You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, August 17th 2008, 12:45am

Bulgaria Q3 1936

Industrial Allocation
- 3/3 factories producing 3000t materials.
- 12t from stockpile.
- 3012t materials total.
- 3012t used.
- 0t stored for Q4/36.

Infrastructure Development
N/A

Naval Construction
at Varna:
1 Type 1 slip - DD-1 (Drazki), 1,688 tons required, 399 tons added Q2, 1,289 tons remaining until completion. Laid down 07/01/36; launches 11/15/36; completes 05/20/1937.
1 Type 1 slip - Not in use
1 Type 0 slip - Not in use
1 Type 2 drydock - Used for scrapping PDN Sofia starting 04/23/36.
1 Type 1 drydock - Used for scrapping CL Montana starting 03/01/1936.

at Burgas:
1 Type 0 slip - Not in use
1 Type 0 slip - Not in use
1 Type 0 drydock - Not in use

Dockside:
- CL-1 (Danube), laid down September 1935, receives 1306.5 tons, balance 5661.5 tons, 1,410 tons remaining, launched March 31st 1936, completes 01/1937.

Transactions
- 1306.5 tons transferred to Turkey for construction of CL-2 (Maritsa), Maritsa receives 1306.5 tons, balance 5661.5 tons, 1,410 tons remaining, launched March 31st 1936, completes 01/1937.

Scrappage Report
- PDN Sofia completes scrapping.
- CL Montana completes scrapping.

1043 tons of material are in recycling between Q2 and Q3, and will be available in Q4; 1044 tons of material go in recycling Q3 and Q4, and will be available in Q1/37.

Order of Battle (Bulgarian Royal Navy)

BB:..................................1(0)0
PD:..................................0(0)0 *1 scrapping
CA:..................................0(0)0
CL:...................................1(0)2 *1 building in Turkey
DDL:................................0(0)0
DD:..................................0(0)1
Torpedo boats:..................18(0)0
MTB's:.............................18(0)0
Mine sweepers:.................3(0)0
Auxillary's:.........................0(0)0

Summary
Bulgaria is two quarters away from completing the light cruisers Danube and Maritsa. These two ships will be manned by the former sailors of the predreadnought Sofia (Danube) and the light cruiser Montana (Maritsa). Meanwhile, Bulgaria's first destroyer, the Drazki, is laid down in Varna.