German Naval Developments - Q4/22
A. Industrial Allocation
1/11 factories to naval materials; 1,000 t created, plus a stockpile of 1,192 t for 2,292 tons. 1,740 t of which is used, while 452 t are stockpiled.
6/11 factories (committed) to infrastructure development, producing 0.6 pts. 0.6 bonus pts are also produced Q4.
4/11 factories (non-committed) to infrastructure, producing 0.4 pts. In total, 1.6 pts are available.
B. Infrastructure Development
Factory 12 receives 1.5 pts, for a total of 3.4 pts.
A Type 2 slipway is started at Kiel and receives 0.1 pts.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock:
1 Type 1 slip: Patrol Boat
VB-3 receives 319 t, launched 1/11/22
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle
Free-floating: Patrol Boat
VB-1 receives 105 t; completes 30/10/22
At Bremerhaven
1 Type 2 slip:
1 Type 1 slip: Patrol Boat
VB-4 receives 319 t, launched 1/11/22
1 Type 1 drydock: idle
1 Type 0 slip: idle
Free-floating: Patrol Boat
VB-2 receives 105 t; completes 30/10/22
At Cuxhaven
1 Type 3 slip: idle
1 Type 3 drydock:
1 Type 2 slip: Idle
1 Type 1 slip: Minesweeper
R-1 receives 221 t, launched 30/10/22
1 Type 0 slip: idle
Free-floating:
At Kiel
1 Type 2 drydock:
1 Type 1 slips: Minesweeper
R-2 receives 221 t, launched 30/10/22
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle
Commericial shipyards build three 150 t coastal submarine chasers.
D. Transactions
None
E. Other Notes
CL
Emden completes shakedown cruise while CL
Munchen continues hers.
The 1923 program estimates include two light cruisers, two patrol boats, two minesweepers, two gunboats, and eight coastal submarine chasers.
New Orders: None
F. Updated Order of Battle, 31/12/22
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 10()+0
DD: 24
Note: PD = pre-dreadnought