You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, August 19th 2008, 11:50pm

Brazil Q2/34 Report

Marinha Imperial
1934 Second Quarter Report
1 April-30 June

A. Factories
3/7 factories = 3000t of material + 998t stockpiled = 3,998t available
2,496t are used and 0t transferred, leaving a stockpile of 1,502t.

3/7 factories (committed) = 0.3 infrastructure pts +
1/7 factories (flexible) = 0.1 pts = 0.4 pts available

B. Infrastructure Development

Continued work on upgrade of Type 0 Dock at Macapa to Type 1
0.1 points added - 0.0 needed to complete

Started work on upgrade to Type 2 Slip at Rio to Type 3
0.3 points added - 0.7 needed to complete

C. Naval Development and Construction

at Rio de Janeiro:
S2: *upgrading*
S1: idle
S1: idle
S1: DD-23 Colocolo constructing, receives 498t, balance 498t
S1: idle
D3: CL-14 Sagitério laid down 15 January, receives 1500t, balance 6924t
D3: idle

at Macapa:
S1: idle
S1: idle
S1: idle
S1: DD-24 Pampas constructing, receives 498t, balance 498t
S0: idle
D0: *upgrading*
D0: idle

at Manaus:
S0: idle
S0: idle
D0: idle
D0: idle

Commercial shipyards:
idle

D. Transactions

none

E. Other Notes

Macapa D0->D1 upgrade complete this quarter

Rio S2->S3 upgrade started this quarter

F. Scrappage Report

none

G. Updated Order of Battle, 30 June 1934

Note: completed (under repair/refit) + under construction

Battleships 2(0)+0
Coastal Battleships 0(0)+0
Battlecruisers 2(0)+0
Light Cruisers 4(0)+1
Destroyers 22(0)+2
Submarines 9(0)+0
Gunboats 5(0)+0
Minelayers 1(0)+0
Submarine Tender 1(0)+0
Collier 1(0)+0
Training Ship 1(0)+0

This post has been edited 2 times, last edit by "TheCanadian" (Aug 25th 2008, 11:39pm)


2

Tuesday, August 19th 2008, 11:52pm

You are remaking everything from Q2 1934 ?

3

Tuesday, August 19th 2008, 11:58pm

Have to. The errors go back that far. If I don't then everything gets messed up.

Look at the Sagiterio in this and this and see if there's something different.

Im not adding any ships or anything, just correcting things.

4

Wednesday, August 20th 2008, 12:05am

I can see the errors and the missing production pointed out in the Brazil request thread which I understand are annoying but by doing this you will create an significant stockpile available now..

This post has been edited 1 times, last edit by "Vukovlad" (Aug 20th 2008, 12:05am)


5

Wednesday, August 20th 2008, 12:18am

958 tons difference to be exact.

What am I supposed to do though? If I leave it as it is, then im cheating, and if I change it, it does give me a bit of an advantage.

Perhaps the Sagiterio should remain as Swampy had it (9924 tons). And her sisters be changed to Fyrwulf's modified design?

6

Wednesday, August 20th 2008, 12:26am

I thought would be more? 2000t from production plus accelerated finishing of the CLs

7

Wednesday, August 20th 2008, 12:35am

There is the 2000tons from production, but I wasnt going to add that until the mods give me the ok.

958 tons is the saved tonnage up until Q1/36, with only one cruiser completed.