You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, January 1st 2009, 9:38pm

Canada, Eh? Q1/37

Candian Industrial Report – Q1/ 1937
__________________________________

Industrial Allocation

0/10 factories are dedicated to producing infrastructure materials = 0 pts

0/10 factories are producing infrastructure materials = 0 pts

10/10 factories producing warship material = 10000 t.

Stockpiled warship material available = 78t

Stockpiled Industrial points = 0

Total points available = 0

Total warship material available = 15000t

__________________________________

Infrastructure Development

__________________________________

Naval Construction
HMCS Renown modernization recieves 4500 tons.
HMCS Repulse modernization recieves 4500 tons.
HMCS Courageous modernization recieves 3000 tons.
HMCS Glorious modernization recieves 3000 tons.
HMCS Ontario Laid down.
HMCS Qubec Laid down.
HMCS British Columbia Laid down.
HMCS Alberta Laid down.


__________________________________

Esquimault, British Columbia (Messrs. Yarrow Ltd. at Lang's Cove)
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle

Montreal, Quebec (Versatile Vickers [Canadian Vickers])
Type 2 Slip: Idle
Type 2 Slip: Idle
Type 2 Slip: Idle
Type 1 Slip: Idle
Type 4 Drydock: Idle
Type 3 Drydock: HMCS Quebec 20/17000 26/26 months remaining
Type 2 Drydock: HMCS Alberta 20/17000 26/26 months remaining
Dockside: HMCS Repulse 16,500/16,500 Completed
Dockside: HMCS Canada 39,319/40,319 1/49 months remaining
Dockside: HMCS Glorious 8,000/11,000 2/8 months remaining
Dockside: HMCS Sir John Franklin 5,000/9,999 4/19 months remaining
Dockside: HMCS Nonsuch 5,000/9,999 4/19 months remaining

Quebec City, Quebec
Type 4 Drydock: Idle

Halifax, Nova Scotia (Halifax Royal Naval Dockyard)
Type 4 Drydock: HMCS Ontario 20/17000 26/26 months remaining
Type 3 Drydock: HMCS British Columbia 20/17000 26/26 months remaining
Dockside: HMCS Renown 16,500/16,500 Completed
Dockside: HMCS Excelsior 39,319/40,319 1/49 months remaining
Dockside: HMCS Courageous 8,000/11,000 2/8 months remaining

Saint John, New Brunswick
Type 1 drydock: Idle


__________________________________

Transactions
5000 tons from Great Britain.
HMS Ramilles and HMS Resolution returned to RN

__________________________________

Other Notes

7.5"/55 (19 cm) QF Mark VII Project ongoing at Canadian Vickers

9.2"/55 (23.4 cm) Mark XIV Project ongoing at ShinRa Munitions.

CADRE Project "Juno" ongoing at ShinRa Munitions.

CADRE Project "Skimmer" ongoing at Avro Canada

CADRE Project "Archaeopteryx" ongoing at Avro Canada

CADRE Project "Cayuga" ongoing at Orenda Aerospace