You are not logged in.

1

Wednesday, June 6th 2007, 12:43am

Yugoslavia Q3/33

Yugoslavia
Quarter 3 1933


A. Factories

2/2 factories = 2000t produced

0/11 factories (committed)
0/11 factories (flexible)

B. Infrastructure Development

none

C. Naval Development and Construction

at Belgrade:
1 Type 0 slip Idle
1 Type 0 drydock Idle

at Bar
1 Type 1 slip
2 Type 0 slips Idle
1 Type 1 drydock Idle
1 Type 0 drydock Idle

D. Transactions

1000t transferred to Poland

1000t transfered to Romania

E. Other Notes

Ships laid down this quarter: none

F. Scrappage Report

none

G. Updated Order of Battle, 30 September 1933

CL 1(0)+0
DD 6(0)+0
DE 6(0)+0
SC 2(0)+0
TB 15(0)+0
M/ML 9(0)+0

2

Wednesday, June 6th 2007, 12:45am

basically Yugoslavia is helping their allies during 1933. Construction of their Peggy Browns will start in 1934.

This post has been edited 1 times, last edit by "perdedor99" (Jun 6th 2007, 12:46am)