You are not logged in.

1

Wednesday, April 6th 2011, 11:24pm

Bharat Q4/1940

BNS
1940 Fourth Quarter Report


A. Factories

10/11 factories = 10000t of material + 1676t transferred + 2519t stockpile = 14195t available
13184t are used, leaving a stockpile of 1011t

1/11 factories (committed) = 0.1 infrastructure pts available + 0.1 IP bonus.
0/11 factories (flexible) = 0.0 infrastructure pts available

B. Infrastructure Development

None

C. Naval Development and Construction

At Mumbai:
S3: Samanjir laid down Jan 1940, receives 2144t, balance 18451t, completion Feb 1943.
D3: idle
S2: being expanded to a 2.5 type slip, 0.2IP used, 0.0IP needed to complete. Completed.
S1: DD Balia laid down Oct 1940, receives 400t, balance 1186t, completion Sep 1941.
S1: DD Malout laid down Oct 1940, receives 400t, balance 1186t, completion Sep 1941.
Free Floating:
DD Bareilly laid down Dec 1939, launched Jun 1940, receives 0t, balance 0t, completion Nov 1940.
DD Meerut laid down Dec 1939, launched Jun 1940, receives 0t, balance 0t, completion Nov 1940.

At Male:
D3: CA Chapra laid down Oct 1940, receives 1608t, balance 11235t, completion Aug 1942.
D1: idle
Free Floating:
Bangalore laid down Jan 1939, launched Jun 1940, receives 1651t, balance 0t, completion Apr 1941.

At Diego Garcia:
S1: DD Dabra laid down Dec 1940, receives 400t, balance 1186t, completion Nov 1941.
D1: idle
Free Floating:
DD Arcot laid down Feb 1940, launched Sep 1940, receives 386t, balance 0t, completion Jan 1941.

At Trincomalee:
D2: idle
S1: DD Coonoor laid down Oct 1940, receives 400t, balance 1186t, completion Sep 1941.
S1: DD Dadra laid down Dec 1940, receives 400t, balance 1186t, completion Nov 1941.
S0: idle
Free Floating:
DD Churu laid down Dec 1939, launched Jun 1940, receives 0t, balance 0t, completion Nov 1940.
DD Araria laid down Feb 1940, launched Sep 1940, receives 386t, balance 0t, completion Jan 1941.
Hejdazi M-1 laid down Jul 1940, launched Nov 1940, receives 119t, balance 0t, completion Jan 1941

At Chennai:
S3: CA Chiplun laid down Oct 1940, receives 1608t, balance 11235t, completion Aug 1942.
S2: idle
S1: DD Gaya laid down Oct 1940, receives 400t, balance 1186t, completion Sep 1941.
D4: Persian CVL Oqab laid down Jul 1940, receives 1192t, balance 4765t, completion Dec 1941.
D3: idle
Free Floating:
AC Hyderabad, laid down Oct 1938, launched Feb 1940, receives 0t, balance 0t, completion Jan 1941.
DD Ghaziabad laid down Dec 1939, launched Jun 1940, receives 0t, balance 0t, completion Nov 1940.


At Sittwe:
S1: DD Datia laid down Dec 1940, receives 400t, balance 1186t, completion Nov 1941.
S0: idle
D1: DD Dewas laid down Dec 1940, receives 400t, balance 1186t, completion Nov 1941.
Free Floating:
DD Rae Bareli laid down Feb 1940, launched Sep 1940, receives 386t, balance 0t, completion Jan 1941.
DD Arrah laid down Feb 1940, launched Sep 1940, receives 386t, balance 0t, completion Jan 1941.
Hejdazi M-2 laid down Jul 1940, launched Nov 1940, receives 119t, balance 0t, completion Jan 1941

At As Salif:
S0: idle.

D. Transactions:

1300t transferred from Persia for CVL Oqab

376t transferred from Hedjaz

E. Other notes:

Ramayana laid down Oct 1939 by civilian shipping company, completion Feb 1942
Mahabharata laid down Oct 1939 by civilian shipping company, completion Feb 1942
Sikkim, laid down Jan 1940 by civilian shipping company, completion Jul 1941
Nepal, laid down Jan 1940 by civilian shipping company, completion Jul 1941
Bhutan, laid down Jan1940 by civilian shipping company, completion Jul 1941
Punjab, laid down Jan 1940 by civilian shipping company, completion Jul 1941
Andaman, laid down Jan 1940 by civilian shipping company, completion Aug 1941
Diego Garcia, laid down Jan 1940 by civilian shipping company, completion Aug 1941
Maldives, laid down Jan 1940 by civilian shipping company, completion Aug 1941

F. Scrap Report:

None

G. Updated Order of Battle, 01/01/41
Note: Y) +Z= completed (under repair/refit) + under construction

Major Warships

Battleships (BB): 3(0) + 1
Aircraft Carriers (CV): 3(0) + 0
Aircraft Carriers, Light (CVL): 2(0) + 0
Armored Cruisers (AC): 2(0) + 2
Cruisers (CL): 20(0) + 2
Destroyers (DD): 43(0) + 12
Torpedo Boats (TB): 3(0) + 0
Submarines (SS): 29(0) + 0
Monitors (BM): 2(0) + 0

Patrol and Escort Ships

Seaplane Carriers (CVS): 2(0) + 0
Frigates (PF): 4(0) + 0
Paratraatii (PP): 30(0) + 0
Charavaahii (PC): 15(0) + 0
Survey Ships (PS): 1(0) + 0
Daakuui (D): 8(0) + 0

Coastal Forces

Motor Torpedo Boats (MTB/MGB): 76(0) + 0
ASW Launches (ASL): 57(0) + 0
Harbour Patrol Craft (PH): 7(0) + 0

Mine Warfare

Minelayers (CM): 18(0) + 0
Minesweepers (AM): 18(0) + 0

Fleet Train

Oilers (AO): 3(0) + 0
Tenders (AT): 11(0) + 0
Repair Ships (AR): 1(0) + 0
Hospital Ships (AH): 1(0) + 0
Harbour Defense Vessels (AN): 5(0) + 0
Ocean-going Tugs (AU): 2(0) +0
Aviation Maintenance Ships (AV): 1(0) + 0

Amphibious Assault Ships:
Landing Ship, Command (LSC): 1(0) + 0
Landing Ship, Infantry (LSI): 4(0) + 0
Landing Craft, Vehicle (LCV): 9(0) + 0
Armed Transport (APD): 4(0) + 0
Landing Craft, Vehicle/Personnel (LCVP): 104(0) + 0
Landing Ship, Tank (LST): 3(0) + 0

2

Wednesday, April 6th 2011, 11:30pm

Hedjaz Q4/1940

Hedjaz Q4 1940

Industrial Allocation
0.5 factories allocated to building warship material
0.0 factory allocated to production of infrastructure materials for
500Tons + 0 tons Stockpiled, 500Tons used, 0Tons Stockpiled

Jiddah
D1:idle
Free Floating:
GB Hussein starts refit Jun 1940, launched Sep 1940, 0t used, 0t remaining, completion Dec 1940

At As Salif (shared with Bharat)
S0: idle
Free Floating:

Built in factories

2 Coastal launches x 62= 124 t

Transactions

376t to Bharat for two minelayers. 2nd payment of two

Other points of interest

Trials


Updated Order of Battle, End of Dec 1940

Completed (Under Repair or Refit) + Under Construction

Destroyers: 2(0) + 0
Gun Boats: 1(0) + 0
Submarines: 3(0) + 0
MTB: 20(0) + 0
SC: 6(0) + 0
ML: 0(0) + 2

This post has been edited 1 times, last edit by "perdedor99" (Apr 6th 2011, 11:30pm)