You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, August 6th 2008, 5:22pm

Chinese Naval Developments – Q2/1936

Chinese Naval Developments – Q2/1936:

A. Industiral Allocation

Stockpile after Q1/1936: 1257tons

7/9 factories (non-fixed) to naval materials: 7000 tons created for Q2/1936

used at Tianjin (Taku) 1946tons
used at Shanghai 3100tons
used at Zhanjiang 700tons
used at Kao-hsiung 0tons
used at Taipei 1500tons

used for small vessels 0tons

used for Transaction 1000tons


warmaterial recycling 0tons (first quarter)
warmaterial recycling 0tons (second quarter)


=> 7000tons (manufactured) + 1257tons (stockpiled) + 0tons (recycled) - 1000tons (Transaction) = 7257tons


Stockpile after Q2/1936: 11tons


B. Infrastructure Development

2 factory (non-fixed) to infrastructure: 0.2 pts produced;



C. Naval Construction

Bohai Shipbuilding at Tianjin:
Type 2 slip CL PRN Guilin; 4999tons needed; 1000tons received
Type 1 slip not in use
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use
Type 0 drydock not in use
Type 0 drydock not in use


Freefloating / in completation:
Persian APD-1; 510tons needed; 350tons received;
U-6; 149tons needed; 149tons received; finished
U-7; 149tons needed; 149tons received; finished
U-8; 149tons needed; 149tons received; finished
U-9; 149tons needed; 149tons received; finished


Kiangnan Dock & Engineering Works at Shanghai:
Type 2 slip CL PRN Hong Ming; 4999tons needed; 1000tons received
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 3 drydock upgrading to a Type 3 drydock; 0.7 Pts needed; 0.7 Pts received; finished
Type 2 drydock not in use


Freefloating / in completation:
HSCV PRN Zhuhai: 3800tons needed; 1800tons received
Huangfen 610; 516tons needed; 300tons received



Hudong-Zhonghua Shipbuilding at Zhanjiang:
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock not in use

Freefloating / in completation:
PRN APD-1; 510tons needed; 350tons received
Persian APD-2; 510tons needed; 350tons received


Waigaoqiao Shipbuilding at Kaoshiun:
Type 0 drydock: not in use
Type 0 drydock: not in use
Type 1 drydock: not in use

Freefloating / in completation:


Quindao Beihai Shipbuilding at Taipei:
Type 0 drydock: not in use
Type 2 drydock: not in use
Type 3 drydock: CV PRN Fuzhou; 9007tons needed; 1500tons received

Freefloating / in completation:



D. Transactions
1000tons transfered to SIAM for the carrier (2/4)


E. Other Notes
received 0.3IP’s from India for upgrading shipyards
received 0.2IP’s from Phillipines for upgrading shipyards



F. Small vessels
None

G. Shakedown cruises
small trials (ships under 499tons) = 3 month:
PB Dagu 309
PB Dagu 310
U-2
U-3
U-4
U-5

great trials (ships over 500tons) = 6 month:
DD Z-3
DD Z-4


######################
Hope there is no fault in my report
######################