You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Saturday, October 18th 2008, 12:01am

Denmark, Quarter 4, 1936

Danish Naval Developments Q4 1936

a/ Industrial Allocation
7/11 factories producing materiel for shipbuilding = 7000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts + 0.3 bonus pts
1/11 Factories producing infrastructure materiel = 0.1 points


b/ Infrastructure Development
Drydock No.1 (Type 1) at Phuket, continues extension to Type 2, receives 0.7 IP points to complete
Drydock No.1 (Type 0) at St. Thomas, continuess extension to Type 1, receives 0.5 IP points to complete
Drydock No.1 (Type 0) at Guinea Bisseau, continues construction, receives 0.5 IP points to complete


c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Idle
No.2 type 2 slip - Idle
No.3 type 1 slip – Idle
No.4 type 1 slip – Defender, CDS, laid down 01/07/35, receives 1307 tons, balance 2011 tons
No.1 type 3 drydock – Idle
Dock side - Magni, CV, reconstruction started 01/08/34, receives 1701 tons, balance 2132 tons


Aarhus-
No.1 type 3 slip – Idle
No.2 type 2 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip – Guardian, CDS, laid down 02/01/35, receives 704 tons to complete

No.1 type 3 drydock – Lif and Lifthrasir, reconstruction started 01/07/1936, receives 427 tons each, balance 264 tons each
No.2 type 2 drydock – Staerkmand, reconstruction started 01/07/1936, receives 854 tons, balance 976 tons

Dock side – Modi, CV, reconstruction started 01/08/34, receives 1701 tons, balance 2132 tons


Aalborg-
No.1 type 1 slip – Siam 1, MWS, laid down 02/01/1936, receives 58 tons to complete
No.2 type 1 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.5 type 1 slip – Idle
No.6 type 1 slip - Idle

Dock side - Idle

Phuket-
No.1 type 2 drydock - Complete
No.2 type 1 drydock - Idle

Berbera-
No.1 type 1 drydock – Idle

St. Thomas-
No.1 type 1 drydock – Complete

Guinea Bisseau-
No.1 type 0 drydock – Complete

d/ Transactions
1.2 pts from Iberia for infrastructure development
0.2 IP points to Siam for Infrastructure development
58 tons from Siam for 1 x MWS building in Aalborg

e/ Other Notes
KDM MTC100 commissions on 31/10/1936
KDM Protector commissions on 6/11/1936
KDM Guardian commences sea trials on 10/11/1936
Siam MWS commences sea trials on 20/10/1936

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 174 tons

f/ Order of Battle
Note: X (Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 02 (0) + 0/0 (0)
CDS = 02 (0) + 2/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 00 (0) + 2/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 38 (0) + 0/0 (0)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
MTC = 100 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)

This post has been edited 4 times, last edit by "Commodore Green" (Nov 29th 2009, 7:16am)