German Naval Developments - Q3/22
A. Industrial Allocation
4/11 factories to naval materials; 4,000 t created, plus a stockpile of 891 t for 4,891 tons. 3,699 t of which is used, while 1,192 t are stockpiled.
6/11 factories (committed) to infrastructure development, producing 0.6 pts, bonus pts for Q4.
1/11 factories (non-committed) to infrastructure, producing 0.1 pts.
B. Infrastructure Development
Factory 12 receives 0.7 pts, for a total of 1.9 pts.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: CL
Gazelle undergoes refit, receiving 791 t
1 Type 1 slip: Patrol Boat
VB-3 laid down 1/7/22, receives 319 t
1 Type 0 slip: idle
1 Type 0 slip: idle
1 Type 0 drydock: idle
Free-floating: Patrol Boat
VB-1 receives 319 t; due to complete 30/10/22
At Bremerhaven
1 Type 2 slip:
1 Type 1 slip: Patrol Boat
VB-4 laid down 1/7/22, receives 319 t
1 Type 1 drydock: idle
1 Type 0 slip: idle
Free-floating: Patrol Boat
VB-2 receives 319 t; due to complete 30/10/22
At Cuxhaven
1 Type 3 slip: idle
1 Type 3 drydock:
1 Type 2 slip: Idle
1 Type 1 slip: Minesweeper
R-1 laid down 1/7/22, receives 221 t
1 Type 0 slip: idle
Free-floating: CL
Munchen receives 740 t, completes 1/9/22
At Kiel
1 Type 2 drydock:
1 Type 1 slips: Minesweeper
R-2 laid down 1/7/22, receives 221 t
1 Type 1 drydock: idle
2 Type 0 slips: idle
1 Type 0 drydock: idle
Commericial shipyards build three 150 t coastal submarine chasers.
D. Transactions
None
E. Other Notes
CL
Emden continues shakedown cruise while CL
Munchen begins hers.
New Orders: two minesweepers, two patrol boats
F. Updated Order of Battle, 31/9/22
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 10(1)+0
DD: 24
Note: PD = pre-dreadnought