Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, July 29th 2007, 3:25pm

Poland Q1/35

Poland Q1 1935

A. Factories
2/4 factories = 2000t produced + 2000t transferred = 4000t
4000t used, 0t stockpiled

2/4 factories (committed) = 0.2IP’s
0/4 factories (flexible)

B. Infrastructure Development

Factory P5 (.2IP used, 3.3IP to complete)


C. Naval Development and Construction

at Danzig:
1 Type 2 slip Idle
1 Type 1 slips Idle
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 1 drydock Idle
Free Floating slip CA Vz31 2 laid down October 01 33, 2828t used (0t to complete), launched Nov 01 1934, completed March 01 35

at Koszalin
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 3 drydock BC Warzawa laid down February 01 35, 1172t used (24522t to complete)
Type 0 drydocks idle


D. Transactions

1000t transferred from Yugoslavia

1000t transferred from Romania

E. Other Notes

Ships laid down this quarter: BC Warzawa

CA VZ31 2 start shakedown cruise

DD Peggy Brown 4 to 6 continue shakedown cruise

F. Scrappage Report

none

G. Updated Order of Battle, 30 March 35

Note: (Y)+Z = completed (under repair/refit) + under construction

BB: 2(0)+0
BC: 0(0)+1
CA: 2(0)+0
CL: 1(0)+0
DD: 4(0)+0
FTB: 14(0)+0
AG: 3(0)+0
SS: 6(0)+0
MS: 6(0)+0
GB: 2(0)+0
M: 18(0)+0