Quoted
The alterations of the port itself included both strenghtening the defences as making the port suitable for handling about 250.000 tons of cargo each month. The latter was in fact the most difficult and costly job, as it included deepening the entrance by one metre and the addition of new facilities. Navigation lights were placed along the entrance, a dozen mooring- buoys were laid in the port near the island Noesa Kambang and new piers with electric cranes were built for unloading the ships.
Forum Software: Burning Board® Lite 2.1.2 pl 1, developed by WoltLab® GmbH