Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, March 8th 2004, 5:35pm

Houkokusho Taisho 9 Nen 9 Getsu 30 Nichi

(There were a few minor errors in the previous report(s) like the "used this month" instead of "used this quarter". Also I made an error with the construction time of the Kameko-chan. The total construction time of the Kameko-chan is 17 months so the time still needed to build it should have been 5 and not 1 month. I doubt this report is error free, but I hope that it is.)

Third Quarter of Ninth year of the Emperor Taisho report of Japan.

Submitted by Nakamura Shoda to the Shogun. Taisho 9 Nen 9 Getsu 30 Nichi

Tokugawa-dono,

Attached is a list of the 3rd quarter of the Ninth year of the Reign of Emperor Taisho.

Your loyal servant and secretary,
Nakamura Shoda

======================================

Factory assignment:

Of the 26 factories available to the empire, Factories I to XII are used for the infrastructure (fixed for the year. Note: Factory XIII was released for warship materials during the 2nd quarter) for 1.2 point in the quarter. Factories XIII to XXVI are assigned to produce materials to be used in the warships for a total of 14000 tons in the quarter.

Transactions

No transactions at the moment.

Infrastructure construction:

The infrastructure points are used in the construction on Factory XXVII (1.2 points at end of 2nd quarter).

Warships:

I) Ships already under construction.

Thirty-two vessels were under construction on April 1, 1922. The carriers Zuiho (ex Kaga) and Shoho (ex Tosa), the Light Cruiser Kameko-chan, the Gunboats G-II-1 and G-II-2, and 3rd class Destroyers Ssizz, Machi, Kyo, Lele-Sha, Andoromeda, Spallituda, Achilles, Icarus, Teata, Karakaline, Euphrosyne, Kale, Pasithea, Aglaia, Thalia, Auxo, Alecto, Megaera, Tisiphone, Upandlah, Atropos, Lachesis, Clotho, Ladios Sopp, Voards Viewlard, Potar and Philetto.

July 1, 1922 status
Zuiho: 28.5 months, 17730 tons. 2280 tons used this quarter.
Shoho: 23.5 months 13870 tons. 2340 tons used this quarter.
Kameko-chan: 12 months, 4792 tons, 2325 tons used this quarter.
Shizu: 9 months, 522 tons, 59 tons used this quarter.
Machi: 6 months, 348 tons, 174 tons used this quarter.
Kyo: 6 months, 348 tons, 174 tons used this quarter.
Rere-Sha: 6 months, 348 tons, 174 tons used this quarter.
Andoromedaa: 6 months, 348 tons, 174 tons used this quarter.
Suparichuuta: 6 months, 348 tons, 174 tons used this quarter.
Akiresu: 6 months, 348 tons, 174 tons used this quarter.
Ikarosu: 6 months, 348 tons, 174 tons used this quarter.
Tiita: 6 months, 348 tons, 174 tons used this quarter.
Kurakarain: 6 months, 348 tons, 174 tons used this quarter.
Efuroshuune: 6 months, 348 tons, 174 tons used this quarter.
Kare: 6 months, 348 tons, 174 tons used this quarter.
Pashitea: 6 months, 348 tons, 174 tons used this quarter.
Aguraia: 6 months, 348 tons, 174 tons used this quarter.
Tairea: 6 months, 348 tons, 174 tons used this quarter.
Aukusoo: 6 months, 348 tons, 174 tons used this quarter.
Arekutoo: 6 months, 348 tons, 174 tons used this quarter.
Megaera: 6 months, 348 tons, 174 tons used this quarter.
Teisuhoon: 6 months, 348 tons, 174 tons used this quarter.
Yuupandara: 6 months, 348 tons, 174 tons used this quarter.
Atorobosu: 6 months, 348 tons, 174 tons used this quarter.
Rakishisu: 6 months, 348 tons, 174 tons used this quarter.
Kuroosoo: 6 months, 336 tons, 187 tons used this quarter.
Ladios Sopp: 1 month, 58 tons, 174 tons used this quarter.
Voards Viewlard: 1 month, 58 tons, 174 tons used this quarter.
Potaru: 1 month, 58 tons, 174 tons used this quarter.
Firetto: 1 month, 58 tons, 174 tons used this quarter.
G-II-1: 1 month, 806 tons, 12 tons used this quarter.
G-II-2: 1 month, 806 tons, 11 tons used this quarter.

II) Ships started in the third quarter.

The 3rd class destroyers Shearasuta (NBF-III), Ahurochuun (NBF-IV), Sorutiaru (NBF-V), Kurappu (NBF-VI), Parusuetto (NBF-VII), Esu-Esu-Eru (NBF-VIII), Beruda (NBF-IX), Turanshu (NBF-X), Meiran (NBF-XI), Kurikkaku (NBF-XII), Teku (NBF-XIII), Esuto (NBF-XIV), Syucha (NBF-XV), and Paracha (NBF-XVI) were laid down on 9/3/1922. Each ship requires 581 tons and 10 months construction time. It is expected that they will be launched Early January 1923 and will be ready Late June 1923.

III) Status of ships under construction at the end of the first quarter.
Of the 14,000 tons, the Zuiho will receive 3x760 = 2280 tons, the Shoho will receive 3x780 = 2340 tons, and Kameko-chan will receive 2x772 and 1x781 = 2325 tons. Shizu will receive 1x59 = 59 tons., Machi, Kyo, Rere-Sha, Andoromedaa, Suparichuuta, Akiresu, Ikarosu, Tiita, Kurakarain, Efuroshuune, Kare, Pashitea, Aguraia, Tairea, Aukusoo, Arekutoo, Megaera, Teisuhoon, Yuupandara, Atorobosu, and Rakishisu will each receive 3x58 = 174 tons. Kuroosoo will receive 1x71 and 2x58 = 187 tons. G-II-1 will receive 3x4 = 12 tons and G-II-2 will receive 2x4 and 1x3 = 11 tons. Ladios Sopp, Voards Viewlard, Potaru, Firetto, Shearasuta, Ahurochuun, Sorutiaru, Kurappu, Parusuetto, Esu-Esu-Eru, Beruda, Turanshu, Meiran, Kurikkaku, Teku, Esuto, Syucha, and Paracha will each receive 3x58 = 174 tons

Zuiho at 75%. Still requires 8,020 tons and 11.75 months.
Shoho at 68%. Still requires 9,810 tons and 13.25 months.
Kameko-chan at 92%. Still requires 653 tons and 2 months. (note: I seem to have used the wrong building time)
Machi, Kyo, Rere-Sha, Andoromedaa, Suparichuuta, Akiresu, Ikarosu, Tiita, Kurakarain, Efuroshuune, Kare, Pashitea, Aguraia, Tairea, Aukusoo, Arekutoo, Megaera, Teisuhoon, Yuupandara, Atorobosu, and Rakishisu at 89%. Still require 59 tons and 1 months
Kuroosoo at 90%. Still needs 58 tons and 1 months
G II-1 at 48%. Still needs 896 tons and 5 months
G II-2 at 48%. Still need 897 tons and 5 months
Ladios Sopp and Voards Viewlard at 40 %. Still need 341 tons and 4 months
Potaru and Firetto at 40%. Still need 349 tons and 4 months
Shearasuta, Ahurochuun, Sorutiaru, Kurappu, Parusuetto, Esu-Esu-Eru, Beruda, Turanshu, Meiran, Kurikkaku, Teku, Esuto, Syucha, and Paracha at 30%. Still need 407 tons and 7 months.

IV) Finished ships
The 3rd Class Destroyer Shizu was competed on July 29. She set sail on August 4 for her shakedown cruise.

V) Planned projects.
None

Current fleet:
At the end of the 3nd Quarter
Limited warships:
- Battleships (6): 4 Fuso class and 2 Nagato class active.
- Carriers (1+2): 1 Hosho class active. 2 Zuiho class under construction.
- Heavy/Armored Cruisers (8+0): 4 Asama and 4 Jakumo class active. None under construction.
- Light Cruisers (13+1): 2 Tenryu class, 5 Kuma class, and 6 Nagara class active. Kameko-chan under construction.
- 1st Class Destroyers (0+0): None active. None under construction.
- 2nd Class Destroyers (22+0): 13 Minekaze class and 9 Kamikaze class active. None under construction.
- CDS (3+0): 3 Atsusa class active. None under construction.
- Submarines (7+0): 2 Ie Ichi class and 5 Ie Ni class active. None under construction.
Atsusa, Zansho and Asasamu on shakedown cruise.


Unlimited warships:
Sloops (0): None active..
Gunboats (24+2): 24 Go-ichi class active. 2 Go-ni class under construction.
Minelayer (27): 27 Ri-ichi class active.
Minesweeper (18): 18 Mu-ichi class active.
Small submarine chaser (42): 42 Shi-ichi class active.
Destroyer class 3 (59+33): 45 Ki-ichi class and 14 FSS: F class active, 38 FSS:F class and 2 FSS: OC class under construction.
Corvette (30): 30 Fu-ichi class active.
Large submarine chaser (30): 30 Ao-ichi class active.
Kuun, Paruteno, Majeru, Chandana, Niimu, Ietta, Odetto, Aarora, Jiseru, Bakusuchuaru, Dai-mon, Vitta-Shasse, and Toki on shakedown cruise.
Shizu started shakedown cruise on August 4

Construction/Repair activity:

I) Construction on Slips/in Docks at:
Kure Navy Yard, Kure (Honshu)
Slip V-1A => Kurappu laid down and under construction
Slip I-1A => no activity
Dock V-1A => no activity
Yokosuka Navy Yard, Yokosuka (Honshu)
Slip V-2A => Parusuetto laid down and under construction
Slip I-2A => no activity
Kawasaki Co, Kobe (Honshu)
Slip V-3A => Esu-Esu-Eru laid down and under construction
Slip II-3A => Paracha laid down and under construction
Dock II-3A => no activity
Mitsubushi Co, Nagasaki (Kyushu)
Slip V-4A => Beruda laid down and under construction
Slip II-4A => Shearasuta laid down and under construction
Dock II-4A => no activity
Fukuoka Navy Yard, Fukuoka (Kyushu)
Slip III-5A => Turanshu laid down and under construction
Slip II-5A => Ahurochuun laid down and under construction
Slip I-5A => no activity
Dock III-5A => no activity
Hakodate Navy Yard, Hakodate (Hokkaido)
Slip III-6A => Meiran laid down and under construction
Slip II-6A => Sorutiaru laid down and under construction
Slip I-6A => no activity
Aomori Navy Yard, Aomori (Honshu)
Slip III-7A => Kurikkaku laid down and under construction
Slip I-7A => Go II-1 under construction
Dock I-7A => no activity
Kagoshima Navy Yard, Kagoshima (Kyushu)
Slip III-8A => Teku laid down and under construction
Slip I-8A => Go II-2 under construction
Dock I-8A => no activity
Wakayama Navy Yard, Wakayama (Honshu)
Slip III-9A => Esuto laid down and under construction
Slip I-9A => Ladios Sopp under construction
Dock I-9A => no activity
Tokushima Navy Yard, Tokushima (Shikoku)
Slip III-10A => Syucha laid down and under construction
Slip I-10A => Voards Viewlard under construction
Dock I-10A => no activity
Niigata Navy Yard, Niigata (Honshu)
Slip I-11A => no activity
Slip I-11B => no activity
Dock III-11A => no activity
Niihama Navy Yard, Niihama (Shikoku)
Slip I-12A => Potaru under construction
Slip I-12B => Firetto under construction
Dock III-12A => no activity

II) Free-floating construction at:

Kure Navy Yard, Kure (Honshu)
- Aguraia under construction
- Machi under construction
Yokosuka Navy Yard, Yokosuka (Honshu)
- Tairea under construction
- Kyo under construction
Kawasaki Co, Kobe (Honshu)
- Zuiho under construction
- Aukusoo under construction
- Kuroosoo under construction
Mitsubushi Co, Nagasaki (Kyushu)
- Shoho under construction
- Arekuto under construction
Fukuoka Navy Yard, Fukuoka (Kyushu)
- Megaera under construction
- Rere-Sha under construction
Hakodate Navy Yard, Hakodate (Hokkaido)
- Shizu completed
- Teisuhoon under construction
- Andoromedaa under construction
Aomori Navy Yard, Aomori (Honshu)
- Yuupandara under construction
- Suparichuuta under construction
Kagoshima Navy Yard, Kagoshima (Kyushu)
- Atorobosu under construction
- Akiresu under construction
Wakayama Navy Yard, Wakayama (Honshu)
- Kameko-chan under construction
- Ikarosu under construction
Tokushima Navy Yard, Tokushima (Shikoku)
- Rakishisu under construction
- Tiita under construction
Niigata Navy Yard, Niigata (Honshu)
- Kurakarain under construction
- Efuroshuune under construction
Niihama Navy Yard, Niihama (Shikoku)
- Kare under construction
- Pashitea under construction



Five Star Stories and all related stuff copyright Mamuro Nagano, Toys Press, Inc. and Kadokawa Shoten.

2

Monday, March 8th 2004, 5:51pm

Third Quarter 1922 attachment I

Additional ships for the FSS: F class.
O-27 Erara (*)----------Elala

Three additional ships for the FSS: OC class.
OC-47 Commander Meia Toccata
OC-48 Lt. Col. Cyclommatus Metallifer
OC-49 Vogin de Leibuch


This updates the list of characters for FSS isues 17 and 18. Damn it!!! I can't stand it that I still do not have issue 14!!

3

Monday, March 8th 2004, 6:09pm

Second Quarter 1922 attachment II

Subject: Progress on the Dowager Eisho class Japanese Ocean Liner.

Tokugawa-dono,

Here is this quarter’s report from the Civilian Shipbuilding Department …

========================================
Report from the Civilian Shipbuilding Department
From: CSD
To: Nakamura Shoda
Subject: Dowager Eisho Class progress report 3rd Quarter 1922


Nakamura-sama,
Here is the information for the 3rd Quarter:

Factories XIII to XXVI produce 7000 tons of civilian materials in the quarter.
Of the 7,000 tons produced, each ship gets 3500 tons.
The Empress Yoshiko still requires 3 6 months and 21,247 tons of materials at the end of the third quarter.
The Empress Yasuko still requires 42 months and 32,247 tons of materials at the end of the third quarter.

Konoye Fumimaro
Director of the Civillian Shipbuilding Department


========================================

Your loyal servant and secretary,
Nakamura Shoda