Dear visitor, welcome to WesWorld.
If this is your first visit here, please read the Help. It explains in detail how this page works.
To use all features of this page, you should consider registering.
Please use the registration form, to register here or read more information about the registration process.
If you are already registered, please login here.
Chinese Naval Developments – Q2/1936
Chinese Naval Developments – Q2/1936:
A. Industiral Allocation
Stockpile after Q1/1936: 1257tons
7/9 factories (non-fixed) to naval materials: 7000 tons created for Q2/1936
used at Tianjin (Taku) 1946tons
used at Shanghai 3100tons
used at Zhanjiang 700tons
used at Kao-hsiung 0tons
used at Taipei 1500tons
used for small vessels 0tons
used for Transaction 1000tons
warmaterial recycling 0tons (first quarter)
warmaterial recycling 0tons (second quarter)
=> 7000tons (manufactured) + 1257tons (stockpiled) + 0tons (recycled) - 1000tons (Transaction) = 7257tons
Stockpile after Q2/1936: 11tons
B. Infrastructure Development
2 factory (non-fixed) to infrastructure: 0.2 pts produced;
C. Naval Construction
Bohai Shipbuilding at Tianjin:
Type 2 slip CL PRN Guilin; 4999tons needed; 1000tons received
Type 1 slip not in use
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use
Type 0 drydock not in use
Type 0 drydock not in use
Freefloating / in completation:
Persian APD-1; 510tons needed; 350tons received;
U-6; 149tons needed; 149tons received; finished
U-7; 149tons needed; 149tons received; finished
U-8; 149tons needed; 149tons received; finished
U-9; 149tons needed; 149tons received; finished
Kiangnan Dock & Engineering Works at Shanghai:
Type 2 slip CL PRN Hong Ming; 4999tons needed; 1000tons received
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 3 drydock upgrading to a Type 3 drydock; 0.7 Pts needed; 0.7 Pts received; finished
Type 2 drydock not in use
Freefloating / in completation:
HSCV PRN Zhuhai: 3800tons needed; 1800tons received
Huangfen 610; 516tons needed; 300tons received
Hudong-Zhonghua Shipbuilding at Zhanjiang:
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use
Freefloating / in completation:
PRN APD-1; 510tons needed; 350tons received
Persian APD-2; 510tons needed; 350tons received
Waigaoqiao Shipbuilding at Kaoshiun:
Type 0 drydock: not in use
Type 0 drydock: not in use
Type 1 drydock: not in use
Freefloating / in completation:
Quindao Beihai Shipbuilding at Taipei:
Type 0 drydock: not in use
Type 2 drydock: not in use
Type 3 drydock: CV PRN Fuzhou; 9007tons needed; 1500tons received
Freefloating / in completation:
D. Transactions
1000tons transfered to SIAM for the carrier (2/4)
E. Other Notes
received 0.3IP’s from India for upgrading shipyards
received 0.2IP’s from Phillipines for upgrading shipyards
F. Small vessels
None
G. Shakedown cruises
small trials (ships under 499tons) = 3 month:
PB Dagu 309
PB Dagu 310
U-2
U-3
U-4
U-5
great trials (ships over 500tons) = 6 month:
DD Z-3
DD Z-4
######################
Hope there is no fault in my report
######################