You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, March 3rd 2010, 3:26pm

Peru Q3/1937 and Q4/1937

Peru Q3/1937 and Q4/1937
Q3

Zitat:
Industrial Allocation
- 4/4 factories producing 4000t materials.
- 54t from stockpile.
- 0.2 IP from Iberia?
- 4,054t materials total.
- 3,000t used.
- 1,054t stored for Q4/37.

Infrastructure Development
N/A

Naval Construction
at Callao:
Type 2 slip: idle
Type 1 slip: idle
Type 1 slip: idle
Type 2 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 3 drydock: idle
Type 1 drydock: idle
Type 1 drydock: idle


at Mollendo:
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 drydock: idle

from factories:
N/A

Dockside:


Transactions
- 3,000 tons to India. 3,000 tons for Almirante Villar

Other Notes


Order of Battle (Peruvian Navy) end of Q3 1937
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Battleships:...........................2(0)1
Heavy/Armoured Cruisers:.....2(0)0
Cruisers:..............................4(0)0
Destroyers:..........................25(0)0
River Gunboats:....................0(0)0
Submarines:.........................7(0)0
Mine sweepers:....................3(0)0
Subchasers:.........................6(0)0

Summary
There was a little war that resulted in the loss of the following units:
- BB Huascar
- CL Piura
- DD Ocelot
- DD Pantera
- DD Jaguar
- DD Margay
- SS S-3
- SS SC-1

There was a little war that resulted in damage to the following units:
- ACR Callao: 55% (Heavy Damage). 5839 tons to fully repair
- CA Grau: 89% (Light Damage). 1576 tons to fully repair
- CL Colonel Bolonesi: 92%. 365 tons to fully repair



Q4
Zitat:
Industrial Allocation
- 4/4 factories producing 4000t materials.
- 1,054t from stockpile.
- 0.2 IP from Iberia?
- 5,054t materials total.
- 3,365t used.
- 1,689t stored for Q1/38.

Infrastructure Development
N/A

Naval Construction
at Callao:
Type 2 slip: idle
Type 1 slip: idle
Type 1 slip: idle
Type 2 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 3 drydock: CL Coronel Bolognesi, repairing from 92% damage. 365 tons required to repair; 365 tons added.
Type 1 drydock: idle
Type 1 drydock: idle


at Mollendo:
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 slip: idle
Type 0 drydock: idle

from factories:
N/A

Dockside:


Transactions
- 3,000 tons to India. 3,000 tons for Almirante Villar

Other Notes


Order of Battle (Peruvian Navy) end of Q4 1937
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Battleships:...........................2(0)1
Heavy/Armoured Cruisers:.....2(0)0
Cruisers:..............................4(0)0
Destroyers:..........................25(0)0
River Gunboats:....................0(0)0
Submarines:.........................7(0)0
Mine sweepers:....................3(0)0
Subchasers:.........................6(0)0

Summary

There was a little war that resulted in damage to the following units:
- ACR Callao: 55% (Heavy Damage). 5839 tons to fully repair
- CA Grau: 89% (Light Damage). 1576 tons to fully repair
- CL Colonel Bolonesi: 92%. 365 tons to fully repair (repaired in Q4)