Q1/1939
Industrial Allocation
- 4/4 factories producing 4000t materials.
- 1,794t from stockpile.
- 805 tons from scrapping
- 250 tons from transactions
- 6,849t materials total.
- 5,421t used.
- 1428t stored for Q2/39.
Infrastructure Development
-
Naval Construction
at Callao:
Type 2.5 slip: Heavy cruiser Callao laid down in Q3/1938. 10,873 tons required (minus 360 tons for reusing 2x3 8" turrets from previous Callao. 2,000 tons added in Q1/1939, total added is 6,000 / 10,513 tons.
Type 1 slip: idle
Type 1 slip: idle
Type 2 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: Chinese lightship laid down. 250 tons added. 212 tons remaining.
Type 3 drydock: idle
Type 1 drydock: idle
Type 1 drydock: idle
at Mollendo:
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 drydock: idle
from factories:
N/A
Dockside:
Transactions
- 1,624 tons to Germany for Quechua.
- 1547 tons to Germany for Quito.
- 250 tons from China for Lightship
Other Notes
2x3 8" turrets and 4x2 8" turrets removed from armoured cruiser Callao; being prepared for re-use. Triple turrets will be reused on Heavy Cruiser Callao; twin turrets will be used in coast defense mountings.
Order of Battle (Peruvian Navy) end of Q1 1939
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Battleships:...........................3(0)0
Heavy/Armoured Cruisers:.....1(0)1
Cruisers:..............................4(0)2
Destroyers:..........................25(0)0
River Gunboats:....................0(0)0
Submarines:.........................7(0)0
Mine sweepers:....................3(0)0
Subchasers:.........................6(0)0