You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, March 3rd 2010, 3:27pm

Peru Q1/1938 and Q2/1938

Peru Q1/1938 and Q2/1938



Zitat:
Industrial Allocation
- 4/4 factories producing 4000t materials.
- 1,689t from stockpile.
- 0.2 IP from Iberia
- 5,689t materials total.
- 5,191t used.
- 498t stored for Q2/38.

Infrastructure Development
.5 IP from 1938 upgrades Callao S2 to S2.5.

Naval Construction
at Callao:
Type 2.5 slip: idle
Type 1 slip: idle
Type 1 slip: idle
Type 2 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 3 drydock: Cruiser Callao scrapping. 7 3/8ths months required for scrapping. 805 tons removed for recycling (tonnage will be available in Q4/3
Type 1 drydock: idle
Type 1 drydock: idle


at Mollendo:
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 drydock: idle

from factories:
N/A

Dockside:
CA Almirante Grau repairing from Peruvian War damage. 1,576 tons to repair ship to 100% status.

Transactions
- 1991 tons to India for Almirante Villar
- 1,624 tons to Germany for Quechua.

Other Notes
2x3 8" turrets and 4x2 8" turrets removed from armoured cruiser Callao; being prepared for re-use.

Order of Battle (Peruvian Navy) end of Q1 1938
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Battleships:...........................2(0)1
Heavy/Armoured Cruisers:.....1(0)0-1
Cruisers:..............................4(0)1
Destroyers:..........................25(0)0
River Gunboats:....................0(0)0
Submarines:.........................7(0)0
Mine sweepers:....................3(0)0
Subchasers:.........................6(0)0

Summary

There was a little war that resulted in damage to the following units:
- ACR Callao: 55% (Heavy Damage). 5839 tons to fully repair
- CA Grau: 89% (Light Damage). 1576 tons to fully repair (repaired in Q1/3






Zitat:
Industrial Allocation
- 4/4 factories producing 4000t materials.
- 498t from stockpile.
- 0.2 IP from Iberia
- 4,498t materials total.
- 2,714t used.
- 1,784t stored for Q3/38.

Infrastructure Development
Some IP is being applied, don't know where yet.

Naval Construction
at Callao:
Type 2.5 slip: idle
Type 1 slip: idle
Type 1 slip: idle
Type 2 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 3 drydock: Cruiser Callao scrapping. 7 3/8ths months required for scrapping. 805 tons removed for recycling (tonnage will be available in Q1/39)
Type 1 drydock: idle
Type 1 drydock: idle


at Mollendo:
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 drydock: idle

from factories:
N/A

Dockside:


Transactions
- 1,090 tons to India for Almirante Villar.
- 1,624 tons to Germany for Quechua.

Other Notes
2x3 8" turrets and 4x2 8" turrets removed from armoured cruiser Callao; being prepared for re-use.

Order of Battle (Peruvian Navy) end of Q2 1938
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Battleships:...........................2(0)1
Heavy/Armoured Cruisers:.....1(0)0-1
Cruisers:..............................4(0)1
Destroyers:..........................25(0)0
River Gunboats:....................0(0)0
Submarines:.........................7(0)0
Mine sweepers:....................3(0)0
Subchasers:.........................6(0)0

Summary