Q4/1939
Industrial Allocation
- 4/4 factories producing 4000t materials.
- 411t from stockpile.
- 4411t materials total.
- 3934t used.
- 477t stored for Q1/40.
Infrastructure Development
-
Naval Construction
at Callao:
Type 2.5 slip: idle
Type 1 slip: Destroyer Puno laid down in Q4/1939. 987 tons required. 300 tons added in Q4/1939, total added is 300 / 987 tons.
Type 1 slip: Destroyer Capitan Aguierre laid down in Q4/1939. 1869 tons required. 510 tons added in Q4/1939, total added is 510 / 1869 tons.
Type 2 slip: Destroyer Confederación laid down in Q3/1939. 2439 tons required. 650 tons added in Q4/1939, total added is 1300 / 2439 tons. Launched.
Type 0 slip: idle
Type 0 slip: Submarine SC-8 laid down in Q4/1939. 414 tons required. 414 tons added in Q4/1939. Launched.
Type 0 slip: idle
Type 3 drydock: idle
Type 1 drydock: idle
Type 1 drydock: idle
Dockside: Heavy cruiser Callao laid down in Q3/1938. 10,873 tons required (minus 360 tons for reusing 2x3 8" turrets from previous Callao). 513 tons added in Q4/1939, total added is 10,513 / 10,513 tons.
at Mollendo:
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 drydock: idle
from factories:
N/A
Dockside:
Transactions
- 1547 tons to Germany for Quito.
Other Notes
CL Quechua completed in Germany. Delivery to Peru in March 1940.
Order of Battle (Peruvian Navy) end of Q4 1939
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Battleships:...........................3(0)0
Heavy/Armoured Cruisers:.....1(0)1
Cruisers:..............................5(0)1
Destroyers:..........................25(0)3
River Gunboats:....................0(0)0
Submarines:.........................7(0)1
Mine sweepers:....................3(0)0
Subchasers:.........................6(0)0