You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, March 30th 2007, 3:13am

Colombia Q2/34

Columbia

A. Industrial Allocation

2/4 factories (non fixed) to naval materials: 2,000 tons created for Q2/1934 + 255 tons stockpiled from Q1/34

Total warship materials: 2,255

2,255 tons used for ship building, 0 tons stockpiled for next quarter.

1/4 factory's (fixed) to infrastructure development: 0.1 points for Q2/1934
1/4 factory's (non fixed) to infrastructure development: 0.1 points for Q2/1934
0.3 IP's recieved from Atlantis in Q2/1934

Total: 0.5 infrastructure points created for Q2/34

B. Infrastructure Development

0.5 points added to new type 3 slip at Cartagena

C. Naval Construction

Cartagena:
Class 3 Slip #1 - under construction, 3.0 points needed, 1.0 points used, 0.5 points added
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - 611 type MGB #22 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - 611 type MGB #23 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

MGB-17 and MGB-18 completed, begin trials

Buenaaventura:
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - 611 type MGB # 24 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - 611 type MGB # 25 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - 611 type MGB # 26 laid down, 177 tons needed, 177 tons added
Class 0 Slip #4 - Idle
Class 3 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

MGB's 19 through 21 completed, begin trials

Launched ships being completed:

None

Ships completed/transfered and on trials

5x611 type MGB's

Building summary

5x611 type MGB's laid down (885 tons)

D. Transactions

0.3 IP's recieved from Atlantis

1,000 tons transfered to Atlantis transfered for 2 J class DD's
370 tons transfered to Atlantis for Danaus class CLAA plans


E. Other Notes

Armoured cruisers Cali and Medellin taken out of service to provide crews for Atlantean CL's
4 J class DD's ordered, 2 to be built in Atlantis, 2 in Colombia.

F. Miscellaneous Works

None.

F. Updated Order of Battle, 6/1/34

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships:................................0(0)0
Pre dreadnoughts:.......................2(0)0
Armoured Cruisers:.....................2(0)0
Light Cruisers.............................2(0)0
Destroyers:.................................8(0)2 * In Atlantis
Torpedo boats:............................5(0)0
escorts:......................................0(0)0
Gunboats:..................................6(0)0
River Gunboats...........................2(0)0
Submarines:...............................0(0)0
Patrol vessels:............................1(0)0 Armed Tug Jose Felix Ribas
Mine warfare ships:.....................0(0)0
Sub chasers:.............................0(0)0
Motor Gun Boats:......................20(0)5
Motor Launches:........................5(0)0
Motor Torpedo boats:.................40(0)0
Coastal Motor Torpedo Boats:......40(0)0 * purchased from Atlantis
Depot ships:..............................0(0)0
Auxillary's:................................0(0)0