You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Wednesday, March 3rd 2010, 10:16pm

Quarterly Report #72 for the SAE

[SIZE=4]SAE Quarterly Reports[/SIZE]

No. 72 – October to December 1938


[SIZE=3]Transfers/Notes:[/SIZE]


Fifth payment from Azerbaijan (267ts) for purchase of several torpedo boats
Forth payment from China (400ts) for purchase of several submarines
Second payment from Australia (2000ts) for purchase of several light cruisers
Second payment from Mexico (300ts) for purchase of several light destroyers


[SIZE=3]Factories:[/SIZE]

26 factories total can be used.

Fixed factories

3 factories will be fixed to produce infrastructure points for 1938.

Flexible factories

582ts material transferred from Q3 (incl. material recovered from scrap yard).

22,829ts of material need to be produced in this quarter (23 factories).

Infrastructure points used this quarter:

0,6pts put into factory #27 for a total of 5,7pts at the end of Q4/38.


[SIZE=3]Ships:[/SIZE]

Minor vessels


Completed Units

34x UJ26-class ASW launch
31x UJ30-class ASW launch
24x UJ35-class ASW launch

36x R28-class motor launch
23x R31-class motor launch
8x R37-class motor launch

26x S34-class motor torpedo boat
12x S36-class motor torpedo boat

8x Tree-class minesweeper (Type 16)
13x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
12x Coastal-class minesweeper (Type 37)

4x Circe-class sloops
4x Polar II-class sloops

12x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)

8x Planet-class light destroyer
8x Bird-class light destroyer

5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter

4x GB35-class river gun boat
2x General-class river gun boat
2x RM36A-class river monitors

On Trials

6x Chilean LD35-class light destroyer
- Chilean LD35-1 running trials until October 38
- Chilean LD35-2 running trials until October 38
- Chilean LD35-3 running trials until November 38
- Chilean LD35-4 running trials until January 39
- Chilean LD35-5 running trials until February 39
- Chilean LD35-6 running trials until February 39

Ordered Units

2x Chilean LD35-class light destroyer (10 month á 71ts material necessary per unit)
- Chilean LD35-7 laid down in Majunga on a Type 1 slip in January 38, completed in October 38
- Chilean LD35-8 laid down in Cape Town on a Type 1 slip in January 38, completed in October 38

4x MS38-class mine sweeper (5 month á 100ts material necessary per unit)
- MS38-1 Mahé laid down in St. Helena on a Type 0 slip in July 38, completed in November 38
- MS38-5 Ste. Anne laid down in Buenos Aires on a Type 0 slip in July 38, completed in November 38
- MS38-6 Silhouette laid down in Buenos Aires on a Type 0 slip in December 38, completed in April 39
- MS38-2 Praslin laid down in St. Helena on a Type 0 slip in December 38, completed in April 39

Rebuilds/Refits/Repairs

None

Scrapping

None


Destroyers

Completed Units

10x Hound-class torpedoboat (Type 26)
8x Reptile-class torpedoboat (Type 35)

8x Nymph-class destroyer (Type 21)
3x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)

8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
2x Weapon-class large destroyer (Type 36)

On Trials

3x DD23-class destroyer
- Hippothoe running trials until November 38
- Eunike running trials until November 38
- Hipponoe running trials until November 38

Ordered Units

5x Fish-class destroyer (11 month á 143ts material necessary per unit)
- DD38B-1 Shark laid down in Port Louis on a Type 1 slip in January 38, completed in October 38
- DD38B-5 Pike laid down in Port Elizabeth on a Type 1 slip in April 38, completed in January 39
- DD38B-4 Perch laid down in Daressalam on a Type 1 slip in May 38, completed in February 39
- DD38B-2 Piranha laid down in Douala on a Type 1 slip in May 38, completed in February 39
- DD38B-3 Albacore laid down in Port Louis on a Type 1 slip in November 38, completed in August 39

2x Weapon-class large destroyer (11 month á 174ts material necessary per unit)
- DL36-3 Ballista laid down in Durban on a Type 2 slip in December 38, completed in October 39
- DL36-4 Catapult laid down in Daressalam on a Type 2 slip in October 38, completed in August 39

Rebuilds/Refits/Repairs

2x DD23-class destroyer (5 month á 69ts/month material necessary per unit)
- Halimene entering a Type 1 dock in Durban in June. Leaving the dock in July, the destroyer will stay in the yard until October 38
- Glaukonome entering a Type 1 dock in St. Helena in June. Leaving the dock in July, the destroyer will stay in the yard until October 38

Scrapping

None


Class B Cruisers

Completed Units

1x Nampula-class light cruiser (Type 08)
4x Port Shepstone-class light cruiser (Type 13)
5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
2x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)

2x Daphne-class anti aircraft cruiser (Type 34)
1x Danae-class anti aircraft cruiser (Type 36)

4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)

1x Lightning-class mine cruiser

On Trials

1x Danae-class anti aircraft cruiser
- Dido running trials until January 39

1x CLAA36-class anti aircraft cruiser
- CLAA38-China running trials until November 38

1x MSA-class mine cruiser (13 month á 301ts material necessary per unit)
- MSA Hedgehog running trials until February 39

Ordered Units

2x CL36EB-class light cruiser (17 month á 465ts material necessary per unit)
- Nampula II laid down in Cape Town on a Type 3 slip in October 37, completed in February 39
- Oudtshoorn II laid down in Cape Town on a Type 3 slip in January 38, completed in May 39

2x CL38A-class light cruiser (17 month á 470ts material necessary per unit)
- Charybdis laid down in Cape Town on a Type 2 slip in April 38, completed in August 39
- Hydra laid down in Port Louis on a Type 2 slip in April 38, completed in August 39

Repairs/Rebuilds/Refits

None

Scrapping

1x Nampula-class light cruiser (6 month total, 3 month in Type 2 dock)
- Kimberley scrapping in Durban starting in July, finished in December 38 – 594ts received from hull for Q3/1939


Class A Cruisers

Completed Units

4x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
2x Hero-class (Type 33)

2x Radiance-class

On Trials

1x CA36E-class heavy cruiser
- CA36E-1 Vengeance running trials until March 39

Ordered Units

1x CA36E-class heavy cruiser (24 month á 624ts material necessary per unit)
- CA36E-2 Revenge laid down in Montevideo on a Type 4 slip in December 38, completed in November 40

Repair/Refits

None

Scrapping

1x Colony-class AC (7 month total, 3 month in Type 3 dock)
- Argentina scrapping in Durban starting in May, finished in November 38 – 1456ts received from hull for Q3/1939


Capital Units

Completed Units

1x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
1x Monarch-class

On Trials

1x BB33Lh-class battleship
- Sovereign running trials until March 39

Ordered Units

2x BB37A-III-class battleship (57 month á 838ts material necessary per unit)
- Thunderer laid down in Durban on a Type 4 slip in June 37, completed in February 42
- Superb laid down in Montevideo on a Type 4 slip in September 37, completed in May 42

2x BB37A-IV-class battleship (57 month á 835ts material necessary per unit)
- Implacable laid down in Durban on a Type 4 slip in April 38, completed in December 42
- Indomitable laid down in Port Elizabeth on a Type 4 slip in November 38, completed in July 43

Rebuilds/Refits

1x Mauritius-class battleship (19 month and 14484ts of material necessary)
- Mauritius entering a Type 3 dock in Buenos Aires in October. Leaving the dock in May 38, the battleship will stay in the yard until April 39

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
1x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship

1x LCDS-class
2x LCDS-2-class

On Trials

None

Ordered Units

None

Rebuilds/Refits

None


Carriers

Completed Units

1x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)

2x Anvil-class light fleet carrier (Type 30)

1x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
1x Unicorn-class floatplane carrier

On Trials

1x AV36-class floatplane carrier
- Gryphon running trials until October 38

1x CVL36-class light fleet carrier
- Michel Endress running trials until February 39

Ordered Units

1x CV37C-class fleet carrier (36 month á 750ts material necessary per unit)
- Asgard laid down in Buenos Aires on a Type 4 slip in August 37, completed in July 40

1x AV36-class floatplane carrier (16 month á 387ts material necessary per unit)
- Gargoyle laid down in Montevideo on a Type 2 slip in May 38, completed in August 39

Rebuilds/Refits

None


Class A Submarines

Completed Units

5x E-class submarine
13x F-class submarine
1x J-class submarine
2x L-class submarine
6x M-class submarine

On Trials

None

Ordered Units

2x M-class fleet submarine (11 month á 99ts material necessary per unit)
- M7 laid down in Durban on a Type 0 slip in January 38, completed in November 38
- M8 laid down in Durban on a Type 0 slip in February 38, completed in December 38

Repairs/Rebuilds/Refits

2x J-class submarine (1 month and 150ts of material necessary)
- J2 entering the navy yard in Montevideo for one month in October 38 for life extension
- J4 entering the navy yard in Montevideo for one month in December 38 for life extension


Class B Submarines

Completed Units

3x I-class submarine
7x H-class submarine
13x K-class submarine
3x N-class submarine

On Trials

3x N-class coastal submarine
- N4 running trials until October 38
- N7 running trials until November 38
- N5 running trials until March 39

Ordered Units

2x N-class coastal submarine (5 month á 95ts necessary per unit)
- N8 laid down in Douala on a Type 0 slip in July 38, completed in November 38
- N6 laid down on Prince Eduard Islands on a Type 0 slip in October 38, completed in February 39

Repairs/Rebuilds/Refits

None

Scrapping

4x I-class coastal submarine (4 month total, 1 month in Type 0 dock)
- I5 scrapping in Douala starting in May, finished in August 38 – 60ts received from hull for Q4/1938
- I2 scrapping in Libreville starting in May, finished in August 38 – 60ts received from hull for Q4/1938
- I5 scrapping in Douala starting in September, finished in December 38 – 60ts received from hull for Q3/1939
- I3 scrapping in Libreville starting in September, finished in December 38 – 60ts received from hull for Q3/1939


Landing Ships

Completed Units

None

On Trials

None

Ordered Units

2x LSA38-class coastal submarine (5 month á 82ts necessary per unit)
- LSA38-1 laid down in Daressalam on a Type 0 dock in July 38, completed in November 38
- LSA38-2 laid down in Daressalam on a Type 0 slip in July 38, completed in November 38

2x LSI38-class motor launch (1 month á 101ts material necessary per unit)
- LSI38-1 laid down in Daressalam in October, completed in October 38
- LSI38-2 laid down in Daressalam in December, completed in December 38

Repairs/Rebuilds/Refits

1x Farbaute-class landing ship (ex-AV22) (3 month and 99ts of material necessary)
- Farbaute entering the navy yard in Daressalam for life extension and refit as LSC38 in October 38, completed in December 38

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
2x Bay-class tender (Type 19)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)

1x FV32-class fleet support ship
1x FV36-class fleet support ship

On Trials

1x FV36-class fleet support ship
- FV36-1 Tarja Turunen running trials until October 38

Ordered Units

None

Repairs/Rebuilds/Refits

None

-----------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

89 ASW launches
67 motor launches
38 motor torpedo boats
51 minesweepers
46 small patrol crafts
6 river gunboat
2 river monitors
86 TB/DD/DLs of less than 2,000ts
43 cruisers category b
11 cruisers category a
12 capital units
7 costal defence ships
5 aircraft carrier
4 floatplane carrier
26 submarines category b
27 submarines category a
0 landing ships
20 armed tenders
2 fleet support ship

plus numerous auxiliary vessels of all kind.

2

Thursday, March 4th 2010, 12:17am

RE: Quarterly Report #72 for the SAE

Quoted

Originally posted by HoOmAn
[SIZE=4]SAE Quarterly Reports[/SIZE]

No. 72 – October to December 1938


[SIZE=3]Transfers/Notes:[/SIZE]


Fifth payment from Azerbaijan (267ts) for purchase of several torpedo boats
Forth payment from China (400ts) for purchase of several submarines
Second payment from Australia (2000ts) for purchase of several light cruisers
Second payment from Mexico (300ts) for purchase of several light destroyers

.



Business is booming for the Empire. :D

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

3

Thursday, March 4th 2010, 7:24am

Well, yes. For some time focus on business earnt me some money. :o)

4

Thursday, March 4th 2010, 10:19am

RE: Quarterly Report #72 for the SAE

Quoted

Originally posted by HoOmAn
[SIZE=4]SAE Quarterly Reports[/SIZE]

No. 72 – October to December 1938

.......

[B]Landing Ships


Completed Units

None

On Trials

None

Ordered Units

2x LSA38-class coastal submarine (5 month á 82ts necessary per unit)
- LSA38-1 laid down in Daressalam on a Type 0 dock in July 38, completed in November 38
- LSA38-2 laid down in Daressalam on a Type 0 slip in July 38, completed in November 38

2x LSI38-class motor launch (1 month á 101ts material necessary per unit)
- LSI38-1 laid down in Daressalam in October, completed in October 38
- LSI38-2 laid down in Daressalam in December, completed in December 38

Repairs/Rebuilds/Refits

1x Farbaute-class landing ship (ex-AV22) (3 month and 99ts of material necessary)
- Farbaute entering the navy yard in Daressalam for life extension and refit as LSC38 in October 38, completed in December 38



I think there is a small fault, because your ency said :

Farbaute , laid down 1922, sunk 11-02-36 (gunfire, torpedo)

I think you haven't lifted the ship, or ? ;)

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

5

Thursday, March 4th 2010, 11:50am

It´s so cool! Actually somebody´s ready my reports. :o)

In fact you´re right, there is an error which I just corrected. It was the RSAN Gymir, sistership to the Farbaute, that was sunk (see http://wesworld.jk-clan.de/thread.php?threadid=7460&sid=). I had it correct in my own lists but somehow mixed it in the SAE folder of this board.

Thanks for your help.