You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, August 10th 2008, 4:42am

Chile Q1/1936

[SIZE=3]Industrial Allocation[/SIZE]
- 3/9 factories (worn) producing 2,700t materials, 2,312 tons from stockpile; 463 tons from scrapping: total, 5,475 tons

4909 tons used, 566 tons stockpiled for Q2/36.

[SIZE=3]Industrial Account[/SIZE]
[SIZE=1]Note: this is necessary to show as Chile's factories are partly worn, partly repaired.[/SIZE]

Factory 1 - Full (100%) (Committed to IP)
Factory 2 - Full (100%) (Committed to IP)
Factory 3 - Worn (90%), .06 IP to repair (Committed to IP)
Factory 4 - Worn (90%), .5 IP to repair (Committed to IP)
Factory 5 - Worn (90%), .5 IP to repair (Committed to IP)
Factory 6 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 7 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 8 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 9 - Full Production (Committed to IP) (Factory was completed earlier in 1935, and is not worn from war production.)

[SIZE=3]Infrastructure Development[/SIZE]
- 3/9 factories (repaired) committed to Infrastructure (0.3 IP)
- 3/9 factories (worn) committed to Infrastructure (0.27 IP)
TOTAL: .57 IP available.

0.5 IP added to Factory #4 to fix.
0.06 IP added to Factory #3 to fix, (added to 0.44 IP from Q4/35).
0.01 IP added to Factory #5, 0.49 IP remaining to fix.

[SIZE=3]Naval Construction[/SIZE]

at Talcahuano:
D3: idle
S3: idle
D2: idle
D2: idle
S2: idle
S1: idle
D0: idle

at Valparaiso:
S1: Dragaminas Type-1935 minesweeper DM-5 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q1/1936 (launches 02/23/36); 140 tons remaining until completion (on May 12th, 1936)
S1: idle
D1: idle

at Mejillones:
S0: Dragaminas Type-1935 minesweeper DM-6 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q1/1936 (launches 02/23/36); 140 tons remaining until completion (on May 12th, 1936)
S0: idle
D0: idle

from factories:
N/A

Dockside:
- Dragaminas Type-1935 minesweeper DM-1 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q1/1936. Launched 11/23/35; completes February 12th (2/12/36)
- Dragaminas Type-1935 minesweeper DM-2 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q1/1936. Launched 11/23/35; completes February 12th (2/12/36)
- Dragaminas Type-1935 minesweeper DM-3 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q1/1936. Launched 11/23/35; completes February 12th (2/12/36)
- Dragaminas Type-1935 minesweeper DM-4 finishing. 425 tons and 4.425 months required to complete. 140 tons added in Q1/1936. Launched 11/23/35; completes February 12th (2/12/36)

On Trials
- Dragaminas Type-1935 minesweeper DM-1 on trials from February 12th to May 12th.
- Dragaminas Type-1935 minesweeper DM-2 on trials from February 12th to May 12th.
- Dragaminas Type-1935 minesweeper DM-3 on trials from February 12th to May 12th.
- Dragaminas Type-1935 minesweeper DM-4 on trials from February 12th to May 12th.

[SIZE=3]Transactions[/SIZE]
- 400 tons to Atlantis for purchase of Admiralty Type 1 DDs
- 800 tons to Atlantis for purchase of Alphabet-B class DDs
- 1168 tons to Atlantis for reconstruction of Admiralty Type 1 DDs
- 1411 tons to Atlantis for major refit of Alphabet-B class DDs
Total: 3779 tons sent to Atlantis

[SIZE=3]Other Notes[/SIZE]
N/A

Order of Battle (Armada de Chile) end of Q4 1935[/SIZE]

Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Dreadnought Battleships............2(0)+0
Dreadnought Battlecruisers........1(0)+0
Predreadnoughts......................2(0)+0
Coast Defense Ships.................1(0)+0
Aircraft Carrier.........................1(0)+0
Armoured Cruisers....................3(0)+0
Heavy Cruiser...........................2(0)+0
Light Cruisers...........................7(0)+0
Protected Cruisers....................2(0)+0
Floatplane Cruisers...................1(0)+0
Destroyers..............................15(8)+0 {1,200 tons std and up}
Light Destroyers.......................6(0)+0 {under 1,200 tons std}
Submarines.............................8(0)+0
Floatplane Carriers...................2(0)+0
Subchasers.............................24(0)+0
Minesweepers.........................0(0)+4
Tenders.................................2(0)+0
Colliers...................................2(0)+0
Sail Training Sloop...................1(0)+0
Attack Transports....................0(4)+0
Transports..............................2(0)+0

-Emergency Use-
Patrol Boats..........................11(0)+0
Transports............................12(0)+0
Museum Ships.......................1(0)+0