13x Flower-class minesweeper
15x Tree-class minesweeper
7x Bush-class minesweeper
7x Planet-class sloops
11x Centaur-class sloops
4x Polar-class sloops
20x S-class sloops
4x Guard-class patrol crafts
3x Mimir-class floatplane carriers
On Trials
1x Bush-class minesweeper
- Buckthorn running trials until December 23
1x Mimir-class floatplane carrier
- Farbaute running trials until August 23
Ordered Units
2x Bush-class minesweeper (11 month á 53ts material necessary per unit)
- Blackthorn laid down in St. Helena on a Type 0 slip in July, completed in April 24
- Firethorn laid down in Port Louis on a Type 0 slip in August, completed in April 24
2x Guard-class patrol craft (11 month á 175ts material necessary per unit)
- Keeper laid down in Port Louis on a Type 2 slip in October, completed in August 23
- Watcher laid down in Durban on a Type 1 slip in July, completed in May 24
2x Pleiades-class light destroyer (10 month á 60ts material necessary per unit)
- Maia laid down in Buenos Aires on a Type 0 slip in January, completed October 23
- Merope laid down in Montevideo on a Type 0 slip in February, completed November 23
Refit
None
Destroyers
Completed Units
11x Bird-class torpedoboat
12x Cat-class torpedoboat
9x Hound-class torpedoboat
10x Nymph-class destroyer (Type 21)
On Trials
3x Hound-class torpedoboat
- Spaniel running trials until July 23
- Basset Fauve de Bretagne running trials until July 23
- Basset Hound running trials until August 23
Ordered Units
2x Nymph-class destroyer (Type 21 - 11 month á 129ts material necessary per unit)
- Euarne laid down in Majunga on a Type 1 slip in October, completed in August 23
- Eudora laid down in Port Louis on a Type 1 slip in November, completed in September 23
6x Nymph-class destroyer (Type 23 - 11 month á 127ts material necessary per unit)
- Galateia laid down in Mar del Plata on a Type 1 slip in January, completed in November 23
- Eukrante laid down in Daressalam on a Type 1 slip in February, completed in December 23
- Eulimene laid down in Douala on a Type 1 slip in February, completed in December 23
- Eupompe laid down in Buenos Aires on a Type 1 slip in February, completed in December 23
- Eunike laid down in Montevideo on a Type 1 slip in March, completed in January 24
- Galene laid down in St. Helena on a Type 1 slip in March, completed in January 24
Class B Cruisers
Completed Units
11x Insect-class torpedoboat
4x Nampula-class light cruiser
5x Pietermaritzburg-class light cruiser
6x Port Shepstone-class light cruiser
6x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
On Trials
2x Rosario-class light cruiser
- Rosario running trials until December 23
- San Lorenzo running trials until November 23
Ordered Units
2x Rosario-class light cruiser (17 month á 457ts material necessary per unit)
- Koumba laid down in Port Elizabeth on a Type 2 slip in March 22, completed in July 23
- Belinga laid down in Daressalam on a Type 2 slip in October, completed in February 24
Class A Cruisers
Completed Units
1x Colony-class AC
2x General-class AC
Ordered Units
4x Cape-class armored cruiser (22 month á 573ts material necessary per unit)
- Cape Lopez laid down in Durban on a Type 3 slip in January 23, completed in October 24
- Cape Good Hope laid down in Cape Town on a Type 3 slip in February 23, completed in November 24
- Cape Corrientes laid down in Cape Town on a Type 3 slip in February 23, completed in November 24
- Cape Delgado laid down in Buenos Aires on a Type 3 slip in January, completed in October 24
Capital Units
Completed Units
1x Madagascar-class
2x Sao Tome-class
2x Hertog-class
4x King-class
2x Mauritius-class
2x South Africa-class
Ordered Units
2x Mocambique-class (768ts/month material necessary per unit)
- Mocambique building on a Type 4 slip in Durban until October 1923
- Rhodesia building on a Type 4 slip in Durban until July 1924
Refit
1x Hertog-class battlecruiser (18 month á 706ts material necessary per unit)
- Hertog Rijnard entering a Type 3 dock in Douala in August. Leaving the dock in March 24, the battlecruiser will stay in the yard until January 25
Coastal Defence Units
Completed Units
Nonce
Ordered Units
None
Carriers
Completed Units
1x Wim Kraash-class (converted freighter, rated as experimental)
Ordered Units
None
Class A Submarines
Completed Units
12x E-class submarine
16x F-class submarine
4x J-class submarine
Ordered Units
None
Class B Submarines
Completed Units
14x G-class submarine
15x I-class submarine
12x H-class submarine
Ordered Units
Non-combatants
Completed Units
14x Bay-class tender (several different designs)
Ordered Units
None
-------------------------------------------------------------------------------------------------------
At the beginning of this quarter the RSAN consists of (completed units only):
36 minesweepers
46 small patrol crafts
45 TB/DDs (does not include 11 TBs with 15cm guns)
42 cruisers category b (does include 11 TBs with 15cm guns)
3 cruisers category a
13 capital units
1 experimental carrier (conversion)
41 submarines category b
32 submarines category a
5 floatplane carriers
13 armed tenders
plus uncounted auxiliary vessels of all kind.
[Edit] Just noticed I used a name twice -> RSAN Sentinel -> fixed