You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Sunday, January 16th 2011, 9:51pm

Quarterly Report #77 for the SAE

[SIZE=3]SAE Quarterly Reports[/SIZE]
No. 77 – January to March 1940


[SIZE=3]Transfers/Notes:[/SIZE]

None


[SIZE=3]Factories:[/SIZE]
26 factories total can be used.

Fixed factories
3 factories will be fixed to produce infrastructure points for 1940.

Flexible factories
1302ts material transferred from Q4 (incl. material recovered from scrap yard).

22,511ts of material need to be produced in this quarter (23 factories).

0 factory producing 0,0pts of infrastructure.

Infrastructure points used this quarter:

0,3pts put into factory #27 for a total of 7,1pts at the end of Q1/40.


[SIZE=3]Ships:[/SIZE]
Minor vessels

Completed Units

34x UJ26-class ASW launch
31x UJ30-class ASW launch
24x UJ35-class ASW launch

36x R28-class motor launch
23x R31-class motor launch
8x R37-class motor launch

26x S34-class motor torpedo boat
12x S36-class motor torpedo boat

8x Tree-class minesweeper (Type 16)
10x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
12x Coastal-class minesweeper (Type 37)
4x Seychelles-class minesweeper (Type 38)

4x Circe-class sloops
4x Polar II-class sloops

12x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)

8x Planet-class light destroyer (Type 29)
8x Bird-class light destroyer (Type 35)

5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter

4x GB35-class river gun boat
2x General-class river gun boat
2x RM36A-class river monitors

On Trials

2x MS38-class mine sweeper
- MS38- 7 Chauve running trials until March 40
- MS38-3 La Dique running trials until March 40

1x Bush-class minesweeper
- Buckthorn running trials until May 40

Ordered Units

2x MS38-class mine sweeper (5 month á 100ts material necessary per unit)
- MS38-8 Aride laid down in Buenos Aires on a Type 0 slip in October 39, completed in February 40
- MS38-4 Cerf laid down in St. Helena on a Type 0 slip in October 39, completed in February 40

Rebuilds/Refits/Repairs

2x Bush-class minesweeper (2 month á 40ts material necessary per unit)
- Firethorn entering a Type 0 dock in Douala in December. Leaving the dock in December 39, the minesweeper will stay in the yard until January 40
- Blackthorn entering a Type 0 dock in Douala in February. Leaving the dock in February 40, the minesweeper will stay in the yard until March 40

Scrapping

None


Destroyers

Completed Units

10x Hound-class torpedoboat (Type 26)
8x Reptile-class torpedoboat (Type 35)

2x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
4x Fish-class destroyer (Type 38)

8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
2x Weapon-class large destroyer (Type 36)

On Trials

3x Fish-class destroyer
- DD38B-3 Albacore running trials until February 40
- DD38B-6 Barracuda running trials until May 40
- DD38B-7 Trout running trials until May 40

4x DD21-class destroyer
- Amphitrite running trials until January 40
- Doris running trials until January 40
- Erato running trials until February 40
- Eudora running trials until February 40

2x Weapon-class large destroyer
- DL36-4 Catapult running trials until February 40
- DL36-3 Ballista running trials until April 40

Ordered Units

1x Fish-class destroyer (11 month á 143ts material necessary per unit)
- DD38B-8 Mackerel laid down in Daressalam on a Type 2 slip in October 39, completed in July 40

Rebuilds/Refits/Repairs

2x DD21-class destroyer (5 month á 68ts material necessary per unit)
- Doto entering a Type 1 dock in Douala in November. Leaving the dock in December 39, the destroyer will stay in the yard until March 40
- Euarne entering a Type 1 dock in Libreville in December. Leaving the dock in January 40, the destroyer will stay in the yard until April 40

Scrapping

None


Class B Cruisers
Completed Units

5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
2x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
2x Nampula II-class light cruiser (Type 36)

2x Daphne-class anti aircraft cruiser (Type 34)
2x Danae-class anti aircraft cruiser (Type 36)

4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)

1x Lightning-class mine cruiser
1x Hedgehog-class mine cruiser

On Trials

2x CL38A-class light cruiser
- Charybdis running trials until February 40
- Hydra running trials until March 40

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Class A Cruisers
Completed Units

2x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
2x Hero-class (Type 33)

2x Radiance-class
1x Vengeance-class

On Trials

None

Ordered Units

1x CA36E-class heavy cruiser (24 month á 624ts material necessary per unit)
- CA36E-2 Revenge laid down in Montevideo on a Type 4 slip in December 38, completed in November 40

1x CA23-class heavy cruiser
- Good Hope running trials until May 40

Repair/Refits

1x CA23-class heavy cruiser (6 month and 526ts of material necessary)
- Good Lopez entering a Type 3 dock in Durban in January. Leaving the dock in March 40, the cruiser will stay in the yard until June 40

Scrapping

None


Capital Units
Completed Units

1x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
2x Monarch-class

On Trials

None

Ordered Units

2x BB37A-III-class battleship (57 month á 838ts material necessary per unit)
- Thunderer laid down in Durban on a Type 4 slip in June 37, completed in February 42
- Superb laid down in Montevideo on a Type 4 slip in September 37, completed in May 42

2x BB37A-IV-class battleship (57 month á 835ts material necessary per unit)
- Implacable laid down in Durban on a Type 4 slip in April 38, completed in December 42
- Indomitable laid down in Port Elizabeth on a Type 4 slip in November 38, completed in July 43

Rebuilds/Refits

1x Mauritius-class battleship (19 month and 762ts of material necessary)
- Reunion entering a Type 3 dock in Buenos Aires in August 39. Leaving the dock in February 40, the battleship will stay in the yard until February 41

Scrapping

None


Coastal Defence Units
Completed Units

1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
1x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship

1x LCDS-class
2x LCDS-2-class

On Trials

None

Ordered Units

None

Rebuilds/Refits

None


Carriers

Completed Units

1x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)

2x Anvil-class light fleet carrier (Type 30)
1x Endress-class light fleet carrier (Type 36)

1x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
2x Unicorn-class floatplane carrier

On Trials

1x AV36-class floatplane carrier
- Gargoyle running trials until February 40

Ordered Units

1x CV37C-class fleet carrier (36 month á 750ts material necessary per unit)
- Asgard laid down in Buenos Aires on a Type 4 slip in August 37, completed in July 40

2x AV39-class floatplane carrier (1 month á 432ts material necessary per unit)
- Wyvern laid down in Daressalam on a Type 2 slip in December 39, completed in March 41
- Chimera laid down in Montevideo on a Type 2 slip in October 39, completed in January 41

Rebuilds/Refits

None


Class A Submarines
Completed Units

8x F-class submarine
3x J-class submarine
2x L-class submarine
8x M-class submarine

On Trials

1x O-class fleet submarine
- O5 running trials until May 40

Ordered Units

4x O-class fleet submarine (11 month á 107ts material necessary per unit)
- O7 laid down in Prince Eduard Islands on a Type 0 slip in July 39, completed in May 40
- O3 laid down in Majunga on a Type 1 slip in July 39, completed in May 40
- O1 laid down in Port Louis on a Type 0 slip in July 39, completed in May 40
- O6 laid down in Douala on a Type 0 slip in December 39, completed in October 40

Repairs/Rebuilds/Refits

None

Scrapping

3x F-class submarine (4 month total, 1 month in Type 1 dock)
- F2 scrapping in Durban starting in May, finished in August 39 – 120ts received from hull for Q1/1940
- F3 scrapping in Durban starting in September, finished in December 39 – 120ts received from hull for Q2/1940
- F7 scrapping in Durban starting in Januar, finished in April 40 – 120ts received from hull for Q4/1940


Class B Submarines
Completed Units

3x H-class submarine
13x K-class submarine
8x N-class submarine

On Trials

None

Ordered Units

1x P-class coastal mine submarine (5 month á 100ts material necessary per unit)
- P1 laid down in Cape Town on a Type 0 slip in February 40, completed in June 40

Repairs/Rebuilds/Refits

None

Scrapping

2x I-class coastal submarine (4 month total, 1 month in Type 0 dock)
- I8 scrapping in Libreville starting in May, finished in August 39 – 60ts received from hull for Q1/1940
- I9 scrapping in Libreville starting in September, finished in December 39 – 60ts received from hull for Q2/1940

3x H-class coastal submarine (4 month total, 1 month in Type 0 dock)
- H2 scrapping in Douala starting in May, finished in August 39 – 60ts received from hull for Q1/1940
- H5 scrapping in Douala starting in September, finished in December 39 – 60ts received from hull for Q2/1940
- H8 scrapping in Douala starting in January, finished in April 40 – 60ts received from hull for Q4/1940


Landing Vehicles
Completed Units

1x Farbaute-class landing ship (Type LSC 38, ex-AV22)
2x LSA38-class landing ship
5x LSI38-class landing ship

On Trials

3x LSI38-class landing ship
- LSI38-6 running trials until February 40
- LSI38-7 running trials until April 40
- LSI38-8 running trials until June 40

4x LST38-class landing ship
- LST38-1 running trials until January 40
- LST38-2 running trials until March 40
- LST38-3 running trials until April 40
- LST38-4 running trials until June 40

1x LSC39-class landing ship
- Lüderitz Bay running trials until March 40

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Non-combatants
Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)

1x FV32-class fleet support ship
2x FV36-class fleet support ship

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

1x TD19-class tender (5 month and 52ts of material necessary, refit into landing ship)
- Mossel Bay entering a Type 1 dock in Port Elizabeth in January. Leaving the dock in February 40, the tender will stay in the yard until May 40


--------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

89 ASW launches
67 motor launches
38 motor torpedo boats
52 minesweepers
46 small patrol crafts
6 river gunboat
2 river monitors
89 TB/DD/DLs of less than 2,000ts
43 cruisers category b
10 cruisers category a
13 capital units
7 costal defence ships
6 aircraft carrier
5 floatplane carrier
21 submarines category a
24 submarines category b
8 landing vehicles
18 armed tenders
3 fleet support ship

plus numerous auxiliary vessels of all kind.