[SIZE=4]SAE Quarterly Reports[/SIZE]
No. 62 – April to June 1936
[SIZE=3]Transfers/Notes:[/SIZE]
No transfers.
[SIZE=3]Factories:[/SIZE]
26 factories total can be used.
Fixed factories
No factory will be fixed to produce infrastructure points for 1936.
Flexible factories
452ts material transferred from Q1 (incl. material recovered from scrapyard).
25,411ts of material need to be produced in this quarter (26 factories).
0 factories will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,0pts put into factory #27 for a total of 3,4pts at the end of Q2/36.
[SIZE=3]Ships:[/SIZE]
Minor vessels
Completed Units
32x UJ26-class ASW launch
30x UJ30-class ASW launch
4x UJ35-class ASW launch
35x R28-class motor launch
23x R31-class motor launch
26x S34-class motor torpedo boat
8x Tree-class minesweeper (Type 16)
11x Bush-class minesweeper (Type 21)
8x Cactus-class minesweeper (Type 28)
4x Circe-class sloops
4x Polar II-class sloops
12x River-class frigate
5x Pleiades-class light destroyers
8x Planet-class light destroyers
4x Guard-class patrol crafts
4x GB35-class river gun boat
On Trials
2x LD35-class light destroyer
- LD35-1 Goshawk running trials until April 36
- LD35-2 Buzzard running trials until May 36
2x MS35-class minesweeper
- MS35-1 Tulip running trials until July 36
- MS35-2 Orchid running trials until September 36
8x UJ35-class ASW launch
- UJ89-UJ92 running trials until April 36
- UJ93-UJ96 running trials until June 36
4x S36-class motor torpedo boat
- S31-S34 running trials until May 36
2x Cactus-class minesweeper
- Drosanthemum running trials until May 36.
- Frithia running trials until June 36
1x UJ26-class ASW launch
- UJ14 running trials until June 36.
1x UJ30-class ASW launch
- UJ53 running trials until April 36.
Ordered Units
2x LD35-class light destroyer (10 month á 71ts material necessary per unit)
- LD35-4 Swallow laid down in Port Louis on a Type 1 slip in October, completed in July 36
- LD35-3 Mohawk laid down in Majunga on a Type 1 slip in May 36, completed in February 37
4x FR35-class frigate (1 month á 89ts and 9 month á 94ts material necessary per unit)
- FR35-1 Rukwa laid down in Douala on a Type 0 slip in November, completed in August 36
- FR35-2 Njassa laid down in Daressalam on a Type 0 slip in December, completed in September 36
- FR35-3 Chilwas laid down on Prince Eduard Islands on a Type 0 slip in January, completed in October 36
- FR35-4 Chiuta laid down on Port Louis on a Type 0 slip in January, completed in October 36
1x MS35-class minesweeper (5 month á 87ts material necessary per unit)
- MS35-3 Rose laid down in St. Helena on a Type 0 slip in January, completed in May 36
2x RM36C-class river monitor (1 month á 198ts material necessary per unit)
- Argonaut laid down in Buenos Aires on a Type 0 slip in April, completed in April 36
- Lynkeus laid down in Buenos Aires on a Type 0 slip in April, completed in June 36
4x UJ35-class ASW launch (1 month á 200ts material necessary per unit)
- UJ97-UJ100 laid down in Lüderitz in May, completed in May 36
8x S36-class motor torpedo boat (1 month á 80ts material necessary per unit)
- S35-S38 laid down in Rio Grande in April, completed in April 36
- S39-42 laid down in Rio Grande in June, completed in June 36
Rebuilds/Refits/Repairs
1x Pleiades-class light destroyer (3 month á 62ts/month necessary)
- Elektra entering a Type 0 dock in St. Helena in March. Leaving the dock in April, the light destroyer will stay in the yard until May 36.
Scrapping
None
Destroyers
Completed Units
8x Cat-class torpedoboat (Type 16)
7x Hound-class torpedoboat (Type 21)
10x Hound-class torpedoboat (Type 26)
8x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
15x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
7x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
On Trials
1x Weapon-class large destroyer (Type 28)
- Langdebeve running trials until June 36
1x TB21-class torpedo boat
- Borzoi running trials until April 36
Ordered Units
6x TB35-class torpedo boat (11 month á 110ts material necessary per unit)
- Salamander laid down in Durban on a Type 1 slip in November, completed in September 36
- Lizard laid down in Durban on a Type 1 slip in December, completed in October 36
- Chameleon laid down in Port Elizabeth on a Type 1 slip in January, completed in November 36
- Gecko laid down in Buenos on a Type 1 slip in February, completed in December 36
- Goanna laid down in Buenos on a Type 1 slip in Mar del Plata, completed in December 36
- Iguana laid down in Cape Town on a Type 1 slip in April, completed in February 37
Rebuilds/Refits/Repairs
1x DD30-class destroyer (3 month á 128ts/month material necessary)
- Egeria entering a Type 1 dock in St. Helena in February 36. Leaving the dock in March, the destroyer will stay in the yard until April 36
Scrapping
1x TB21-class torpedo boat (4 month total, 2 month in Type 2 dock)
- Terrier scrapping in Mar del Plata starting in May, finished in August – 171ts received from hull for Q2/1937
Class B Cruisers
Completed Units
2x Nampula-class light cruiser (Type 08)
4x Port Shepstone-class light cruiser (Type 13)
5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
4x Rosario-class light cruiser (Type 22)
2x Aurora-class light cruiser (Type 24)
1x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
2x Daphne-class anti aircraft cruiser (Type 34)
4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
1x Diana-class destroyer leader (Type 34)
On Trials
1x DL34C-class destroyer leader
- Uller running trials until July 36
Ordered Units
None
Repairs/Rebuilds/Refits
1x Ajax-class light cruiser (3 month á 359ts)
- Achilles entering a Type 2 dock in Durban in April 36. Leaving the dock in May, the cruiser will stay in the yard until June 36
1x Arion-class light cruiser (2 month á 230ts)
- Arion entering the yard in Mar del Plate in June 36, the cruiser will stay until July 36
Scrapping
None
Class A Cruisers
Completed Units
1x Colony-class AC
3x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
1x Hero-class (Type 33)
On Trials
1x Cape-class heavy cruiser
- Cape Corientes running trials until June 36
Ordered Units
2x CA34F-class heavy cruiser (26 month á 666ts material necessary per unit)
- Radiance laid down in Port Elizabeth on a Type 4 slip in April, completed in May 36
- Brilliance laid down in Durban on a Type 4 slip in July, completed in August 36
1x Hero-class heavy cruiser (21 month á 555ts material necessary per unit)
- Belerophon laid down in Buenos Aires on a Type 3 slip in October 34, all work halted August 35, work commenced in April 36, completed in February 37
Repair/Refits
None
Scrapping
None
Capital Units
Completed Units
2x Hertog-class
2x Koning-class
1x Mauritius-class
2x South Africa-class
2x Mocambique-class
0x Ophion-class
2x Triumph-class
2x Imperator-class
On Trials
1x Ophion-class battleship
- Hyperion running trials until April 36
1x Mauritius-class battleship
- Mauritius running trials until April 36
Ordered Units
2x BB33Lh-class battleship (48 month á 796ts material necessary per unit)
- Monarch laid down in Montevideo on a Type 4 slip in January 33, all work halted August 35, work commenced in April 36, completed in August 37
- Sovereign laid down in Buenos Aires on a Type 4 slip in January 34, all work halted August 35, work commenced in May 36, completed in September 38
Rebuilds/Refits
1x Ophion-class battleship (5 month á 2964ts/month and 10 month á 740ts/month material necessary – partial double rate)
- Ophion entering a Type 4 dock in Cape Town in August 35. Leaving the dock in November, the battleship will stay in the yard until October 36
Scrapping
None
Coastal Defence Units
Completed Units
0x Nagelring-class
1x Tyrfing-class
1x Gungnir-class
1x LCDS-class
1x LCDS-2-class
On Trials
None
Ordered Units
1x CDS8-class CDS (17 month á 467ts material necessary per unit)
- Excalibur laid down in Cape Town on a Type 3 slip in April, completed in August 36
Rebuilds/Refits
1x LCDS-2-class CDS (4 month á 178ts/month material necessary)
- Nagelfar entering a Type 1 dock in Montevideo in March 36. Leaving the dock in April, the LCDS will stay in the yard until June 36
1x Nagelring-class CDS (8 month á 428ts/month material necessary)
- Nagelring entering a Type 3 dock in Buenos Aires in February 36. Leaving the dock in May, the LCDS will stay in the yard until September 36
Carriers
Completed Units
1x Forge-class fleet carrier (Type 26)
2x Anvil-class light fleet carrier (Type 30)
On Trials
None
Ordered Units
2x CV34-class carrier (30 month á 687ts material necessary per unit)
- Thomas van Deen laid down in Durban on a Type 3 slip in April 34, completed in September 36
- Cornelis Keser laid down in Cape Town on a Type 3 slip in October 34, all work halted August 35, work commenced January 36, completed August 37
Rebuilds/Refits
None
Class A Submarines
Completed Units
9x E-class submarine
12x F-class submarine
3x J-class submarine
2x L-class submarine
On Trials
2x M-class fleet submarine
- M1 running trials until May 36
- M2 running trials until June 36
1x F-class submarine
- F14 running trials until April 36
Ordered Units
2x M-class fleet submarine (11 month á 99ts material necessary per unit)
- M3 laid down in Durban on a Type 0 slip in December, completed in October 36
- M4 laid down in Durban on a Type 0 slip in January 36, completed in November 36
Repairs/Rebuilds/Refits
None
Class B Submarines
Completed Units
15x I-class submarine
7x H-class submarine
12x K-class submarine
On Trials
1x K-class submarine
- K14 running trials until April 36
Ordered Units
None
Repairs/Rebuilds/Refits
None
Scrapping
None
Non-combatants
Completed Units
1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
2x Bay-class tender (Type 19)
3x Bay-class tender (Type 22)
2x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
3x Mimir-class floatplane carriers
1x Bölthorn-class floatplane carrier
1x Thjazi-class floatplane carrier
1x FV32-class fleet support ship
On Trials
1x TD35-class tender
- TD35-1 Montevideo Bay running trials until September 36
1x Thjazi-class floatplane carrier
- Ymir running trials until April 36
Ordered Units
None
Repairs/Rebuilds/Refits
None
----------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
66 ASW launches
58 motor launches
26 motor torpedo boats
27 minesweepers
37 small patrol crafts
4 river gunboat
94 TB/DD/DLs of less than 2,000ts
41 cruisers category b
8 cruisers category a
11 capital units
4 costal defence ships
3 fleet carrier
34 submarines category b
26 submarines category a
5 floatplane carriers
18 armed tenders
1 fleet support ship
plus numerous auxiliary vessels of all kind.