You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, August 20th 2008, 5:49am

Chile Q3/1936

[SIZE=4]Industrial Allocation[/SIZE]
- 3/9 factories (worn) producing 2,700t materials, 1,281 tons from stockpile; total, 3,981 tons
- 3,430 tons used, 551 tons stockpiled for Q4/36.

[SIZE=4]Industrial Account[/SIZE]
[SIZE=1]Note: this is necessary to show as Chile's factories are partly worn, partly repaired.[/SIZE]

Factory 1 - Full (100%) (Committed to IP)
Factory 2 - Full (100%) (Committed to IP)
Factory 3 - Full (100%) (Committed to IP)
Factory 4 - Full (100%) (Committed to IP)
Factory 5 - Full (100%) (Committed to IP)
Factory 6 - Worn (90%), .4 IP to repair (Building tonnage)
Factory 7 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 8 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 9 - Full Production (Committed to IP) (Factory was completed earlier in 1935, and is not worn from war production.)

[SIZE=4]Infrastructure Development[/SIZE]
- 6/9 factories (repaired) committed to Infrastructure (0.6 IP)
TOTAL: .6 IP available.

0.4 IP added to Factory #6 to fix.
0.2 IP added to Factory #7 to fix, 0.3 IP remaining to fix.

[SIZE=4]Naval Construction[/SIZE]

at Talcahuano:
D3: idle
S3: idle
D2: PC Chacabuco[i] scrapping. 4.3 months to complete, 576 tons to recover.
D2: idle
S2: idle
S1: Dragaminas Type-1935 minesweeper [i]DM-13
laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
D0: idle

at Valparaiso:
S1: Dragaminas Type-1935 minesweeper DM-14 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
S1: idle
D1: PC Negro scrapping. 3.9 months to complete, 402 tons to recover.

at Mejillones:
S0: Dragaminas Type-1935 minesweeper DM-15 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
S0: Dragaminas Type-1935 minesweeper DM-16 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q3/1936 (launches 08/23/36); 140 tons remaining until completion (on November 12th, 1936).
D0: idle

from factories:
N/A

Dockside:
- Dragaminas Type-1935 minesweeper DM-7 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-8 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-9 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-10 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-11 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).
- Dragaminas Type-1935 minesweeper DM-12 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q3/1936; completion (on August 12th, 1936).

On Trials
- Dragaminas Type-1935 minesweeper DM-5 on trials from May 12th to August 12th.
- Dragaminas Type-1935 minesweeper DM-6 on trials from May 12th to August 12th.
- Dragaminas Type-1935 minesweeper DM-7 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-8 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-9 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-10 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-11 on trials from August 12th to November 12th.
- Dragaminas Type-1935 minesweeper DM-12 on trials from August 12th to November 12th.

[SIZE=4]Transactions[/SIZE]
- 1,450 tons to Atlantis for purchase of Astraea and Antrim.

[SIZE=3]Other Notes[/SIZE]
- Lead time production started for 10" gun barrels for Reemplazar C project.
- Design committees formed for:
---Proyecto A
---Proyecto B
---Reemplazar C
---Reemplazar D
---Reemplazar E

[SIZE=4]Order of Battle (Armada de Chile) end of Q3 1936[/SIZE]

Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Dreadnought Battleships............2(0)+0
Dreadnought Battlecruisers........1(0)+0
Predreadnoughts......................2(0)+0
Coast Defense Ships.................1(0)+0
Aircraft Carrier.........................1(0)+0
Armoured Cruisers....................3(0)+0
Heavy Cruiser...........................2(0)+0
Light Cruisers...........................9(0)+0 (2 purchased from Atlantis)
Protected Cruisers....................0(0)+0 -2
Floatplane Cruisers...................1(0)+0
Destroyers..............................23(0)+0 {1,200 tons std and up}
Light Destroyers.......................6(0)+0 {under 1,200 tons std}
Submarines.............................8(0)+0
Floatplane Carriers...................2(0)+0
Subchasers.............................24(0)+0
Minesweepers.........................6(0)+10
Tenders.................................2(0)+0
Colliers...................................2(0)+0
Sail Training Sloop...................1(0)+0
Attack Transports....................4(0)+0
Transports..............................2(0)+0

-Emergency Use-
Patrol Boats..........................11(0)+0
Transports............................12(0)+0
Museum Ships.......................1(0)+0

This post has been edited 5 times, last edit by "Brockpaine" (Oct 19th 2008, 8:49pm)