*subject to editing*
A. Industrial Allocation
3/6 factories (non-fixed) to naval materials: 3,000 tons created for Q4/1935 plus 1,427 tons transfered from Bulgaria, plus 717 tons stockpiled from Q3 = 5,144 tons
5,106 tons used, 38 tons stockpiled for next quarter
1/6 factories (fixed) to infrastructure development: 0.1 points plus 0.1 bonus points for Q4/1935
2/6 factories (non-fixed) to infrastructure development: 0.2 points for Q4/1935
Total 0.4 points created for Q4/35
B. Infrastructure Development
0.4 points added to one Type 0 drydock at Istambul
C. Naval Construction
Istambul
Type 1 slip #1 - DD Bartin building, 1,878 tons needed, 578 tons used, 500 tons added
Type 1 slip #2 - DD Bafra building, 1,878 tons needed, 578 tons used, 500 tons added
Type 1 slip #3 - DDL Togrul building, 2,848 tons needed, 848 tons used, 500 tons added
Type 1 slip #4 - completed
Type 0 slip #1 - Idle
Type 0 slip #2 - Idle
Type 0 drydock #1 under construction, 0.5 IP's used, 0.4 IP's added
DD's Bozcaada and Bodrum, freefloating, 1,878 tons needed (each), 1,478 tons used (each), 400 tons added to each
Izmit
Type 3 drydock #1 - Idle
Type 2 slip #1- Bulgarian CL Maritsa building, 7,072 tons needed, 436 tons used, 1,306 tons added
Type 1 drydock #1 - Idle
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
DDL Seljuk freefloating, 2,848 tons needed, 2,448 tons used, 400 tons added,
Samsun
Type 3 drydock #1 - Idle
Type 1 drydock #1 - Idle
Type 0 drydock #2 - Idle
Icel
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 3 drydock #1 - completed
Type 0 slip #1 - Idle
Type 0 drydock #1 - Idle
DD's Bandirma and Beykoz, freefloating, 1,878 tons needed (each), 1,578 tons used (each), 300 tons added to each
Trabzon
Type 1 drydock #1 - Idle
Launched ships being completed:
DDL Seljuk building. complete at the end of quarter
DD's Bozcaada, Bodrum, Bandirma and Beykoz complete at the end of the quarter
Ships completed/transfered and on trials
none
Summary of ship building/repairs/rebuilds and convertions.
CL Maritsa building for Bulgaria
DDL Seljuk freefloating, complete at end of quarter
DDL Togrul building
DD's Bartin and Bafra building
DD's Bozcaada, Bodrum, Bandirma and Beykoz freefloating, complete at end of quarter
D. Transactions
- 500 tons to Germany for two Karlesruhe class CL's
7719 tons needed to complete transaction
- 787 tons transferred from Bulgaria for payment for light cruiser design
- 435 tons transferred from Bulgaria 08/35 for construction of CL-2 (Maritsa) in September (one month's construction materials)
E. Other Notes
18 Atlantean type 202 MTB's ordered
F. Updated Order of Battle, 1/1/35
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB:..................................3(0)0
BC:..................................1(0)0
PD:..................................1(0)0 *taken out of service*
AC:..................................1(0)0
CA:..................................1(0)0
PC:..................................2(0)0
CL:...................................6(0)1 * For Bulgaria*, 2 purchased from Germany
DDL:................................6(0)2
DD:..................................19(0)6
Torpedo boats:..................24+*7(0)0 *taken out of service
Sloops:.............................1(0)0 taken out of service
Frigates:...........................0(0)0
Moniters:..........................0(0)0
Torpedo gunboats:.............2(0)0
Gunboats:.........................8(0)0
Patrol vessels:...................24(0)0
MTB's:.............................18(0)0 all transfered to Bulgaria
Mine sweepers:.................6+*2(0)0 *Kirsund and Intibah taken out of service*
Minelayers:.......................0(0)0
Mine warfare ships:............5(0)0
Sub chasers:.....................36(0)0
Motor Launches:................39(0)0 *9 transfered to Byzantium
Motor Launche/minlayers:..10(0)0
Fleet Submarine:...............0(0)0
Coastal Submarine:...........0(0)0
Floatplane carrier/tenders:..0(0)0
destroyer depot ships:........2(0)0
Submarine depot ships:......0(0)0
Auxillary's:.........................N/A