Poland Q3 1934
A. Factories
2/4 factories = 2000t produced
2000t used, 0t stockpiled
2/4 factories (committed) = 0.2IP’s
0/4 factories (flexible)
B. Infrastructure Development
Factory P5 (0.1P used, 4.9P to complete)
Type 2 drydock extension continues
C. Naval Development and Construction
at Danzig:
1 Type 2 slip CA Vz31 2 laid down October 01 33, 1000t used (3828 to complete)
1 Type 1 slips Idle
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 1 drydock Idle
Free floating- DD Peggy Brown 4 laid down April 01 33, 0t used (0t to complete), launched Jan 01 34, completed April 01 34
Free floating- DD Peggy Brown 5 laid down April 01 33, 0t used (0t to complete), launched Jan 01 34, completed April 01 34
at Koszalin
1 Type 1 slips Idle
1 Type 0 slips Idle
1 Type 0 slips Idle
1 Type 2 drydock extending (0.1 IP’s, 0.3 IP’s to complete)
Type 0 drydocks idle
Free floating- DD Peggy Brown 6 laid down April 01 33, 0t used (0t to complete), launched Jan 01 34, completed April 01 34
D. Transactions
1000t transferred to Yugoslavia
E. Other Notes
Ships laid down this quarter: none
DD Peggy Brown 4 to 6 start shakedown cruise
F. Scrappage Report
none
G. Updated Order of Battle, 30 September 1934
Note: (Y)+Z = completed (under repair/refit) + under construction
BB: 2(0)+0
CA: 1(0)+1
CL: 1(0)+0
DD: 4(0)+0
FTB: 14(0)+0
AG: 3(0)+0
SS: 6(0)+0
This post has been edited 1 times, last edit by "perdedor99" (Jun 7th 2007, 12:26am)