Danish Naval Developments Q1 1934
a/ Industrial Allocation
8/11 factories producing materiel for shipbuilding = 8000 tons
3/11 factories (fixed) producing infrastructure materiel =0.3 pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Drydock No.1 (Type 0) Former Siamese site at Phuket commences extension to Type 1, receives 0.1 IP point, balance 0.9 IP points
Drydock No.1 (Type 0) at Berbera, continues construction, receives 0.1 IP point, balance 0.4 IP points
Drydock No.1 (Type 0) at St.Thomas, continues construction, receives 0.1 IP point, balance 0.4 IP points
c/ Naval Construction
Copenhagen-
No.1 type 3 slip - Eias, CA, laid down 02/08/32, receives 1769 tons, balance 550 tons
No.2 type 2 slip - Idle
No.3 type 1 slip - Idle
No.4 type 1 slip - Idle
No.1 type 3 drydock - Idle
Dock side - Idle
Aarhus-
No.1 type 3 slip Idle
No.2 type 2 slip Idle
No.3 type 1 slip Toki, DD, laid down 02/10/33, receives 536 tons, balance 884 tons
No.4 type 1 slip Hemingr, DD, laid down 02/10/33, receives 536 tons, balance 884 tons
No.1 type 3 drydock Idle
No.2 type 2 drydock - Idle
Dock side Idle
Aalborg-
No.1 type 1 slip Robin Hood, DD, laid down 02/10/33, receives 536 tons, balance 884 tons
No.2 type 1 slip Legolas, DD, laid down 02/10/33, receives 536 tons, balance 884 tons
No.3 type 1 slip - Lancer (l), DDL, laid down 02/10/33, receives 400 tons, balance 746 tons
No.4 type 1 slip - Lancer (m), DDL, laid down 02/10/33, receives 400 tons, balance 746 tons
No.5 type 1 slip - Lancer (n), DDL, laid down 02/10/33, receives 400 tons, balance 746 tons
No.6 type 1 slip Sentinel, CDS, laid down 02/01/1934, receives 1307 tons, balance 8,546 tons
Dock side - Idle
Phuket-
No.1 type 0 drydock - EXTENDING
No.2 type 1 drydock - Idle
Berbera-
No.1 type 0 drydock BUILDING
St. Thomas-
No.1 type 0 drydock BUILDING
d/ Transactions
2 x cruiser hulls acquired from Italy for conversion,
currently undergoing tear-down to base level before reconstruction
e/ Other Notes
KDM MTC010- MTC018 commission on 31/03/1934
KDM Einmyria continues sea trials until 19/05/1934
KDM Diana continues sea trials until 25/05/1934
KDM William Tell continues sea trials until 25/05/1934
KDM Lancer (i) continues sea trials until 14/06/1934
KDM Lancer (j) continues sea trials until 14/06/1934
KDM Lancer (k) continues sea trials until 14/06/1934
KDM Skalmold continues sea trials until 15/06/1934
KDM Herja continues sea trials until 15/06/1934
KDM D1 D4 complete scrapping on 11/01/1934
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 1587 tons
f/ Order of Battle
Note:
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 0/0 (0)
CDS = 00 (0) + 1/0 (0)
CA = 02 (0) + 2/0 (0)
CL = 20 (0) + 2/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 28 (0) + 12/0 (4)
SL = 16 (0) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
MTC = 18 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)