You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, August 17th 2008, 3:14pm

Argentina Q2 and Q3/36

Argentine Q2/1936 Report

Seven factories producing 105000tons of warship material a quarter or 3500tons per month (see below)

NOTE: Argentina is in the final quarter of a war economy for a period of two quarters

STATUS AS OF 30/06/36
At Bahia Blanca:
1 Type 3 slip Espora (LSC Class) LSC 321.5 tons per month (launched June 1936)
1 Type 1 slip Torpedo Destroyer A 125.2 tons per month
1 Type 1 slip N/A
1 Type 0 slip Chaco Class C09 21 tons per month Chaco CA3 73.5 tons per month (laid down June)
1 Type 0 slip Chaco Class C10 21 tons per month
1 Type 0 slip Chaco Class CA1 21 tons per month
1 Type 0 slip N/A
1 Type 3 drydock Cruiser Capitan Peron 571 tons per month (repairs to complete Q3/36)
At Puerto Belgrano:
1 Type 2 slip Torpedo Destroyer D 125.2 tons per month (launched May)
1 Type 1 slip Torpedo Destroyer C 125.2 tons per month (launched May)
1 Type 1 drydock Destroyer Salto (repairs to complete end Dec)
1 Type 1 drydock
At Comodoro Rividavia:
1 Type 0 slip Chaco Class CA2 21 tons per month Chaco CA3 73.5 tons per month (laid down June)
1 Type 1 slip Torpedo Destroyer B 125.2 tons per month
1 Type 2 drydock Cruiser Fortazela 359 tons per month (repairs to completed June)
2 Type 0 drydocks N/A

Completion 30/06/36

Espora Light Cruiser 1929 tons = 44% complete
Chaco C09 294 tons = 100% completed end April
Chaco C10 294 tons = 100% completed end April
Chaco CA1 294 tons = 100% completed end April
Chaco CA2 294 tons = 100% completed end April
Chaco CA3 73.5 tons = 23% complete
Chaco CA4 73.5 tons = 23% complete
Torpedo Destroyer A 1290 tons = 100% completed mid May
Torpedo Destroyer B 1126.8 tons = 87% complete
Torpedo Destroyer C 751.2 tons = 58% complete
Torpedo Destroyer D 751.2 tons = 58% complete

Small craft:
2x Project 611L2 Class Patrol Boats = 352 tons

Refits:

War Repairs: 500 tons stockpile to cover minor damage repairs
Fortazela rated (six months in dry dock 2155 tons total)
Capitan Peron 1713 tons (seven months in dry dock 3997 tons total) rated 65%

Total construction costs
Jan tons 1493 tons
Feb tons 1430.8 tons
Mar tons 1577.8 tons

Total: 5001.6 tons
Carry over from Q1= 3243.2 tons

Foreign payments:
1840 tons to Japan for 2 carriers
Total: 1840 tons

Payments received: N/A

Total Cost tons: 5416.8 tons
Carry over to Q3 1936: 6901.6 tons


Argentine Q2/1936 Report

Seven factories producing 7000tons of warship material a quarter or 2333tons per month

NOTE: Argentina no longer in a war economy

STATUS AS OF 31/09/36
At Bahia Blanca:
1 Type 3 slip Espora (LSC Class) LSC 321.5 tons per month (launched June 1936)
1 Type 1 slip 1936 Class Capitan Tejada 149.5 tons per month
1 Type 1 slip 1936 Class Lynch 149.5 tons per month
1 Type 0 slip Chaco CA3 73.5 tons per month (launched July)
1 Type 0 slip
1 Type 0 slip
1 Type 0 slip N/A
1 Type 3 drydock Cruiser Capitan Peron 571 tons per month (repairs to complete end Q3/36)
At Puerto Belgrano:
1 Type 2 slip Torpedo Destroyer D 125.2 tons per month (launched May)
1 Type 1 slip Torpedo Destroyer C 125.2 tons per month (launched May)
1 Type 1 drydock
1 Type 1 drydock
At Comodoro Rividavia:
1 Type 0 slip Chaco CA3 73.5 tons per month (launched July)
1 Type 1 slip Torpedo Destroyer B 125.2 tons per month
1 Type 2 drydock N/A
2 Type 0 drydocks N/A

Completion 31/09/36

Espora Light Cruiser 2983.5 tons = 68% complete
Chaco CA3 294 tons = 93% complete
Chaco CA4 294 tons = 93% complete
Torpedo Destroyer B Buchardo 1290 tons = 100% completed mid August
Torpedo Destroyer C Jorge 1126.8 tons = 87% complete
Torpedo Destroyer D Thorne 1126.8 tons = 87% complete
1936 Class Capitan Tejada 448.5 tons = 28.5% complete
1936 Class Lynch 448.5 tons =28.5% complete

Small craft:
2x Type 4A (MAS 501) MTB = 44 tons

Refits:
Capitan Peron 1713 tons (repairs complete end July)

Total construction costs
Jan tons 1714.1 tons
Feb tons 1143.1 tons
Mar tons 1143.1 tons

Total: 4000.3 tons
Carry over from Q2= 6901.6 tons

Foreign payments:
1840 tons to Japan for 2 carriers
Total: 1840 tons

Payments received: N/A

Total Cost tons: 5840.3 tons
Carry over to Q4 1936: 8061.3 tons

Order of Battle, 31 September
Note: X(Y) +Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships: 2(0) +0
Battlecruisers: 1(0) +0
Coast Defence Battleships: 0(0) +0
Aircraft Carriers: 2(0) +0
Heavy Cruisers: 2(0) +0
Light Cruisers (one rated gunnery training ship): 13(0) +1
Destroyer Leaders 1(0) +0
Destroyers: 22(0) +4
Escorts/ Minesweepers 12 (0) +2 (1 Yacht)
Submarines: 5(0) +0
Torpedo Boats: 5(0) +0
Fast Torpedo Craft: 18(0)
Gunboats: 5(0) +0
River Gunboats: 6(0) +0
Motor River Gunboats: 18(0) +0
Patrol Gunboats 20(0) +0 (Project 611 boats)
Minelayers: 1(0) +0
Training Ships: 1(0) +0
Despatch Vessels: 16(0) +0
Oilers: 1(0) +0
Transports: 7(0) +0
Survey Ships: 1(0) +0
Tugboats: 3(0) +0
Crane Ships: 1(0) +0