[SIZE=4]Industrial Allocation[/SIZE]
- 3/9 factories (worn) producing 2,700t materials, 1,281 tons from stockpile; total, 3,981 tons
- 3,430 tons used, 551 tons stockpiled for Q4/36.
[SIZE=4]Industrial Account[/SIZE]
[SIZE=1]Note: this is necessary to show as Chile's factories are partly worn, partly repaired.[/SIZE]
Factory 1 - Full (100%) (Committed to IP)
Factory 2 - Full (100%) (Committed to IP)
Factory 3 - Full (100%) (Committed to IP)
Factory 4 - Full (100%) (Committed to IP)
Factory 5 - Full (100%) (Committed to IP)
Factory 6 - Worn (90%), .4 IP to repair (Building tonnage)
Factory 7 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 8 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 9 - Full Production (Committed to IP) (Factory was completed earlier in 1935, and is not worn from war production.)
[SIZE=4]Infrastructure Development[/SIZE]
- 6/9 factories (repaired) committed to Infrastructure (0.6 IP)
TOTAL: .6 IP available.
0.4 IP added to Factory #6 to fix.
0.2 IP added to Factory #7 to fix, 0.3 IP remaining to fix.
[SIZE=4]Naval Construction[/SIZE]
at Talcahuano:
D3: idle
S3: idle
D2: PC Chacabuco[i] scrapping. 4.3 months to complete, 576 tons to recover.
D2: idle
S2: idle
S1: Dragaminas Type-1935 minesweeper [i]DM-13 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
D0: idle
at Valparaiso:
S1: Dragaminas Type-1935 minesweeper DM-14 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
S1: idle
D1: PC Negro scrapping. 3.9 months to complete, 402 tons to recover.
at Mejillones:
S0: Dragaminas Type-1935 minesweeper DM-15 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
S0: Dragaminas Type-1935 minesweeper DM-16 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
D0: idle
from factories:
N/A
Dockside:
- Dragaminas Type-1935 minesweeper DM-7 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-8 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-9 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-10 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-11 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-12 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
On Trials
- Dragaminas Type-1935 minesweeper DM-5 on trials from May 12th to August 12th.
- Dragaminas Type-1935 minesweeper DM-6 on trials from May 12th to August 12th.
- Dragaminas Type-1935 minesweeper DM-7 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-8 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-9 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-10 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-11 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-12 on trials from August 12th to November 12th.
[SIZE=4]Transactions[/SIZE]
- 1,450 tons to Atlantis for purchase of Astraea and Antrim.
[SIZE=3]Other Notes[/SIZE]
- Lead time production started for 10" gun barrels for Reemplazar C project.
- Design committees formed for:
---Proyecto A
---Proyecto B
---Reemplazar C
---Reemplazar D
---Reemplazar E
[SIZE=4]Order of Battle (Armada de Chile) end of Q3 1936[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Dreadnought Battleships............2(0)+0
Dreadnought Battlecruisers........1(0)+0
Predreadnoughts......................2(0)+0
Coast Defense Ships.................1(0)+0
Aircraft Carrier.........................1(0)+0
Armoured Cruisers....................3(0)+0
Heavy Cruiser...........................2(0)+0
Light Cruisers...........................9(0)+0 (2 purchased from Atlantis)
Protected Cruisers....................0(0)+0 -2
Floatplane Cruisers...................1(0)+0
Destroyers..............................23(0)+0 {1,200 tons std and up}
Light Destroyers.......................6(0)+0 {under 1,200 tons std}
Submarines.............................8(0)+0
Floatplane Carriers...................2(0)+0
Subchasers.............................24(0)+0
Minesweepers.........................6(0)+10
Tenders.................................2(0)+0
Colliers...................................2(0)+0
Sail Training Sloop...................1(0)+0
Attack Transports....................4(0)+0
Transports..............................2(0)+0
-Emergency Use-
Patrol Boats..........................11(0)+0
Transports............................12(0)+0
Museum Ships.......................1(0)+0
This post has been edited 5 times, last edit by "Brockpaine" (Oct 19th 2008, 8:49pm)