You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, December 30th 2003, 3:19pm

Report of the Russian Federation - 1/1/22

A. Industrial Allocation

11/28 factories to naval materials: 11,177 metric tons (11,000 tons) created for Q1/1922.

17/28 factories (committed) to infrastructure development: 1.7 points for Q1/1922.

0/28 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced.

B. Infrastructure Development

2 new factories with 5 points each completed in Q4/1921.
1.7 infrastructure points created for Q1/1922.

1 point added to new factory #1.
0.3 points added to new factory #2.
0.2 points added to new Class 0 drydock at Tallinn.
0.2 points aded to a new Class 0 drydock at Sevastopol.

1 new factory with 6 points completed in Q1/1922.
1 new factory with 5.3 points completed in Q1/1922.
1 new Class 0 drydock at Tallinn with 0.2 points completed in Q1/1922.
1 new Class 0 drydock at Sevastopol with 0.2 points completed in Q1/1922.

C. Naval Construction

At Petrograd

Class 4 Slip #1 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 4 Slip #2 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 4 Slip #3 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 4 Slip #4 – Arctica class icebreaker. 938 metric tons added in Q1/1922.
Class 3 Slip #1 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 3 Slip #2 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 3 Slip #3 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 3 Slip #4 – General Admiral Apraxin class Light cruiser. 1,700 metric tons added in Q1/1922.
Class 2 Slip #1 – Idle
Class 2 Slip #2 – Idle
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 1 Slip #3 – Idle
Class 1 Slip #4 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #1 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #2 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #3 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #4 – Oka class fast minelayer. 148 metric tons added in Q1/1922.

At Arkhangelsk

Class 4 Slip #1 – Idle
Class 2 Slip #1 – Idle
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #1 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #2 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #3 – Oka class fast minelayer. 148 metric tons added in Q1/1922.
Class 0 Slip #4 – Oka class fast minelayer. 148 metric tons added in Q1/1922.

At Rostov

Class 3 Slip #1 – Idle
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 0 Slip #1 – Idle
Class 0 Slip #2 – Idle

At Vladivostok

Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Conversion of the predreadnought battleship Tsesarevich into the floating crane Trud. 1,508 metric tons added in Q1/1922. 5,171 metric tons remaining.
Class 1 Slip #1 – Idle
Class 1 Slip #2 – Idle
Class 0 Drydock #1 – Idle
Class 0 Slip #1 – Idle
Class 0 Slip #2 – Idle

At Tallin

Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle

At Sevastopol

Class 3 Drydock #1 – Conversion of the collier Canopus to an experimental aircraft carrier. 6,800 metric tons completed by Q1/22 to finish.
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle

At Murmansk

Class 4 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle

At Cam Ranh Bay (Indochina (France))

Class 3 Drydock #1 – Idle
Class 1 Drydock #1 – Idle
Class 0 Drydock #1 – Idle

At Astrakhan

Class 0 Drydock #1 – Idle

At Petropavlovsk-Kamchatky

Class 1 Drydock #1 – Idle

Launched ships being completed:

Sviatoslav class heavy cruisers
Kniaz Sviatoslav – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.
Kniaz Sviatopolk – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.
Andrei Oslyaba – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.
Aleksandr Peresvet – 10,959 metric tons completed by Q4/21. 279 metric tons added in Q1/1922.

D. Transactions

None.

E. Other Notes

All materials for converting the collier Canopus to an aircraft carrier have been produced. The conversion will be complete in mid-January 1922.

F. Updated Order of Battle, 3/31/22

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 10(0)+0
BC: 4(0)+0
CV: 1(0)+0
CA: 3(0)+4
CL: 19(4)+0
Monitors: 0(0)+0
DD: 110(0)+0
Sloops: 0(0)+0
Fleet Submarine: 30(0)+0
Coastal Submarine: 100(0)+0