Danish Naval Developments Q3 1936
a/ Industrial Allocation
7/11 factories producing materiel for shipbuilding = 7000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts
1/11 Factories producing infrastructure materiel = 0.1 points
b/ Infrastructure Development
Drydock No.1 (Type 1) at Phuket, commences extension to Type 2, receives 0.1 IP point, balance 0.7 IP points
Drydock No.1 (Type 0) at Berbera, commences extension to Type 1, receives 0.2 IP points to complete
Drydock No.1 (Type 0) at St. Thomas, commences extension to Type 1, receives 0.1 IP point, balance 0.5 IP points
Drydock No.1 (Type 0) at Guinea Bisseau, commences construction, receives 0.1 IP point, balance 0.5 IP points
c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Idle
No.2 type 2 slip - Idle
No.3 type 1 slip – Idle
No.4 type 1 slip – Defender, CDS, laid down 01/07/35, receives 1307 tons, balance 3318 tons
No.1 type 3 drydock – Idle
Dock side - Magni, CV, reconstruction started 01/08/34, receives 1701 tons, balance 3833 tons
Aarhus-
No.1 type 3 slip – Idle
No.2 type 2 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip – Guardian, CDS, laid down 02/01/35, receives 1307 tons, balance 704 tons
No.1 type 3 drydock – Lif and Lifthrasir, reconstruction started 01/07/1936, receives 427 tons each, balance 691 tons each
No.2 type 2 drydock – Staerkmand, reconstruction started 01/07/1936, receives 854 tons, balance 1830 tons
Dock side – Modi, CV, reconstruction started 01/08/34, receives 1701 tons, balance 3833 tons
Aalborg-
No.1 type 1 slip – Siam 1, MWS, laid down 02/01/1936, receives 234 tons, balance 58 tons
No.2 type 1 slip – Idle
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.5 type 1 slip – Idle
No.6 type 1 slip - Idle
Dock side - Idle
Phuket-
No.1 type 1 drydock - EXTENDING
No.2 type 1 drydock - Idle
Berbera-
No.1 type 0 drydock – EXTENDING
St. Thomas-
No.1 type 0 drydock – EXTENDING
Guinea Bisseau-
No.1 type 0 drydock – BUILDING
d/ Transactions
0.2 pts from Iberia for infrastructure development
0.1 IP points to Siam for Infrastructure development
234 tons from Siam for 1 x MWS building in Aalborg
e/ Other Notes
KDM MTC091 to MTC099 commission on 30/7/1936
KDM Protector continues sea trials until 6/11/1936
SIAM Sub1 & Sub2 commission on 12/8/1936
Tonnage from scrapping = 693 tons
Tonnage Carried Over From This Quarter = 370 tons
f/ Order of Battle
Note: X (Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 0/0 (0)
CDS = 01 (0) + 3/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 00 (0) + 2/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 38 (0) + 0/0 (0)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
MTC = 99 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
This post has been edited 1 times, last edit by "Commodore Green" (Aug 21st 2008, 1:34am)