A. Industrial Allocation
11/28 factories to naval materials: 11,177 metric tons (11,000 tons) created for Q1/1922.
17/28 factories (committed) to infrastructure development: 1.7 points for Q1/1922.
0/28 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.
B. Infrastructure Development
2 new factories with 5 points each completed in Q4/1921.
1.7 infrastructure points created for Q1/1922.
1 point added to new factory #1.
0.3 points added to new factory #2.
0.2 points added to new Class 0 drydock at Tallinn.
0.2 points aded to a new Class 0 drydock at Sevastopol.
1 new factory with 6 points completed in Q1/1922.
1 new factory with 5.3 points completed in Q1/1922.
1 new Class 0 drydock at Tallinn with 0.2 points completed in Q1/1922.
1 new Class 0 drydock at Sevastopol with 0.2 points completed in Q1/1922.
C. Naval Construction
At Petrograd
Class 4 Slip #1 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 4 Slip #2 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 4 Slip #3 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 4 Slip #4 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 3 Slip #1 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 3 Slip #2 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 3 Slip #3 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 3 Slip #4 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 2 Slip #1 – Idle
Class 2 Slip #2 – Idle
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 1 Slip #3 – Idle
Class 1 Slip #4 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #1 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #2 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #3 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #4 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
At Arkhangelsk
Class 4 Slip #1 – Idle
Class 2 Slip #1 – Idle
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #1 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #2 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #3 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #4 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
At Rostov
Class 3 Slip #1 – Idle
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 0 Slip #1 – Idle
Class 0 Slip #2 – Idle
At Vladivostok
Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Conversion of the predreadnought battleship Tsesarevich into the floating crane Trud. 1,508 metric tons added in Q1/1922. 5,171 metric tons remaining.
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 0 Drydock #1 – Idle
Class 0 Slip #1 – Idle
Class 0 Slip #2 – Idle
At Tallin
Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Sevastopol
Class 3 Drydock #1 – Conversion of the collier Canopus to an experimental aircraft carrier. 6,800 metric tons completed by Q1/22 to finish.
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Murmansk
Class 4 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Cam Ranh Bay (Indochina (France))
Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle
At Astrakhan
Class 0 Drydock #1 – Idle
At Petropavlovsk-Kamchatky
Class 1 Drydock #1 – Idle
Launched ships being completed:
Sviatoslav class heavy cruisers
Kniaz Sviatoslav – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.
Kniaz Sviatopolk – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.
Andrei Oslyaba – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.
Aleksandr Peresvet – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.
D. Transactions
None.
E. Other Notes
All materials for converting the collier Canopus to an aircraft carrier have been produced. The conversion will be complete in mid-January 1922.
F
. Updated Order of Battle, 3/31/22
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 10(0)+0
BC: 4(0)+0
CV: 1(0)+0
CA: 3(0)+4
CL: 19(4)+0
Monitors: 0(0)+0
DD: 110(0)+0
Sloops: 0(0)+0
Fleet Submarine: 30(0)+0
Coastal Submarine: 100(0)+0