You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, October 29th 2007, 12:00am

Denmark, Quarter 4, 1934

Danish Naval Developments Q4 1934

a/ Industrial Allocation
8/11 factories producing materiel for shipbuilding = 8000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts + 0.3 Bonus pts
0/11 Factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Drydock No.1 (Type 0) Former Siamese site at Phuket commences extension to Type 1, receives 0.2 IP point, balance 0.5 IP points
Drydock No.1 (Type 0) at Berbera, continues construction, receives 0.1 IP point, balance 0.1 IP points
Drydock No.1 (Type 0) at St.Thomas, continues construction, receives 0.1 IP point, balance 0.1 IP points

c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Idle
No.2 type 2 slip - Idle
No.3 type 1 slip  Odysseus, DD, laid down 02/04/34, receives 536 tons, balance 348 tons
No.4 type 1 slip - Teucer, DD, laid down 02/04/34, receives 536 tons, balance 348 tons
No.1 type 3 drydock  Magni, CV, reconstruction started 01/08/34, receives 1701 tons, balance 15740 tons
Dock side - Idle

Aarhus-
No.1 type 3 slip  Idle
No.2 type 2 slip  Idle
No.3 type 1 slip  Idle
No.4 type 1 slip  Idle
No.1 type 3 drydock  Modi, CV, reconstruction started 01/08/34, receives 1701 tons, balance 15740 tons
No.2 type 2 drydock - Idle
Dock side  Idle

Aalborg-
No.1 type 1 slip  Idle
No.2 type 1 slip  Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.5 type 1 slip  Protector, CDS, laid down 01/07/1934, receives 1307 tons, balance 7,239tons
No.6 type 1 slip - Sentinel, CDS, laid down 02/01/1934, receives 1307 tons, balance 4,625 tons

Dock side - Idle

Phuket-
No.1 type 0 drydock - EXTENDING
No.2 type 1 drydock - Idle

Berbera-
No.1 type 0 drydock  BUILDING

St. Thomas-
No.1 type 0 drydock  BUILDING

d/ Transactions
0.2 IP Points to Italy in part payment for cruiser hulls

e/ Other Notes
KDM MTC037 to MTC045 commission on 31/12/1934
KDM Eias commissions on 17/11/1934
KDM Toki continues sea trials until 22/02/1935
KDM Hemingr continues sea trials until 22/02/1935
KDM Robin Hood continues sea trials until 22/02/1935
KDM Legolas continues sea trials until 22/02/1935
KDM Lancer (l) continues sea trials until 14/03/1935
KDM Lancer (m) continues sea trials until 14/03/1935
KDM Lancer (n) continues sea trials until 14/03/1935



Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 1286 tons

f/ Order of Battle
Note: X(Y)+Z = In Service (under repair/refit) + building/on order (breaking)

BB = 02 (0) + 0/0 (0)
CDS = 00 (0) + 2/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 00 (0) + 2/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 29 (0) + 9/0 (4)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
MTC = 45 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)